Starlight Mineral Resource Grows by 91%
12.9Mt @ 2.7g/t Au for 1.13Moz demonstrates potential for production
growth and extended mine life
Perth, Western Australia, 13 November 2024: Westgold Resources Limited (ASX: WGX, TSX:
WGX, OTCQX: WGXRF – Westgold or the Company) is pleased to provide this update on the reevaluation of the company’s Fortnum Project in the Murchison.
Highlights
Starlight Mineral Resource Estimate now 12.9Mt at 2.7g/t Au for 1.13Moz of gold - a
91% increase since June 2024.
The expanded Mineral Resource Estimate is the result of concerted 2-year drilling
program – focused on expanding the Mineral Resource to provide options for future
growth at Fortnum.
The expanded Starlight Mineral Resource Estimate comprises two components:
An underground Mineral Resource of 8.7Mt @ 3.0g/t for 840koz - a 43% increase
since June 2024, following a 41% increase in the year to June 2024.
A newly estimated Open Pit Mineral Resource of 4.2Mt @ 2.2g/t au for 290koz.
The new enlarged Mineral Resource has seen Westgold initiate a Scoping Study to
investigate expansion options (both underground and open pit) at Fortnum.
The Fortnum Expansion Project (FXP) Scoping Study is progressing with results to
be reported in Q2, FY25.
Westgold Managing Director and CEO Wayne Bramwell commented:
“A 91% increase in the Mineral Resource Estimate at Starlight marks two significant milestones
for Westgold and the Fortnum Project.
Our technical team has drilled continuously for two years to extend mine life and has now defined
Mineral Resources that offer the potential to integrate both open pit and underground mining to
expand Fortnum production. Importantly, this result demonstrates the organic growth
opportunities that exist within Westgold’s portfolio.
Westgold has commenced a Scoping Study to evaluate expansion options with results of the
Fortnum Expansion Project (FXP) study due in Q2, FY25.”
Westgold Resources Limited
ABN 60 009 260 306
ASX: WGX | TSX: WGX | OTC: WGXRF
westgold.com.au
T: +61 8 9462 3400
E: perth.reception@westgold.com.au
Level 6, 200 St Georges Terrace
Perth WA 6000
PO Box 7068, Cloisters Square WA 6850
Fortnum Project, Murchison Region - Western Australia
Westgold’s Fortnum Project is located within Westgold’s Murchison business unit in Western
Australia, approximately 140 km north of Meekatharra and encompass the 0.9 Mtpa Fortnum
processing plant and the Fortnum, Horseshoe and Peak Hill mining areas [Figure 1].
The Starlight underground mine is the predominant feed source (90% of all processed tonnes
with the additional 10% of ore sourced from surface stockpiles) to Westgold’s Fortnum
processing hub.
Figure 1 – Location Map of Westgold’s Fortnum Project
Homestake Gold Mines (Homestake) developed the Fortnum mineral field during the 1980s, after
regional reconnaissance work discovered gold mineralisation in outcrop at Tom’s Hill. The Trev’s,
Dougie’s and Twilight gold deposits (all part of the Starlight Mineralisation Complex) were mined
as open pits by Homestake from 1989 to 1993.
In total ~525,000 ounces of gold have been produced historically from Starlight at ~3.1g/t
Au to a total depth of 260m by previous open pit and shallow underground operators (+2,000
ounces per vertical metre) before mining ceased.
Between 1994 and 1998 Perilya Gold Mines subsequently mined the Trev’s – Starlight open pits,
then the Starlight - Twilight underground from 1999 to 2001.
Westgold has subsequently mined +307koz from Starlight underground.
Mineral Resource Grows by 91% at Starlight
13 November 2024
2
November 2024 Mineral Resource Update
Over the last two years Westgold has invested significant resources into extending the footprint
of the mineralised system at Starlight, with three rigs employed underground near-continually
over this period.
In parallel with this drilling, Westgold has undertaken a significant body of technical work to
understand mineralisation distribution and grade variability. The results of these studies have
determined that moving towards a more total extraction of the mineralised package represents
the best balance between commercial result and certainty of outcome for the Starlight mine.
Given the geological and geometric complexity at Starlight it is important to take a disciplined
approach to drilling at the mine, striking a balance between defining the limits of the mineralised
zone to allow efficient capital infrastructure placement, whilst at the same time acquiring
enough infill information to allow for a sufficient level of robustness and certainty at the detailed
mine planning and execution stage.
At the end of FY24 Westgold was able to incorporate a large portion of this drilling into a Mineral
Resource Estimate update which delivered a 41% Mineral Resource increase compared to the
FY23 Starlight Mineral Resource (refer ASX 11 June 2024 Starlight Mineral Resource Increases by
41%).
Table 1 – End of FY24 Starlight Mineral Resource Estimate
Starlight Mineral Resource Estimate
Classification
Tonnes (t)
Grade (g/t Au)
Ounces (Au)
Measured
864,000
4.0
111,000
Indicated
1,976,000
3.4
219,000
Inferred
2,588,000
3.1
260,000
Total
5,428,000
3.4
590,000
Subsequent to the end of FY24 Mineral Resource Estimate, the current Starlight Mineral
Resource Estimate was conducted. The current estimate considers:
■
Incorporation of additional drilling results acquired between estimates.
■
Depletion for mining between estimates.
■
A change in domaining approach and estimation methodology (from internal to the
mineralised package sub-domaining with ordinary kriging to a more holistic mineralised
package domaining approach and Categorical Indicator Kriging).
■
A change in extraction philosophy to that of a more comprehensive extraction of Mineral
Resource base.
■
The consideration of an open pit mining phase.
Mineral Resource Grows by 91% at Starlight
13 November 2024
3
Change in project and processing scale lowering the unit cost base and subsequent cutoff grade calculations.
■
The resultant Mineral Resource Estimate now stands at 12.9Mt at 2.7g/t Au for 1.13Moz of
gold, a 91% increase as tabulated below (Table 2, 3 and 4).
Table 2 – Current Starlight Open Pit Mineral Resource Estimate – reported above a $4k/oz open pit shell
and above 0.5g/t Au
Starlight Open Pit Mineral Resource Estimate
Classification
Tonnes (t)
Grade (g/t Au)
Ounces (Au)
Measured
400,000
2.7
40,000
Indicated
2,500,000
1.8
140,000
Inferred
1,300,000
2.7
110,000
Total
4,200,000
2.2
290,000
Table 3 – Current Starlight Underground Mineral Resource Estimate – reported below a $4k/oz open pit
shell and above 1.2g/t Au
Starlight Underground Mineral Resource Estimate
Classification
Tonnes (t)
Grade (g/t Au)
Ounces (Au)
Measured
600,000
3.7
70,000
Indicated
4,000,000
2.8
370,000
Inferred
4,100,000
3.1
400,000
Total
8,700,000
3.0
840,000
Table 4 – Current Starlight Global Mineral Resource Estimate – combined open pit and underground
portions
Starlight Open Pit Mineral Resource Estimate
Classification
Tonnes (t)
Grade (g/t Au)
Ounces (Au)
Measured
1,000,000
3.3
100,000
Indicated
6,500,000
2.4
510,000
Inferred
5,400,000
3.0
510,000
Total
12,900,000
2.7
1,130,000
Mineral Resource Grows by 91% at Starlight
13 November 2024
4
Background to the Mineral Resource Estimate
The Fortnum deposits are Paleoproterozoic shear-hosted gold deposits within the Fortnum
Wedge, a localised thrust duplex of Narracoota Formation within the overlying Ravelstone
Formation. Both stratigraphic formations comprise part of the Bryah Basin in the Capricorn
Orogen, Western Australia.
Fortnum Wedge lithologies consist of basalts and mafic tuffs with local jasperoidal chert,
intermediate tuffs, crystal tuffs and tuffaceous siltstones and felsic crystal tuff, overlain by a grey
siltstone unit regarded as a marker unit between the Narracoota volcanics and the Ravelstone
Formation. The whole Fortnum stratigraphic sequence is repeated and truncated by the thrust
duplex system and further complicated by post-mineralisation, west-northwest and southwesttrending brittle faults off-setting stratigraphy and mineralisation.
These faults are considered to be accommodation structures associated with later reactivation
of the Fortnum fault.
Figure 2 – Fortnum Wedge geology
Mineral Resource Grows by 91% at Starlight
13 November 2024
5
At Fortnum, structurally controlled vein stockworks such as Starlight, predominantly occur in the
footwall of major thrust faults and are associated with ductile siltstone and tuffaceous siltstone
units typically bounded by more competent units such as the felsic and intermediate crystal tuff.
Gold mineralisation is directly associated with zones of pyritisation, sericitisation, silicification
and albitisation around quartz veins.
Vein stockwork gold mineralisation is characterised by sub-vertical quartz veins with pyritic
selvedge’s and in sheared siltstones. The quartz veins themselves hold minimal internal grade
with the majority of the gold in the pyritic selvedges. Moderate to strong silica-sericite-albite
alteration is present proximal to mineralised vein arrays, with distal chlorite-magnetite
alteration. Mineralised vein arrays at Starlight range from sub-metre- scale through to >50 m,
with the mineralised package achieving widths of +200 m in places.
Figure 3 – Starlight solid geology model
Geological interpretation of individual deposits is carried out using a systematic approach to
ensure that the resultant Mineral Resource Estimate was both sufficiently constrained, and
representative of the expected sub-surface conditions. In all aspects of Mineral Resource
Estimation, the factual and interpreted geology was used to guide the development of the
interpretation. Geological matrixes were established to assist with interpretation and
construction of the estimation domains.
A significant portion of the data used in Mineral Resource Estimations has been gathered from
diamond core. Multiple sizes have been used. This core is geologically logged and subsequently
halved for sampling. Grade control holes may be whole-cored to streamline the core handling
process if required. Face sampling data is also utilised, where each development face / round is
Mineral Resource Grows by 91% at Starlight
13 November 2024
6
horizontally chip sampled. The sampling intervals are domained by geological constraints (e.g.
rock type, veining and alteration / sulphidation etc.).
In the near surface environment RC drilling dominates the data informing Mineral Resource
Estimations.
All geology input is logged and validated by the relevant area geologists, incorporated into this is
assessment of sample recovery. No defined relationship exists between sample recovery and
grade. Nor has sample bias due to preferential loss or gain of fine or coarse material been noted.
Faces are nominally chipped horizontally across the face from left to right, sub-set via geological
features as appropriate. Diamond drilling is half-core niche sampled, sub-set via geological
features as appropriate.
Samples undergo fine pulverisation of the entire sample by an LM5 type mill to achieve a 75 µ
product prior to splitting. QA/QC is currently ensured during the sub-sampling stages process
via the use of the systems of an independent NATA / ISO accredited laboratory contractor. The
sample size is considered appropriate for the grain size of the material being sampled. The unsampled half of diamond core is retained for check sampling if required.
Sampling is analysed for gold by fire assay as outlined below;
■
A 40 g – 50 g sample undergoes fire assay lead collection followed by flame atomic
adsorption spectrometry.
■
Quality control is ensured via the use of standards, blanks and duplicates. The laboratory
includes a minimum of 1 project standard with every 22 samples analysed. No significant
QA/QC issues have arisen in recent drilling results.
After validating the drillhole data to be used in the estimation, interpretation of the orebody is
undertaken to create the outline strings which form the basis of the three-dimensional orebody
wireframe. Wireframing is then carried out using a combination of automated stitching
algorithms and manual triangulation to create an accurate three-dimensional representation of
the sub-surface mineralised body.
Data spacing is variable dependent upon the individual lode under consideration.
Drillhole intersections within the mineralised body are defined, these intersections are then used
to flag the appropriate sections of the drillhole database tables for compositing purposes.
Drillholes are subsequently composited to allow for grade estimation. In all aspects of resource
estimation, the factual and interpreted geology was used to guide the development of the
interpretation.
Once the sample data has been composited, a statistical analysis is undertaken to assist with
determining estimation search parameters, top-cuts etc. Analysis of individual domains is
undertaken to assist with determining appropriate search parameters. Which are then
incorporated with observed geological and geometrical features to determine the most
appropriate search parameters.
Mineral Resource Grows by 91% at Starlight
13 November 2024
7
An empty block model is then created for the area of interest. This model contains attributes set
at background values for the various elements of interest as well as density, and various
estimation parameters that are subsequently used to assist in resource categorisation. The
block sizes used in the model will vary depending on orebody geometry, minimum mining units,
estimation parameters and levels of informing data available.
Grade estimation is then undertaken. The distribution of gold grades within the mineralised lodes
is highly variable and is characterised by cohesive regions of higher tenor gold grades, with
clusters of individual values often reaching over eighty grams per tonne. Whilst these highergrade zones appear reasonably cohesive, they are manifested by a high-degree of short-scale
variability, making difficult to manually interpret constraining domains. These internal; highgrade regions are often surrounded by peripheral regions of lower grade mineralisation that is
also highly variable.
The moderate to high grade variability and complex spatial continuity supports the use of
Categorical Indicator Kriging (CIK) to define internal estimation sub-domains domains, together
with applying distance limiting at chosen grade thresholds to restrict the influence of the high
grade and extreme grade values during grade interpolation.
Estimation results were validated against primary input data, previous estimates and mining
output. The Mineral Resource is then depleted for mining voids and subsequently classified in
line with JORC guidelines utilising a combination of various estimation derived parameters and
geological / mining knowledge. This approach considers all relevant factors and reflects the
Competent Person’s view of the deposit.
The cut off grades used for the reporting of the Mineral Resources Estimates is selected based
upon the style of mineralisation, depth from surface of the mineralisation and the most probable
extraction technique and associated costs.
Likely mining approaches have been considered at the domaining, estimation and classification
steps. However, no mining dilution or ore loss has been modelled in the resource model or
applied to the reported Mineral Resource Estimate. Nor has metallurgical recovery been applied
to the reported Mineral Resource Estimate. These factors are applied during the Ore Reserve
generation process.
Mineral Resource Grows by 91% at Starlight
13 November 2024
8
Looking Forward
The substantial increase in resources has seen Westgold initiate a Scoping Study to assess the
potential for an expanded and integrated open pit and underground operation at Fortnum. The
Fortnum Expansion Project (FXP) scoping study will be completed during Q2, FY25 and results
reported to the market.
Figure 4 – Starlight mine overview
This announcement is authorised for release by the Board of Directors.
Investor and media relations enquiries
Investor Relations - Australia
Annette Ellis | Investor Relations Manager
investor.relations@westgold.com.au
+61 458 200 039
Mineral Resource Grows by 91% at Starlight
13 November 2024
Investor Relations – North America
Rob Buchanan | CPIR
Rob.Buchanan@westgold.com.au
+1 416-309-0600
9
Competent Person Statements
Mineral Resource Estimates
The information in this report that relates to Mineral Resource Estimates is compiled by Westgold technical
employees and contractors under the supervision of Mr. Jake Russell B.Sc. (Hons), who is a member of the
Australian Institute of Geoscientists. Mr Russell is a full-time employee of the company and has sufficient
experience which is relevant to the styles of mineralisation and types of deposit under consideration and
to the activities which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of
the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr
Russell consents to the inclusion in this report of the matters based on his information in the form and
context in which it appears. Mr Russell is eligible to participate in short- and long-term incentive plans of
the company.
Ore Reserves
The information in this report that relates to Ore Reserve is based on information compiled by Mr. Leigh
Devlin B.Eng. FAusIMM. Mr. Devlin has sufficient experience which is relevant to the styles of
mineralisation and types of deposit under consideration and to the activities which they are undertaking
to qualify as a Competent Person as defined in the 2012 Editions of the “Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves (JORC 2012)”. Mr. Devlin consents to the
inclusion in this report of the matters based on his information in the form and context in which it appears.
Mr. Devlin is a full-time senior executive of the Company and is eligible to and may participate in shortterm and long-term incentive plans of the Company as disclosed in its annual reports and disclosure
documents.
Forward looking statements
These materials prepared by Westgold Resources Limited include forward looking statements. Often, but
not always, forward looking statements can generally be identified by the use of forward looking words
such as “may”, “will”, “expect”, “intend”, “believe”, “forecast”, “predict”, “plan”, “estimate”,
“anticipate”, “continue”, and “guidance”, or other similar words and may include, without limitation,
statements regarding plans, strategies and objectives of management, anticipated production or
construction commencement dates and expected costs or production outputs.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors
that may cause the Company’s actual results, performance and achievements to differ materially from
any future results, performance or achievements. Relevant factors may include, but are not limited to,
changes in commodity prices, foreign exchange fluctuations and general economic conditions, increased
costs and demand for production inputs, the speculative nature of exploration and project development,
including the risks of obtaining necessary licenses and permits and diminishing quantities or grades of
reserves, political and social risks, changes to the regulatory framework within which the Company
operates or may in the future operate, environmental conditions including extreme weather conditions,
recruitment and retention of personnel, industrial relations issues and litigation.
Forward looking statements are based on the Company and its management’s good faith assumptions
relating to the financial, market, regulatory and other relevant environments that will exist and affect the
Company’s business and operations in the future. The Company does not give any assurance that the
assumptions on which forward looking statements are based will prove to be correct, or that the
Company’s business or operations will not be affected in any material manner by these or other factors
not foreseen or foreseeable by the Company or management or beyond the Company’s control.
Mineral Resource Grows by 91% at Starlight
13 November 2024
10
Although the Company attempts and has attempted to identify factors that would cause actual actions,
events or results to differ materially from those disclosed in forward looking statements, there may be
other factors that could cause actual results, performance, achievements or events not to be as
anticipated, estimated or intended, and many events are beyond the reasonable control of the Company.
In addition, the Company’s actual results could differ materially from those anticipated in these forward
looking statements as a result of the factors outlined in the “Risk Factors” section of the Company’s
continuous disclosure filings available on SEDAR+ or the ASX, including, in the Company’s current annual
report, half year report or most recent management discussion and analysis.
Accordingly, readers are cautioned not to place undue reliance on forward looking statements. Forward
looking statements in these materials speak only at the date of issue. Subject to any continuing obligations
under applicable law or any relevant stock exchange listing rules, in providing this information the
Company does not undertake any obligation to publicly update or revise any of the forward-looking
statements or to advise of any change in events, conditions or circumstances.
Reasonable Basis for Forward-Looking Statements
This ASX release has been prepared in compliance with the JORC Code (2012) and the ASX Listing Rules.
All material assumptions on which the Scoping Study production target and projected financial
information are based have been included in this release.
Consideration of Modifying Factors in the format specified by JORC Code (2012) is provided in Section 4.
Mineral Resource Grows by 91% at Starlight
13 November 2024
11
Appendix A – JORC 2012 Table 1– Gold Division
SECTION 1: SAMPLING TECHNIQUES AND DATA
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling techniques
JORC Code Explanation
Commentary
•
•
Diamond Drilling
A significant portion of the data used in resource calculations has been gathered from diamond
core. Multiple sizes have been used historically. This core is geologically logged and subsequently
halved for sampling. Grade control holes may be whole-cored to streamline the core handling
process if required.
•
•
•
•
•
Drilling techniques
•
•
Nature and quality of sampling (e.g. cut channels, random chips, or
specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc.). These
examples should not be taken as limiting the broad meaning of
sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any measurement
tools or systems used.
Aspects of the determination of mineralisation that are Material to
the Public Report.
In cases where ‘industry standard’ work has been done this would
be relatively simple (e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to produce a 30
g charge for fire assay’). In other cases more explanation may be
required, such as where there is coarse gold that has inherent
sampling problems. Unusual commodities or mineralisation types
(e.g. submarine nodules) may warrant disclosure of detailed
information.
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary
air blast, auger, Bangka, sonic, etc.) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by what method, etc.).
Method of recording and assessing core and chip sample recoveries
and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
Drill sample recovery
•
Face Sampling
At each of the major past and current underground producers, each development face / round is
horizontally chip sampled. The sampling intervals are domained by geological constraints (e.g. rock
type, veining and alteration / sulphidation etc.). The majority of exposures within the orebody are
sampled.
•
Sludge Drilling
Sludge drilling at is performed with an underground production drill rig. It is an open hole drilling
method using water as the flushing medium, with a 64mm (nominal) hole diameter. Sample
intervals are ostensibly the length of the drill steel. Holes are drilled at sufficient angles to allow
flushing of the hole with water following each interval to prevent contamination. Sludge drilling is
not used to inform resource models.
•
RC Drilling
Drill cuttings are extracted from the RC return via cyclone. The underflow from each interval is
transferred via bucket to a four-tiered riffle splitter, delivering approximately three kilograms of the
recovered material into calico bags for analysis. The residual material is retained on the ground near
the hole. Composite samples are obtained from the residue material for initial analysis, with the
split samples remaining with the individual residual piles until required for re-split analysis or
eventual disposal.
•
RAB / Aircore Drilling
Combined scoops from bucket dumps from cyclone for composite. Split samples taken from
individual bucket dumps via scoop. RAB holes are not included in the resource estimate.
•
Blast Hole Drilling
Cuttings sampled via splitter tray per individual drill rod. Blast holes not included in the resource
estimate.
All geology input is logged and validated by the relevant area geologists, incorporated into this is
assessment of sample recovery. No defined relationship exists between sample recovery and
grade. Nor has sample bias due to preferential loss or gain of fine or coarse material been noted.
Mineral Resource Grows by 91% at Starlight
13 November 2024
12
Criteria
Logging
JORC Code Explanation
Commentary
•
•
•
•
Sub-sampling techniques
and sample preparation
•
•
•
•
•
•
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc.) photography.
The total length and percentage of the relevant intersections logged
If core, whether cut or sawn and whether quarter, half or all core
taken.
If non-core, whether riffled, tube sampled, rotary split, etc. and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the
in-situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Quality of assay data and
laboratory tests
•
•
•
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments,
etc., the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision have
been established.
Mineral Resource Grows by 91% at Starlight
13 November 2024
•
•
•
Westgold surface drill-holes are all orientated and have been logged in detail for geology,
veining, alteration, mineralisation and orientated structure. Westgold underground drillholes are logged in detail for geology, veining, alteration, mineralisation and structure. Core
has been logged in enough detail to allow for the relevant mineral resource estimation
techniques to be employed.
Surface core is photographed both wet and dry and underground core is photographed wet.
All photos are stored on the Company’s servers, with the photographs from each hole
contained within separate folders.
Development faces are mapped geologically.
RC, RAB and Aircore chips are geologically logged.
Sludge drilling is logged for lithology, mineralisation and vein percentage.
Logging is both qualitative and quantitative in nature.
All holes are logged completely, all faces are mapped completely.
Blast holes -Sampled via splitter tray per individual drill rods.
RAB / AC chips - Combined scoops from bucket dumps from cyclone for composite. Split
samples taken from individual bucket dumps via scoop.
RC - Three tier riffle splitter (approximately 5kg sample). Samples generally dry.
Face Chips - Nominally chipped horizontally across the face from left to right, sub-set via
geological features as appropriate.
Diamond Drilling - Half-core niche samples, sub-set via geological features as appropriate.
Grade control holes may be whole-cored to streamline the core handling process if required.
Chips / core chips undergo total preparation.
Samples undergo fine pulverisation of the entire sample by an LM5 type mill to achieve a 75µ