BIG BELL EXPANSION APPROVED
16-year mine life delivers 1.5Moz at a grade of ≈3g/t Au
Westgold Resources Limited (ASX: WGX – Westgold or the Company) is pleased to announce that the Board
has approved the expansion of the Big Bell Project at Cue, Western Australia. The expansion of the Big Bell mine
will incorporate a new Long Hole Open Stoping (LHOS) operation below the existing sub level cave.
Highlights
The Base Case for the expanded Big Bell envisages:
15.7Mt of ore production for 1.5Moz of gold.
Mine grades lifting from ≈2.5g/t to ≈3g/t Au.
Mine life now 16 years - with LHOS development commencing immediately:
o
93koz pa Au annualised production @ All-In Cost (AIC) ≈$2,388/oz.
o
first ore from the LHOS operation in H1, FY25.
peak production rate of 134koz pa Au in FY30.
As per capital guidance - $24M forecast for FY24.
The Base Case study provides compelling financial metrics with significant upside at current spot prices:
Financial metrics
Unit
Base Case
Spot Price
Gold price assumption
$/oz
2,900
3,080
Net life of mine (LOM) cash generation
$M
675
906
Avg. free cash flow generation per ounce
$/oz
512
690
Net Present Value (NPV8%)
$M
313
447
Payback
years
5
Cashflow positive
in Year 1
Westgold Managing Director Wayne Bramwell commented:
“Big Bell has a long and profitable life ahead of it now. This expansion underwrites the future of our
Murchison operations and provides Westgold with further optionality to leverage our existing
processing capital.
The economics of making our biggest mine bigger is compelling. Big Bell will provide baseload feed for
our Tuckabianna and Bluebird processing hubs across its planned 16-year mine life and its ore will be
supplemented with high-grade, high margin ores from the Bluebird mine at Meekatharra, and the
recently announced Great Fingall mine near Cue.
There are very few mines in the Australian gold sector that can boast a 16-year mine life. Big Bell has
delivered nearly three million ounces of gold production to date and with this expansion now approved,
the mine is set to ring true to its name.”
Westgold Resources Limited (ASX: WGX)
ACN 009 260 306
Level 6, 200 St Georges Terrace, Perth WA 6000
+61 8 9462 3400
perth.reception@westgold.com.au
www.westgold.com.au
ASX: WGX
Big Bell Overview
The Big Bell mine has produced ≈3.0Moz of gold at greater than 4,000oz per vertical metre.
Big Bell is located 25km west of Cue and 50km from Westgold’s Tuckabianna processing hub (see Figure 1).
Mining at Big Bell commenced in the early 1920’s as an underground mine. The current open pit void was
excavated between April 1989 and 1993 with a portal cut in late 1993 by previous operators to provide
underground access. The modern underground mine commenced in 1994 and was closed in June 2003, with the
SLC operations re-started by Westgold in mid-2016.
Westgold achieved steady state productivity rates from the SLC in the March 2022 quarter, with the Big Bell
operations team repeatedly delivering quarterly production records throughout FY22 and FY23.
Figure 1 – Westgold’s Extensive Murchison Assets Extending from Cue to Meekatharra
28 NOVEMBER 2023
BIG BELL EXPANSION APPROVED
2
ASX: WGX
The Big Bell mine cornerstones Westgold’s Murchison operations, providing the bulk of the ore tonnage which
feeds the Tuckabianna mill, with surplus feed being processed at the Bluebird mill. This “base load” feed enables
total mill utilisation across the Murchison region and allows for cost efficient processing of higher-grade ores
such as that from Blue Bird, Paddy’s Flat and Great Fingall.
The Big Bell LHOS (see Figure 2) will extend this base load feed to an initial 16 years by accessing the deeper
extensions of the Big Bell orebody, without impeding productivity from the current SLC operation. Development
of the deeper extensions will utilise the existing mining fleet and mine infrastructure, opening up a second
production front and increasing the overall mined grade through more selective mining.
To establish this second production front, a LHOS operation with paste fill methodology will be employed below
the current SLC footprint. This methodology will ensure greater grade selectivity is available to Westgold and
optimises the management of the stress regime in the mine.
Figure 2 – Schematic of Big Bell Expansion Development plan
28 NOVEMBER 2023
BIG BELL EXPANSION APPROVED
3
ASX: WGX
Westgold’s base business case for the Big Bell Expansion Project generates compelling economics, with outputs
considerably enhanced at current spot gold pricing. The base business case proposes a project which:
•
produces first ore from the LHOS in H1 FY25 following immediate commencement of development;
•
builds a mine that averages gold production of 93kozpa over a 16-year mine life - at an AIC of $2,388/oz,
with a peak production rate of 134kozpa in FY30;
•
enhances overall mined grade of Big Bell – lifting from ≈2.5g/t Au from the SLC to an overall ≈3g/t Au
through improved mine selectivity in the LHOS;
•
generates approximately $512/oz of free cashflow at a gold price of $2,900/oz - rising to approximately
$690/oz of free cashflow at current spot prices; and
•
is highly value accretive - with an NPV of $313M or $447M 1 at the current spot price.
Figure 3 – Big Bell Life of Mine Yearly Cashflow (Base Case @ gold price of $2,900/oz) 2
The business case requires modest progressive capital expenditure which is fully funded by Westgold’s
operational cash flow (see Figure 3). As forecast in the FY24 guidance, $24M of capital expenditure is expected
to be spent in FY24, predominantly allocated towards the paste fill system and associated infrastructure.
It should be noted that Westgold operations staff have extensive paste fill experience, but to mitigate any
potential startup risk with its implementation at Big Bell, a build own operate commercial arrangement is being
considered.
1 Assumes spot gold price of $3,080/oz.
28 NOVEMBER 2023
BIG BELL EXPANSION APPROVED
4
ASX: WGX
Beyond FY24, capital is allocated mainly towards mine development which is at its highest intensity in the mine
start-up of FY25. The project’s capital expenditure is substantially offset by operating cash flow from the
continuing Big Bell sub-level cave with a peak negative cumulative cash flow of $27M (or $10M at spot gold
prices).
At spot prices, the project is cash flow positive within the first year.
Table 1 – Big Bell Base Case Study Metrics
Metrics
Unit
Base Case Feasibility Study Results
Mine production
Mt
15.8
Grade mined
g/t Au
3
Metallurgical recovery
% gold
88
Gold production
‘000 oz
1,320
Mine life
years
16
Gold price assumption
$/oz
2,900
3,080
Revenue
$M
3,826
4,064
Life of Mine Capital expenditure
$M
373
373
Operating expenditure
$M
2,683
2,683
Government royalties
$M
96
101
Total expenditure
$M
3,151
3,157
Net cashflow
$M
675
907
NPV8%
$M
313
447
Payback
years
5
Cashflow positive in
Year 1
Peak cash drawdown
$M
27
10
All-in cost (AIC)
$/oz
2,388
2,393
Note: All data is pre-tax real (2023 A$).
Drilling to confirm production upside opportunity
Drilling conducted in FY23 was used to update the Mineral Resource and Ore Reserve for the Big Bell Mine,
adding tonnes and ounces to the mine, whilst improving Ore Reserve grade (see Table 2). This drilling expanded
the Big Bell Mine’s Mineral Resource by ≈55% and Ore Reserve by ≈25%.
Table 2 – Big Bell Mine Mineral Resource and Ore Reserve Growth in FY23
Big Bell Mineral
Resource
2022
2023
Project
Tonnes
('000s)
Grade
Ounces Au
('000s)
Tonnes
('000s)
Grade
Big Bell Mine
13,116
3.09
1,305
20,762
3.04
Big Bell Ore Reserve
2022
2023
Project
Tonnes
('000s)
Grade
Ounces Au
('000s)
Tonnes
('000s)
Grade
Big Bell Mine
7,733
3.07
763
9,450
3.16
28 NOVEMBER 2023
BIG BELL EXPANSION APPROVED
Change
Ounces
Au
('000s)
2,027
Ounces
Au
('000s)
960
Tonnes
('000s)
Grade
Ounces Au
('000s)
7,647
2.94
722
Change
Tonnes
('000s)
Grade
Ounces Au
('000s)
1,717
3.56
197
5
ASX: WGX
Westgold has identified further potential for Mineral Resource expansion on the northern side of the SLC. The
Company has three drill rigs active at Big Bell and expects to have results from the initial drill testing of this zone
available in the coming months.
Capital development is already in place and subject to drilling results supporting the economics, the region has
the potential to add near term production upside for Big Bell which is not included in the current study.
In addition, Westgold expects to commence resource extension drilling from underground towards the south
side of the LHOS operation once mine development has sufficiently advanced. The Big Bell Mineral Resource
remains open to the South, North and at depth.
Looking Forward
The Big Bell Expansion Project has been approved for immediate commencement.
Equipment, manning and the internal management team are already in place and operating the existing cave at
Big Bell. The Big Bell expansion will see the existing team’s operational roles expand and, with an experienced
team in place, is not anticipated to cause disruption. As identified above, a third-party provider is being
considered to build, own and operate the proposed paste fill infrastructure during the initial years of the LHOS
operation and further optimisation works are in hand to allow the long-hole operation to proceed as planned.
ENDS
THIS ANNOUNCEMENT IS AUTHORISED FOR RELEASE TO THE ASX BY THE BOARD.
MEDIA AND INVESTOR RELATIONS ENQUIRIES
INVESTOR RELATIONS
Kasun Liyanaarachchi| Investor Relations Manager
Investor.Relations@westgold.com.au
+61 458 564 483
28 NOVEMBER 2023
BIG BELL EXPANSION APPROVED
MEDIA
Peter Knight | Communications Advisor
Peter.Knight@westgold.com.au
+61 459 980 481
6
ASX: WGX
COMPETENT PERSON STATEMENTS
EXPLORATION RESULTS AND MINERAL RESOURCES ESTIMATES
The information in this report that relates to Exploration results and Mineral Resource Estimates is compiled by Westgold
technical employees and contractors under the supervision of Mr. Jake Russell B.Sc. (Hons), who is a member of the Australian
Institute of Geoscientists. Mr Russell is a full-time employee of the company and has sufficient experience which is relevant
to the styles of mineralisation and types of deposit under consideration and to the activities which he is undertaking to qualify
as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves. Mr Russell consents to the inclusion in this report of the matters based on his information in the
form and context in which it appears. Mr Russell is eligible to participate in short- and long-term incentive plans of the
company.
ORE RESERVES
The information in this report that relates to Ore Reserve is based on information compiled by Mr. Leigh Devlin B.Eng.
MAusIMM. Mr. Devlin has sufficient experience which is relevant to the styles of mineralisation and types of deposit under
consideration and to the activities which they are undertaking to qualify as a Competent Person as defined in the 2012 Editions
of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC 2012)”. Mr. Devlin
consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.
Mr. Devlin is a full-time senior executive of the Company and is eligible to and may participate in short-term and long-term
incentive plans of the Company as disclosed in its annual reports and disclosure documents.
FORWARD LOOKING STATEMENTS
Certain statements in this report relate to the future, including forward looking statements relating to Westgold’s financial
position and strategy. These forward-looking statements involve known and unknown risks, uncertainties, assumptions and
other important factors that could cause the actual results, performance or achievements of Westgold to be materially
different from future results, performance or achievements expressed or implied by such statements. Actual events or results
may differ materially from the events or results expressed or implied in any forward-looking statement and deviations are
both normal and to be expected. Other than required by law, neither Westgold, their officers nor any other person gives any
representation, assurance or guarantee that the occurrence of the events expressed or implied in any forward-looking
statements will actually occur. You are cautioned not to place undue reliance on those statements.
28 NOVEMBER 2023
BIG BELL EXPANSION APPROVED
7
ASX: WGX
APPENDIX A – RECENT DRILL RESULTS
Lode
Hole
Collar N
Collar E
Collar RL
Intercept (Downhole)
From
(m)
Dip
Azi
Big Bell
23BBDD0053C
6,977,667
564,657
-214
14.75m at 3.88g/t Au
575
-63
125
23BBDD0055A
6,977,662
564,659
-240
12.28m at 2.64g/t Au
676
-63
141
18.89m at 2.49g/t Au
691
4m at 2.00g/t Au
423
-55
160
29m at 2.22g/t Au
493
23BBDD0057A
28 NOVEMBER 2023
BIG BELL EXPANSION APPROVED
6,977,662
564,659
-240
8
ASX: WGX
APPENDIX B – JORC2012 TABLE1 – GOLD DIVISION
SECTION 1: SAMPLING TECHNIQUES AND DATA
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code Explanation
Commentary
Sampling techniques
•
Diamond Drilling
•
A significant portion of the data used in resource calculations has been gathered from diamond
core. Multiple sizes have been used historically. This core is geologically logged and
subsequently halved for sampling. Grade control holes may be whole-cored to streamline the
core handling process if required.
Face Sampling
•
At each of the major past and current underground producers, each development face / round
is horizontally chip sampled. The sampling intervals are domained by geological constraints
(e.g. rock type, veining and alteration / sulphidation etc.). The majority of exposures within the
orebody are sampled.
Sludge Drilling
Sludge drilling at is performed with an underground production drill rig. It is an open hole
•
drilling method using water as the flushing medium, with a 64mm (nominal) hole diameter.
Sample intervals are ostensibly the length of the drill steel. Holes are drilled at sufficient angles
to allow flushing of the hole with water following each interval to prevent contamination.
Sludge drilling is not used to inform resource models.
RC Drilling
•
Drill cuttings are extracted from the RC return via cyclone. The underflow from each interval is
transferred via bucket to a four-tiered riffle splitter, delivering approximately three kilograms of
the recovered material into calico bags for analysis. The residual material is retained on the
ground near the hole. Composite samples are obtained from the residue material for initial
analysis, with the split samples remaining with the individual residual piles until required for resplit analysis or eventual disposal.
RAB / Aircore Drilling
•
Combined scoops from bucket dumps from cyclone for composite. Split samples taken from
individual bucket dumps via scoop. RAB holes are not included in the resource estimate.
Blast Hole Drilling
Cuttings sampled via splitter tray per individual drill rod. Blast holes not included in the
•
resource estimate.
•
All geology input is logged and validated by the relevant area geologists, incorporated into this
is assessment of sample recovery. No defined relationship exists between sample recovery and
grade. Nor has sample bias due to preferential loss or gain of fine or coarse material been noted.
•
•
•
Drilling techniques
•
•
•
Drill sample recovery
•
Logging
•
•
•
28 NOVEMBER 2023
BIG BELL EXPANSION APPROVED
Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised industry
standard measurement tools appropriate to the minerals under investigation, such as down
hole gamma sondes, or handheld XRF instruments, etc.). These examples should not be taken
as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the Public Report.
In cases where ‘industry standard’ work has been done this would be relatively simple (e.g.
‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases more explanation may be required, such
as where there is coarse gold that has inherent sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information.
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter, triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is oriented and if so, by what method, etc.).
Method of recording and assessing core and chip sample recoveries and results assessed.
Measures taken to maximise sample recovery and ensure representative nature of the
samples.
Whether a relationship exists between sample recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of fine/coarse material.
Whether core and chip samples have been geologically and geotechnically logged to a level of •
detail to support appropriate Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc.)
photography.
•
The total length and percentage of the relevant intersections logged
Westgold surface drill-holes are all orientated and have been logged in detail for geology, veining,
alteration, mineralisation and orientated structure. Westgold underground drill-holes are
logged in detail for geology, veining, alteration, mineralisation and structure. Core has been
logged in enough detail to allow for the relevant mineral resource estimation techniques to be
employed.
Surface core is photographed both wet and dry and underground core is photographed wet.
9
ASX: WGX
Criteria
JORC Code Explanation
Commentary
All photos are stored on the Company’s servers, with the photographs from each hole
contained within separate folders.
•
Development faces are mapped geologically.
•
RC, RAB and Aircore chips are geologically logged.
•
Sludge drilling is logged for lithology, mineralisation and vein percentage.
•
Logging is quantitative in nature.
•
All holes are logged completely, all faces are mapped completely.
Sub-sampling techniques
and sample preparation
•
•
•
•
•
•
•
•
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc. and whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the sample preparation
technique.
Quality control procedures adopted for all sub-sampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is representative of the in-situ material collected,
including for instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material being sampled.
•
•
•
•
•
•
•
•
Quality of assay data and
laboratory tests
•
•
•
28 NOVEMBER 2023
BIG BELL EXPANSION APPROVED
The nature, quality and appropriateness of the assaying and laboratory procedures used and •
whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc., the parameters used in
determining the analysis including instrument make and model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision •
have been established.
•
•
Blast holes -Sampled via splitter tray per individual drill rods.
RAB / AC chips - Combined scoops from bucket dumps from cyclone for composite. Split
samples taken from individual bucket dumps via scoop.
RC - Three tier riffle splitter (approximately 5kg sample). Samples generally dry.
Face Chips - Nominally chipped horizontally across the face from left to right, sub-set via
geological features as appropriate.
Diamond Drilling - Half-core niche samples, sub-set via geological features as appropriate.
Grade control holes may be whole-cored to streamline the core handling process if required.
Chips / core chips undergo total preparation.
Samples undergo fine pulverisation of the entire sample by an LM5 type mill to achieve a 75µ
product prior to splitting.
QA/QC is currently ensured during the sub-sampling stages process via the use of the systems
of an independent NATA / ISO accredited laboratory contractor. A significant portion of the
historical informing data has been processed by in-house laboratories.
The sample size is considered appropriate for the grain size of the material being sampled.
The un-sampled half of diamond core is retained for check sampling if required. For RC chips
regular field duplicates are collected and analysed for significant variance to primary results.
Recent drilling was analysed by fire assay as outlined below;
♦ A 40g sample undergoes fire assay lead collection followed by flame atomic adsorption
spectrometry.
♦ The laboratory includes a minimum of 1 project standard with every 22 samples
analysed.
♦ Quality control is ensured via the use of standards, blanks and duplicates.
No significant QA/QC issues have arisen in recent drilling results.
Historical drilling has used a combination of Fire Assay, Aqua Regia and PAL analysis.
These assay methodologies are appropriate for the resources in question.
10
ASX: WGX
Criteria
JORC Code Explanation
Verification of sampling and
assaying
•
•
•
•
Location of data points
Commentary
The verification of significant intersections by either independent or alternative company •
personnel.
•
The use of twinned holes.
Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.
•
Discuss any adjustment to assay data.
•
•
•
•
•
Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), •
trenches, mine workings and other locations used in Mineral Resource estimation.
Specification of the grid system used.
•
Quality and adequacy of topographic control.
•
Data spacing and
distribution
•
•
Orientation of data in
relation to geological
structure
•
Sample security
All data is spatially oriented by survey controls via direct pickups by the survey department.
Drillholes are all surveyed downhole, deeper holes with a Gyro tool if required, the majority
with single / multishot cameras.
All drilling and resource estimation is preferentially undertaken in local mine grid at the various
sites.
Topographic control is generated from a combination of remote sensing methods and groundbased surveys. This methodology is adequate for the resources in question.
Data spacing for reporting of Exploration Results.
•
Whether the data spacing and distribution is sufficient to establish the degree of geological
and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
•
Whether sample compositing has been applied.
Data spacing is variable dependent upon the individual orebody under consideration. A lengthy
history of mining has shown that this approach is appropriate for the Mineral Resource
estimation process and to allow for classification of the resources as they stand.
Compositing is carried out based upon the modal sample length of each individual domain.
•
Whether the orientation of sampling achieves unbiased sampling of possible structures and •
the extent to which this is known, considering the deposit type.
If the relationship between the drilling orientation and the orientation of key mineralised •
structures is considered to have introduced a sampling bias, this should be assessed and •
reported if material.
Drilling intersections are nominally designed to be normal to the orebody as far as
underground infrastructure constraints / topography allows.
Development sampling is nominally undertaken normal to the various orebodies.
Where drilling angles are sub optimal the number of samples per drill hole used in the
estimation has been limited to reduce any potential bias.
It is not considered that drilling orientation has introduced an appreciable sampling bias.
•
The measures taken to ensure sample security.
•
•
•
•
Audits or reviews
No independent or alternative verifications are available.
Virtual twinned holes have been drilled in several instances across all sites with no significant
issues highlighted. Drillhole data is also routinely confirmed by development assay data in the
operating environment.
Primary data is collected utilising LogChief. The information is imported into a SQL database
server and verified.
All data used in the calculation of resources and reserves are compiled in databases
(underground and open pit) which are overseen and validated by senior geologists.
No adjustments have been made to any assay data.
•
28 NOVEMBER 2023
BIG BELL EXPANSION APPROVED
The results of any audits or reviews of sampling techniques and data
•
For samples assayed at on-site laboratory facilities, samples are delivered to the facility by
Company staff. Upon delivery the responsibility for sample security and storage falls to the
independent third-party operators of these facilities.
For samples assayed off-site, samples are delivered to a third-party transport service, who in
turn relay them to the independent laboratory contractor. Samples are stored securely until
they leave site.
Site generated resources and reserves and the parent geological data is routinely reviewed by
the Westgold Corporate technical team.
11
ASX: WGX
SECTION 2: REPORTING OF EXPLORATION RESULTS
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code Explanation
Mineral tenement and land
tenure status
•
•
Commentary
Type, reference name/number, location and ownership including agreements or material •
issues with third parties such as joint ventures, partnerships, overriding royalties, native •
title interests, historical sites, wilderness or national park and environmental settings.
The security of the tenure held at the time of reporting along with any known impediments •
to obtaining a licence to operate in the area.
•
Native title interests are recorded against several WGX tenements.
The CMGP tenements are held by the Big Bell Gold Operations (BBGO) of which Westgold has
100% ownership.
Several third-party royalties exist across various tenements at CMGP, over and above the state
government royalty.
The Fortnum Gold Project tenure is 100% owned by Westgold through subsidiary company Aragon
Resources Pty. Ltd. Various Royalties apply to the package. The most pertinent being;
♦
•
•
•
•
$10/oz after first 50,000oz (capped at $2M)- Perilya
♦ State Government – 2.5% NSR
The tenure is currently in good standing.
There are no known issues regarding security of tenure.
There are no known impediments to continued operation.
WGX operates in accordance with all environmental conditions set down as conditions for grant of
the leases.
The CMGP tenements have an exploration and production history in excess of 100 years.
The FGP tenements have an exploration and production history in excess of 30 years.
Westgold work has generally confirmed the veracity of historic exploration data.
Exploration done by other
parties
•
Acknowledgment and appraisal of exploration by other parties
Geology
•
•
•
•
Deposit type, geological setting and style of mineralisation.
MGO
•
MGO is located in the Achaean Murchison Province, a granite-greenstone terrane in the northwest
of the Yilgarn Craton. Greenstone belts trending north-northeast are separated by granite-gneiss
domes, with smaller granite plutons also present within or on the margins of the belts.
•
The Paddy’s Flat area is located on the western limb of a regional fold, the Polelle Syn- cline, within
a sequence of mafic to ultramafic volcanics with minor interflow sediments and banded ironformation. The sequence has also been intruded by felsic porphyry dykes prior to mineralisation.
Mineralisation is located along four sub-parallel trends at Paddy’s Flat which can be summarized
as containing three dominant mineralisation styles:
♦
•
•
28 NOVEMBER 2023
BIG BELL EXPANSION APPROVED
Sulphide replacement BIF hosted gold. Quartz vein hosted shear-related gold.
♦ Quartz-carbonate-sulphide stockwork vein and alteration related gold.
The Yaloginda area is a gold-bearing Archaean greenstone belt situated ~15km south of
Meekatharra. The deposits in the area are hosted in a strained and metamorphosed volcanic
sequence that consists primarily of ultramafic and high-magnesium basalt with minor komatiite,
peridotite, gabbro, tholeiitic basalt and interflow sediments. The sequence was intruded by a
variety of felsic porphyry and intermediate sills and dykes.
The Reedy’s mining district is located approximately 15 km to the south-east to Meekatharra and
to the south of Lake Annean. The Reedy gold deposits occur with- in a north-south trending
greenstone belt, two to five kilometres wide, composed of volcano-sedimentary sequences and
separated multiphase syn- and post-tectonic granitoid complexes. Structurally controlled the gold
occur.
12
ASX: WGX
Criteria
Drill hole Information
JORC Code Explanation
•
•
28 NOVEMBER 2023