Starlight Exploration Update
Exceptional drilling results extend the Nightfall lode
Westgold Resources Limited (ASX: WGX / OTCQX: WGXRF – Westgold or the Company) is
pleased to provide this operational update from the Starlight underground mine at the
Company’s Bryah Operation.
Highlights
Results extending the Nightfall lodes include:
■
16.39m at 7.05g/t Au from 272m in NF1130RD11
■
9.65m at 10.37g/t Au from 145.35m in NF1125RD12
Impressive in fill result from Nightfall lodes include:
■
3.5m at 64.53g/t Au from 111.5m in NF1125RD03.
Production from Nightfall lode to accelerate – the Starlight 890 link
development drive is underway, allowing concurrent bottom-up and top-down
mining of Nightfall.
Inhouse underground drilling capability expands – Westgold to purchase six
additional underground drill rigs for delivery prior to the end of FY24, taking its
wholly owned fleet size to 13 and vastly improving future drilling rates and
efficiencies.
Westgold Managing Director and CEO Wayne Bramwell commented:
“Westgold’s investment in drilling across our mines continues to bear fruit at Starlight. Our highgrade Nightfall lode continues to expand, with our Geology team expecting further Mineral
Resource growth over the coming quarters.
Key to our resource development success is Westgold’s drilling division. Our inhouse capability
continues to expand with the purchase of six state of the art underground drill rigs, taking our drill
fleet to 13 and reducing our need for contractor support across the Group.
This is an incredible time to be an unhedged, Australian gold producer. With a clear focus on
enhancing mine life and shareholder value we continue to invest drill metres at Starlight, are
advancing a significant surface and underground resource definition drilling campaign at
Bluebird - South Junction and are concurrently testing an early production opportunity at Great
Fingall.”
Westgold Resources Limited
ABN 60 009 260 306
ASX: WGX / OTC: WGXRF
westgold.com.au
T: +61 8 9462 3400
E: perth.reception@westgold.com.au
Level 6, 200 St Georges Terrace
Perth WA 6000
PO Box 7068, Cloisters Square WA 6850
Bryah Overview
Westgold’s Bryah Operation, located in the Bryah Basin of Western Australia, is approximately
140km north of Meekatharra and encompasses the 0.9Mtpa Fortnum processing plant, and
Fortnum, Horseshoe and Peak Hill mining areas [Figure 1]. The Starlight underground mine is the
predominant feed source [90% of all processed tonnes with the additional 10% of ore sourced
from surface stockpiles] to Westgold’s Fortnum processing hub.
Figure 1 – Westgold’s Bryah Operation.
Homestake Gold Mines (Homestake) developed the Fortnum mineral field during the 1980s, after
regional reconnaissance work discovered gold mineralisation in outcrop at Tom’s Hill. The Trev’s,
Dougie’s and Twilight gold deposits (all part of the Starlight Mineralisation Complex) were mined
as open pits by Homestake from 1989 to 1993.
In total ≈525,000 ounces of gold have been produced from Starlight at ≈3.1g/t Au to a total
depth of 260m by previous open pit and shallow underground operators (+2,000 ounces per
vertical metre) before mining ceased.
Between 1994 and 1998 Perilya Gold Mines subsequently mined the Trev’s – Starlight open pits,
then the Starlight-Twilight underground from 1999 to 2001.
Westgold has subsequently mined +266koz from the Starlight underground.
Starlight Exploration Update
14 March 2024
2
Latest Nightfall Drilling
The Nightfall lodes are the continuation of the Starlight lodes to the north, with a zone of complex
faulting marking the boundary between the two and previously limiting the northern extent of
Starlight development.
As with all Starlight lodes, Nightfall exhibits exceptional grade and a high level of grade variability.
As a result of these factors, attaining sufficient definition of these lodes for operational certainty
is an intensive exercise, requiring a significant commitment of drilling resources.
Figure 2 – Current Starlight Life of Mine plan and recent drilling
Results such as 16.39m at 7.05g/t Au from 272m in NF1130RD11, 9.65m at 10.37g/t Au from
145.35m in NF1125RD12 and 3.5m at 64.53g/t Au from 111.5m in NF1125RD03 at Nightfall
demonstrate the value that this intensive geological effort brings [Figure 2].
Westgold’s In-house Drilling Capability
Ongoing success across our portfolio has driven the decision by Westgold to significantly
upscale its internal drilling division via the addition of six highly productive Epiroc mobile
diamond drill rigs. These rigs will expand Westgold’s internal drilling division, bringing the total
number of wholly owned machines within the fleet to 13.
Starlight Exploration Update
14 March 2024
3
The growth in the fleet increases productivity and operational flexibility, lowers unit rates for
drilling and drives cost out of the business as we reduce third party supply of drill services.
Looking Forward
Since the Starlight operational re-set, the site has seen a return to profitability, consistent
outperformance against budget production outcomes, and continual expansion of the mine’s
Mineral Resource base and footprint.
Profitability at Starlight is expected to further improve with the decision to mine Nightfall via two
concurrent approaches, from bottom-up and top-down. Nightfall is currently being mined, topdown from the 1160 level. The Starlight 860 link (expected to be complete in Q4, FY24) will
connect the current deeper decline at Starlight to the lower extensions of Nightfall, thus allowing
the mining of Nightfall from the bottom-up in parallel and increase the Nightfall mining rate.
This announcement is authorised for release to the ASX by the Board.
Investor and media relations enquiries
Investor Relations
Kasun Liyanaarachchi | Investor Relations Manager
investor.relations@westgold.com.au
+61 458 564 483
Starlight Exploration Update
14 March 2024
Media
Peter Knight | Communications Manager
peter.knight@westgold.com.au
+61 459 980 481
4
Competent Person Statements
Exploration Results and Mineral Resource Estimates
The information in this report that relates to Exploration results and Mineral Resource Estimates is
compiled by Westgold technical employees and contractors under the supervision of Mr. Jake Russell
B.Sc. (Hons), who is a member of the Australian Institute of Geoscientists. Mr Russell is a full-time
employee of the company and has sufficient experience which is relevant to the styles of mineralisation
and types of deposit under consideration and to the activities which he is undertaking to qualify as a
Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves. Mr Russell consents to the inclusion in this report of the
matters based on his information in the form and context in which it appears. Mr Russell is eligible to
participate in short- and long-term incentive plans of the company.
Ore Reserves
The information in this report that relates to Ore Reserve is based on information compiled by Mr. Leigh
Devlin B.Eng. MAusIMM. Mr. Devlin has sufficient experience which is relevant to the styles of
mineralisation and types of deposit under consideration and to the activities which they are undertaking
to qualify as a Competent Person as defined in the 2012 Editions of the “Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves (JORC 2012)”. Mr. Devlin consents to the
inclusion in this report of the matters based on his information in the form and context in which it appears.
Mr. Devlin is a full-time senior executive of the Company and is eligible to and may participate in shortterm and long-term incentive plans of the Company as disclosed in its annual reports and disclosure
documents.
Forward looking statements
Certain statements in this report relate to the future, including forward looking statements relating to
Westgold’s financial position and strategy. These forward-looking statements involve known and unknown
risks, uncertainties, assumptions and other important factors that could cause the actual results,
performance or achievements of Westgold to be materially different from future results, performance or
achievements expressed or implied by such statements. Actual events or results may differ materially
from the events or results expressed or implied in any forward-looking statement and deviations are both
normal and to be expected. Other than required by law, neither Westgold, their officers nor any other person
gives any representation, assurance or guarantee that the occurrence of the events expressed or implied in
any forward-looking statements will actually occur. You are cautioned not to place undue reliance on those
statements.
Starlight Exploration Update
14 March 2024
5
APPENDIX A – Recent Drill Results
Lode
Hole
Nightfall
NF1125RD03
7,198,905
636,459
119
3.5m at 64.53g/t Au
NF1130RD11
7,198,879
636,383
140
16.39m at 7.05g/t Au
NF1125RD12
7,198,907
636,458
120
9.65m at 10.37g/t Au
Starlight Exploration Update
14 March 2024
Collar N Collar E Collar RL Intercept (Downhole) From (m)
Dip
Azi
111.5
-27.8
60.7
272
-8.4
44.3
145.35
-34.9
34.7
6
APPENDIX B – JORC 2012 TABLE 1 – GOLD DIVISION
SECTION 1: SAMPLING TECHNIQUES AND DATA
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling techniques
JORC Code Explanation
•
•
•
•
Drilling techniques
•
Drill sample recovery
•
•
•
Logging
•
Starlight Exploration Update
14 March 2024
Nature and quality of sampling (e.g. cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma sondes,
or handheld XRF instruments, etc.). These examples should not be
taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required, such
as where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed information.
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc.) and details (e.g. core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc.).
Method of recording and assessing core and chip sample recoveries
and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain
of fine/coarse material.
Commentary
Diamond Drilling
•
A significant portion of the data used in resource calculations has been gathered from diamond
core. Multiple sizes have been used historically. This core is geologically logged and
subsequently halved for sampling. Grade control holes may be whole-cored to streamline the
core handling process if required.
Face Sampling
•
At each of the major past and current underground producers, each development face / round
is horizontally chip sampled. The sampling intervals are domained by geological constraints
(e.g. rock type, veining and alteration / sulphidation etc.). The majority of exposures within the
orebody are sampled.
Sludge Drilling
•
Sludge drilling at is performed with an underground production drill rig. It is an open hole drilling
method using water as the flushing medium, with a 64mm (nominal) hole diameter. Sample
intervals are ostensibly the length of the drill steel. Holes are drilled at sufficient angles to allow
flushing of the hole with water following each interval to prevent contamination. Sludge drilling
is not used to inform resource models.
RC Drilling
•
Drill cuttings are extracted from the RC return via cyclone. The underflow from each interval is
transferred via bucket to a four-tiered riffle splitter, delivering approximately three kilograms of
the recovered material into calico bags for analysis. The residual material is retained on the
ground near the hole. Composite samples are obtained from the residue material for initial
analysis, with the split samples remaining with the individual residual piles until required for resplit analysis or eventual disposal.
RAB / Aircore Drilling
•
Combined scoops from bucket dumps from cyclone for composite. Split samples taken from
individual bucket dumps via scoop. RAB holes are not included in the resource estimate.
Blast Hole Drilling
•
Cuttings sampled via splitter tray per individual drill rod. Blast holes not included in the
resource estimate.
•
All geology input is logged and validated by the relevant area geologists, incorporated into this
is assessment of sample recovery. No defined relationship exists between sample recovery and
grade. Nor has sample bias due to preferential loss or gain of fine or coarse material been noted.
Whether core and chip samples have been geologically and •
Westgold surface drill-holes are all orientated and have been logged in detail for geology, veining,
7
Criteria
JORC Code Explanation
•
•
Sub-sampling techniques
and sample preparation
•
•
•
•
•
•
Commentary
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core (or
•
costean, channel, etc.) photography.
The total length and percentage of the relevant intersections logged
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc. and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the insitu material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material
being sampled.
•
alteration, mineralisation and orientated structure. Westgold underground drill-holes are
logged in detail for geology, veining, alteration, mineralisation and structure. Core has been
logged in enough detail to allow for the relevant mineral resource estimation techniques to be
employed.
Surface core is photographed both wet and dry and underground core is photographed wet. All
photos are stored on the Company’s servers, with the photographs from each hole contained
within separate folders.
Development faces are mapped geologically.
•
•
•
RC, RAB and Aircore chips are geologically logged.
Sludge drilling is logged for lithology, mineralisation and vein percentage.
Logging is quantitative in nature.
•
All holes are logged completely, all faces are mapped completely.
•
•
Blast holes -Sampled via splitter tray per individual drill rods.
RAB / AC chips - Combined scoops from bucket dumps from cyclone for composite. Split
samples taken from individual bucket dumps via scoop.
RC - Three tier riffle splitter (approximately 5kg sample). Samples generally dry.
•
•
•
•
•
•
•
•
Quality of assay data
and laboratory tests
•
•
Starlight Exploration Update
14 March 2024
The nature, quality and appropriateness of the assaying and laboratory •
procedures used and whether the technique is considered partial or
total.
For geophysical tools, spectrometers, handheld XRF instruments,
etc., the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors
•
applied and their derivation, etc.
Face Chips - Nominally chipped horizontally across the face from left to right, sub-set via
geological features as appropriate.
Diamond Drilling - Half-core niche samples, sub-set via geological features as appropriate.
Grade control holes may be whole-cored to streamline the core handling process if required.
Chips / core chips undergo total preparation.
Samples undergo fine pulverisation of the entire sample by an LM5 type mill to achieve a 75µ
product prior to splitting.
QA/QC is currently ensured during the sub-sampling stages process via the use of the systems
of an independent NATA / ISO accredited laboratory contractor. A significant portion of the
historical informing data has been processed by in-house laboratories.
The sample size is considered appropriate for the grain size of the material being sampled.
The un-sampled half of diamond core is retained for check sampling if required. For RC chips
regular field duplicates are collected and analysed for significant variance to primary results.
Recent drilling was analysed by fire assay as outlined below;
¨
A 40g sample undergoes fire assay lead collection followed by flame atomic adsorption
spectrometry.
¨
The laboratory includes a minimum of 1 project standard with every 22 samples analysed.
¨
Quality control is ensured via the use of standards, blanks and duplicates.
No significant QA/QC issues have arisen in recent drilling results.
8
Criteria
Verification of sampling and
assaying
JORC Code Explanation
Commentary
•
Nature of quality control procedures adopted (e.g. standards, blanks, •
duplicates, external laboratory checks) and whether acceptable levels •
of accuracy (i.e. lack of bias) and precision have been established.
Historical drilling has used a combination of Fire Assay, Aqua Regia and PAL analysis.
These assay methodologies are appropriate for the resources in question.
•
The verification of significant intersections by either independent or •
alternative company personnel.
•
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
•
Discuss any adjustment to assay data.
•
No independent or alternative verifications are available.
•
•
•
•
Location of data points
•
•
•
Data spacing
and distribution
Sample security
Accuracy and quality of surveys used to locate drill holes (collar and •
down-hole surveys), trenches, mine workings and other locations used
in Mineral Resource estimation.
Specification of the grid system used.
•
Quality and adequacy of topographic control.
•
All data is spatially oriented by survey controls via direct pickups by the survey department.
Drillholes are all surveyed downhole, deeper holes with a Gyro tool if required, the majority with
single / multishot cameras.
All drilling and resource estimation is preferentially undertaken in local mine grid at the various
sites.
Topographic control is generated from a combination of remote sensing methods and groundbased surveys. This methodology is adequate for the resources in question.
•
Data spacing is variable dependent upon the individual orebody under consideration. A lengthy
history of mining has shown that this approach is appropriate for the Mineral Resource
estimation process and to allow for classification of the resources as they stand.
Compositing is carried out based upon the modal sample length of each individual domain.
•
Data spacing for reporting of Exploration Results.
•
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and •
classifications applied.
Whether sample compositing has been applied.
•
Orientation of data in
relation to geological
structure
•
•
Whether the orientation of sampling achieves unbiased sampling of •
possible structures and the extent to which this is known, considering
the deposit type.
•
If the relationship between the drilling orientation and the orientation •
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
•
Drilling intersections are nominally designed to be normal to the orebody as far as underground
infrastructure constraints / topography allows.
Development sampling is nominally undertaken normal to the various orebodies.
Where drilling angles are sub optimal the number of samples per drill hole used in the
estimation has been limited to reduce any potential bias.
It is not considered that drilling orientation has introduced an appreciable sampling bias.
•
The measures taken to ensure sample security.
•
For samples assayed at on-site laboratory facilities, samples are delivered to the facility by
Company staff. Upon delivery the responsibility for sample security and storage falls to the
independent third-party operators of these facilities.
For samples assayed off-site, samples are delivered to a third-party transport service, who in
turn relay them to the independent laboratory contractor. Samples are stored securely until
they leave site.
•
Audits or reviews
Virtual twinned holes have been drilled in several instances across all sites with no significant
issues highlighted. Drillhole data is also routinely confirmed by development assay data in the
operating environment.
Primary data is collected utilising LogChief. The information is imported into a SQL database
server and verified.
All data used in the calculation of resources and reserves are compiled in databases
(underground and open pit) which are overseen and validated by senior geologists.
No adjustments have been made to any assay data.
•
Starlight Exploration Update
14 March 2024
The results of any audits or reviews of sampling techniques and data
•
Site generated resources and reserves and the parent geological data is routinely reviewed by
the Westgold Corporate technical team.
9
SECTION 2: REPORTING OF EXPLORATION RESULTS
(Criteria listed in the preceding section also apply to this section.)
Criteria
Mineral tenement and land
tenure status
JORC Code Explanation
•
•
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
Commentary
•
•
•
•
Native title interests are recorded against several WGX tenements.
The CMGP tenements are held by the Big Bell Gold Operations (BBGO) of which Westgold has
100% ownership.
Several third-party royalties exist across various tenements at CMGP, over and above the state
government royalty.
The Fortnum Gold Project tenure is 100% owned by Westgold through subsidiary company
Aragon Resources Pty. Ltd. Various Royalties apply to the package. The most pertinent being;
¨
•
•
•
Westgold work has generally confirmed the veracity of historic exploration data.
•
•
•
•
Exploration done by other
parties
•
Acknowledgment and appraisal of exploration by other parties
Geology
•
Deposit type, geological setting and style of mineralisation.
MGO
•
MGO is located in the Achaean Murchison Province, a granite-greenstone terrane in the
northwest of the Yilgarn Craton. Greenstone belts trending north-northeast are separated by
granite-gneiss domes, with smaller granite plutons also present within or on the margins of the
belts.
•
The Paddy’s Flat area is located on the western limb of a regional fold, the Polelle Syn- cline,
within a sequence of mafic to ultramafic volcanics with minor interflow sediments and banded
iron-formation. The sequence has also been intruded by felsic porphyry dykes prior to
mineralisation. Mineralisation is located along four sub-parallel trends at Paddy’s Flat which
can be summarized as containing three dominant mineralisation styles:
¨
•
Starlight Exploration Update
14 March 2024
$10/oz after first 50,000oz (capped at $2M)- Perilya
¨
State Government – 2.5% NSR
The tenure is currently in good standing.
There are no known issues regarding security of tenure.
There are no known impediments to continued operation.
WGX operates in accordance with all environmental conditions set down as conditions for grant
of the leases.
The CMGP tenements have an exploration and production history in excess of 100 years.
The FGP tenements have an exploration and production history in excess of 30 years.
Sulphide replacement BIF hosted gold. Quartz vein hosted shear-related gold.
¨
Quartz-carbonate-sulphide stockwork vein and alteration related gold.
The Yaloginda area is a gold-bearing Archaean greenstone belt situated ~15km south of
Meekatharra. The deposits in the area are hosted in a strained and metamorphosed volcanic
sequence that consists primarily of ultramafic and high-magnesium basalt with minor
10
Criteria
JORC Code Explanation
Commentary
•
komatiite, peridotite, gabbro, tholeiitic basalt and interflow sediments. The sequence was
intruded by a variety of felsic porphyry and intermediate sills and dykes.
The Reedy’s mining district is located approximately 15 km to the south-east to Meekatharra
and to the south of Lake Annean. The Reedy gold deposits occur with- in a north-south trending
greenstone belt, two to five kilometres wide, composed of volcano-sedimentary sequences
and separated multiphase syn- and post-tectonic granitoid complexes. Structurally controlled
the gold occur.
CGO
•
CGO is located in the Achaean Murchison Province, a granite-greenstone terrane in the
northwest of the Yilgarn Craton. Greenstone belts trending north-northeast are separated by
granite-gneiss domes, with smaller granite plutons also present within or on the margins of the
belts.
•
Mineralisation at Big Bell is hosted in the shear zone (Mine Sequence) and is associated with
the post-peak metamorphic retrograde assemblages. Stibnite, native antimony and trace
arsenopyrite are disseminated through the K-feldspar-rich lode schist. These are intergrown
with pyrite and pyrrhotite and chalcopyrite. Mineralisation outside the typical Big Bell host
rocks (KPSH), for example 1,600N and Shocker, also display a very strong W-As-Sb
geochemical halo.
•
Numerous gold deposits occur within the Cuddingwarra Project area, the majority of which are
hosted within the central mafic-ultramafic ± felsic porphyry sequence. Within this broad
framework, mineralisation is shown to be spatially controlled by competency contrasts across,
and flexures along, layer-parallel D2 shear zones, and is maximised when transected by
corridors of northeast striking D3 faults and fractures.
•
The Great Fingall Dolerite hosts the majority gold mineralisation within the portion of the
greenstone belt proximal to Cue (The Day Dawn Project Area). Unit AGF3 is the most brittle of
all the five units and this characteristic is responsible for its role as the most favourable
lithological host to gold mineralisation in the Greenstone Belt.
FGP
•
The Fortnum deposits are Paleoproterozoic shear-hosted gold deposits within the Fortnum
Wedge, a localised thrust duplex of Narracoota Formation within the overlying Ravelstone
Formation. Both stratigraphic formations comprise part of the Bryah Basin in the Capricorn
Orogen, Western Australia.
•
The Horseshoe Cassidy deposits are hosted within the Ravelstone Formation (siltstone and
argillite) and Narracoota Formation (highly-altered, moderate to strongly deformed mafic to
ultramafic rocks). The main zone of mineralisation is developed within a horizon of highly
altered magnesian basalt. Gold mineralisation is associated with strong vein stock works that
are confined to the altered mafic. Alteration consists of two types; stockwork proximal silicacarbonate-fuchsite-haematite-pyrite and distal silica-haematite-carbonate+/- chlorite.
•
The Peak Hill district represents remnants of a Proterozoic fold belt comprising highly deformed
trough and shelf sediments and mafic / ultramafic volcanics, which are generally moderately
metamorphosed (except for the Peak Hill Metamorphic Suite).
Starlight Exploration Update
14 March 2024
11
Criteria
Drill hole Information
JORC Code Explanation
•
•
Data aggregation methods
•
•
•
Relationship between
mineralisation widths and
intercept lengths
•
•
•
Diagrams
•
Balanced reporting
•
Other substantive
exploration data
•
Starlight Exploration Update
14 March 2024
Commentary
A summary of all information material to the understanding of the •
exploration results including a tabulation of the following information
for all Material drill holes:
¨
easting and northing of the drill hole collar
¨
elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
¨
dip and azimuth of the hole
¨
down hole length and interception depth
¨
hole length.
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
explain why this is the case.
In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high-grade
results and longer lengths of low grade results, the procedure used for
such aggregation should be stated and some typical examples of
such aggre
Share your feedback
Discover