September 2025 Quarterly Report
28 October 2025
ASX Release
Westgold is an unhedged Australian
ASX200 gold producer, committed to
unearthing enduring value for all its
stakeholders.
Westgold’s vision is to become
Australia’s leading gold company,
sustaining safe, responsible and
profitable production.
Our current business encompasses
mines and processing plants across
the Murchison and Southern
Goldfields, two of Western Australia’s
most prolific gold-producing regions.
Financial values are reported in A$ unless
otherwise specified
This announcement is authorised for
release to the ASX by the Board.
Investor Relations
KasunLiyanaarachchi
Group Manager IR & Communications
investor.relations@westgold.com.au
+61 458 564 483
$180M underlying cash build in Q1 FY26
Perth, Western Australia, 28 October 2025 Westgold
Resources Limited (ASX | TSX: WGX - Westgold or the
Company) is pleased to report results for the period
ending 30 September 2025 (Q1 FY26).
Q1 HIGHLIGHTS
OPERATIONS
Safety Performance Total Recordable Injury Frequency Rate
(TRIFR) of 5.04 / million hours – an improvement of 11%
Group production of 83,937oz Au @ AISC of $2,861/oz - in line
with FY26 guidance
3 YEAR OUTLOOK
High confidence organic growth plan that sees costs fall
FY26 guidance: 345-385koz @ AISC of $2,600-$2,900/oz
FY27 outlook: ~420koz @ AISC of $2,456/oz
FY28 outlook: ~470koz @ AISC of ~$2,499/oz
RESERVES & RESOURCES
Group Mineral Resource Estimate increased 24% to 16.3Moz
Ore Reserves up 5% to 3.5Moz - driven by additions at Beta Hunt,
Bluebird–South Junction and Starlight
Update reflects strong exploration success - and supports a 10-
year Reserve life
TREASURY
Gold sales of 94,913oz at an average price of A$5,296/oz -
generating revenue of A$503M
Underlying cash build of $180M - before investments in growth
($60M) and exploration ($12M)
$472M in closing cash, bullion, and liquid investments @ 30
September 2025 - a $108M increase Q on Q
Westgold remains 100% unhedged
CORPORATE
3cps final dividend declared for FY25 - and 5% on-market share
buyback program launched for FY26
Non-core divestments underway – including Peak Hill, Mt Henry-
Selene and Chalice gold opportunities
September 2025 Quarterly Report 2
Westgold Managing Director and CEO Wayne Bramwell commented:
“Westgold’s underlying cash build in Q1, FY26 of $180M before growth and exploration spend, culminated in a
closing balance of $472M in cash, bullion, and liquid investments. This was an increase of $108M quarter on
quarter.
Operationally, we maintained our focus on safety and efficiency, achieving an 11% improvement in our TRIFR
and delivering group gold production of 83,937 ounces at an AISC of $2,861 per ounce. This was a solid start to
FY26, and we remain on track to FY26 guidance of 345,000 to 385,000 ounces at an AISC of $2,600 to $2,900
per ounce.
The 2025 Reserves and Resources statement released during the quarter demonstrated the success of
continued investment in growth projects and exploration, with our Mineral Resource Estimate increasing by
24% to 16.3Moz and Ore Reserves up 5% to 3.5Moz. This growth now underpin a 10-year Ore Reserve life and
highlights the latent mineral potential that drilling can unlock from within our portfolio.
In Q1 the Company released its first three-year outlook (3YO) to the market. The 3YO is a high confidence plan
building from a FY26 production guidance mid-point of 365,000 ounces, growing organically to approximately
470,000 ounces of production by FY28. Importantly, the 3YO is conservative by design, sees our cost profile
fall andexcludesmultiple tangible opportunities currently being advancedtobring value forward in the outlook.
Westgold’s value proposition is to focus on organic growth to increase shareholder returns. This objective is
now underpinned by growing treasury strength, increasing Ore Reserves, four processing hubs and a pragmatic
approach to capital allocation that creates value. The declaration of a 3 cent per share final dividend for FY25
shows our commitment to shareholder returns with an upgrade to our dividend policy for FY26 and the launch
of a 5% on-market share buyback defining our approach.
Our team is focussed on optimising our larger producing assets in FY26 to maximise free cash flow. With
improving operational performance and a clear pathway defined by the 3YO, the business can now plan to
sustain safe, responsible, and profitable production into the future.”
September 2025 Quarterly Report 3
Executive Summary
Cash Position as of 30 September 2025
Westgold closed Q1, FY26 with cash, bullion and liquid investments of $472M – representing a build of $108M
in total cash, bullion and liquid investments.
Underlying cash build was $180M before growth and exploration spend (invested $60M on non-sustaining
capital and $12M on exploration, refer Figure 1).
This result was driven by consistent Group gold production and an increase in realised gold price to $5,296/oz.
Figure 1: Cash, Bullion, and Liquid Investments Movement (A$M) – Q1 FY26
Notes
▪ Westgold remains unhedged and fully exposed to the spot gold price.
▪ $2.3M in additional New Murchison Gold (ASX: NMG) shares purchased during Q1, FY26.
▪ $28M FY25 dividend payment to shareholders (3cps) declared during Q1, FY26 – payment made post
quarter end and will be reflected in the Q2 FY26 cashflows.
▪ $75M stamp duty invoice for the Karora transaction was received during Q1, FY26 - with payment due in
Q2 FY26.
▪ Closing Q1, FY26 investments include 1.7B NMG shares - but exclude 19.8M shares received in Blackcat
Syndicate Limited (ASX: BC8 - under escrow until 31/3/26).
erating on ustaining a e
loration
Wor ing a ital
September 2025 Quarterly Report 4
Group Production Highlights – Q1, FY26
Westgold is pleased to report Q1, FY26 Group gold production of 83,937oz (Q4 FY25: 88,022oz). The Murchison
produced 53,140oz (Q4 FY25: 54,811oz) and the Southern Goldfields produced 30,797oz (Q4 FY25: 33,211oz).
Q1, FY26 production was marginally lower than Q4, FY25 as expected due to scheduled process plant
shutdowns across the group. This is consistent with the e ectations set out in Westgold’s FY Guidance,
which shows group production output weighted towards the second half of FY26.
All-In Sustaining Cost (AISC) for Q1, FY26 was $240M (Q4 FY25: $237M), and on a per ounce basis was
$2,861/oz (Q4 FY25: $2,688/oz). The higher quarter-on-quarter costs were primarily due to the early
commencement of third-party ore delivery (from the gold price linked Ore Purchase Agreement (OPA) with New
Murchison Gold), planned maintenance costs and lower Group production. Excluding gold production from
ore purchased under the OPA, Group AISC was $2,792/oz.
Westgold maintains its production and cost guidance for FY26 of 345 – 385koz at $2,600 – $2,900/oz.
Figure 2: Westgold Quarterly Production (oz), Achieved Gold Price and AISC ($/oz)
The Company sold 94,913oz of gold for the quarter achieving a record price of $5,296/oz, generating $503M in
revenue. With Westgold hedge free, operations generated $205M of mine operating cashflows with the
achieved gold price $2,435/oz over AISC.
Total non-sustaining capital expenditure during Q1 FY26 of $60M (Q4 FY25: $39M) includes $39M of investment
in growth projects (Bluebird-South Junction and Great Fingall development) and $21M in plant and equipment
(processing facilities, ventilation, water, power and paste infrastructure across the Group).
Investment in exploration and resource development of $12M (Q4 FY25: $9M) for the quarter continued
focusing on Bluebird-South Junction and Starlight in the Murchison, and the Fletcher Zone at Beta Hunt in the
Southern Goldfields. Westgold remains on track to achieve the FY26 exploration guidance of $50M.
, , , ,
,
,
,
,
FY FY FY FY
, , ,
,
, , ,
,
FY FY FY FY
, , ,
,
outhern Gold Fields
urchison
September 2025 Quarterly Report 5
The net mine cash inflow for Q1 FY26 was $133M (refer Table 1 under Group Performance Metrics).
FY26 guidance and 3 year outlook
Westgold issued its FY26 guidance in August 2025, signalling an uplift over the prior year in group mine and
milling out uts. The om any’s outloo is su orted by ongoing investments in ey processing and mining
assets and more consistent operational performance, positioning Westgold for continued value creation.
For FY26, Westgold forecasts gold production in the range of 345,000oz to 385,000oz at an AISC of $2,600 to
$2,900 per ounce, reflecting a substantial production improvement over FY25. The om any’s guidance also
includes indicative AISC for purchased ore. Planned non-sustaining capital expenditure totals $270M,
predominantly directed toward major growth projects and infrastructure upgrades. The exploration and
resource definition budget is set at A$50M, representing a balanced investment in exploration, targeting
significant drilling activity across core regions.
Building on the FY26 guidance, Westgold released a detailed three-year outlook (3YO) on 1 October 2025 that
presents a high-confidence, e ecutable lan to increase the Grou ’s annual gold roduction to a ro imately
470,000oz per annum by FY28, while reducing AISC to around $2,500/oz from FY27 onwards. This organic
growth plan is predicated u on Westgold’s existing portfolio of operating assets, 2025 Ore Reserves (56Mt at
1.93g/t for 3.5Moz of gold), and the four processing hubs with a combined current processing capacity of
approximately 6Mtpa.
Importantly, the 3YO excludes tangible opportunities that, if realised represent substantial upside to the
plan. These opportunities are being actively advanced to bring value forward into the 3YO.
Figure 3: Growing production, reducing costs – with forecast capital and exploration investment
For more information, refer to “Westgold Provides 3-Year Outlook” lodged on the ASX on 1 October 2025.
, ,
, ,
,
,
,
,
,
roduction
o
A
o
FY FY Guidance id oint FY utloo FY utloo
urchison outhern Gold elds A o
FY FY Guidance id oint FY utloo FY utloo
on ustaining a e loration esource e nition
September 2025 Quarterly Report 6
Group Performance Metrics
Westgold’s quarterly physical and financial outputs for Q1 FY26 are summarised below.
Table 1: Westgold Q1 FY26 Performance
Physical Summary Units Murchison Southern
Goldfields
Group
ROM - Ore Mined t 687,951 537,380 1,225,331
Grade Mined g/t 2.3 2.1 2.2
Ore Processed t 906,5001
448,692 1,355,192
Head Grade g/t 2.01
2.3 2.1
Recovery % 911
94 92
Gold Produced oz 53,1401
30,797 83,937
Gold Sold oz 59,947 34,966 94,913
Achieved Gold Price A$/oz 5,296 5,296 5,296
Cost Summary Units Murchison Southern
Goldfields
Group
Mining A ’ 981
58 156
Processing A ’ 411
17 58
Admin A ’ 8 9 17
Stockpile Movements A ’ (1) (22)2
(23)
Royalties A ’ 7 13 20
Sustaining Capital A ’ 10 2 12
All-in Sustaining Costs A$M 163 77 240
All-in Sustaining Costs A$/oz 3,061 2,516 2,861
All-in Sustaining Costs – Excluding OPA ’ 150 77 227
All-in Sustaining Costs – Excluding OPA A$/oz 2,960 2,516 2,792
Notional Cashflow Summary Units Murchison Southern
Goldfields
Group
Notional Revenue (produced oz) A ’ 282 163 445
All-in Sustaining Costs A ’ 163 77 240
Mine Operating Cashflow ’ 119 86 205
Growth Capital A ’ (30) (9) (39)
Plant and Equipment A ’ (8) (13) (21)
Exploration Spend A ’ (7) (5) (12)
Net Mine Cashflow A$’ 74 59 133
Net Mine Cashflow A$/oz 1,392 1,915 1,583
1
Includes 24kt of ore purchased at 3.5g/t for 2,601oz
2.
Southern Goldfields stockpile movement is predominantly due to the combined impact of a 61kt stockpile build and the non-cash adjustment to
stockpile values following the finalisation of the purchase price allocation for the Karora transaction.
September 2025 Quarterly Report 7
Q4 FY25 Group Performance Overview
Westgold mined a total of 1,225kt at 2.2g/t Au (Q4 FY25: 1,264kt at 2.3g/t Au) slightly down quarter on quarter
as expected, driven by level access and paste establishment at Bluebird South Junction mine at Meekatharra.
Westgold processed 1,355 kt (Q4 FY25: 1,408kt) of ore in total at an average grade of 2.1g/t Au (Q4 FY25: 2.1g/t
Au), producing 83,937oz of gold (Q4 FY25: 88,022oz). Group AISC in Q1 FY26 was $240M, marginally higher
than the previous quarter (Q4 FY25: $237M).
MURCHISON
The Murchison hubs produced 53,140oz of gold (Q4 FY25: 54,811oz). Quarterly production declined slightly as
anticipated due to planned processing maintenance shutdowns at the three processing hubs and lower grades
mined at Fortnum.
The quarter-on-quarter reduction in ore mined was driven primarily by schedule constraints at Bluebird-South
Junction as the mine transitioned to paste fill. Encouragingly, the first paste pour was completed in Q1 ahead
of target, placing the Meekatharra Hub in a strong position to lift production as forecast over the year. The lower
quarter-on-quarter mining rate from Bluebird-South Junction was partly offset by the early delivery of ore under
the OPA with New Murchison Gold which contributed 2,601oz.
Total AISC of $163M (Q4 FY25: $138M) was higher than the prior quarter, mainly due to the commencement of
the gold price linked OPA and planned maintenance across the three processing hubs.
AISC per ounce of $3,061/oz (Q4 FY25: $2,503/oz) increased due to the higher total AISC and lower quarterly
production. Excluding the OPA, the Murchison AISC per ounce was $2,960/oz.
Total Non-Sustaining Capital Expenditure of $38M, includes Growth Capital ($30M) and Plant and Equipment
($8M) across the Murchison. Growth Capital mainly related to the continuation of Great Fingall development
and expansions to the Bluebird-South Junction underground mine.
SOUTHERN GOLDFIELDS
The Southern Goldfields hub produced 30,797oz of gold in Q1 FY26 (Q4 FY25: 33,211oz). Higginsville
throughput was in line with expectations. Production was lower quarter on quarter due to the timing of an
additional tolling parcel in Q4 FY25 at Lakewood. Beta Hunt mining output was in line with expectations and
steady quarter on quarter. Beta Hunt mining rates are expected to lift from late Q2, FY26 onwards as new
ventilation and pumping infrastructure removes constraints in the mine.
The total AISC in the Southern Operations decreased quarter on quarter (Q1 FY26 AISC: $77M vs Q4 FY25 AISC:
$99M). On a per ounce basis, AISC was lower at $2,516/oz in Q1 FY26 (Q4 FY25: $2,992/oz). This is
predominantly due to the combined impact of a 61kt stockpile build and the non-cash adjustment to stockpile
values of the Southern Goldfields following the finalisation of the purchase price allocation for the Karora
transaction.
Total Non-Sustaining Capital Expenditure of $22M, includes Growth Capital ($9M) and Plant and Equipment
($13M) across the Southern Goldfields Operations mainly relating to water management, primary ventilation
and underground infrastructure at the Beta Hunt mine.
September 2025 Quarterly Report 8
Table 2: Q1 FY26 Group Mining Physicals
Ore Mined
(‘000 t)
Mined Grade
(g/t)
Contained ounces
(Oz)
Murchison 688 2.3 50,837
Bluebird 144 3.2 14,615
Fender 58 2.3 4,214
Big Bell 269 1.7 14,975
Great Fingall 15 1.3 597
Starlight 202 2.5 16,436
Southern Goldfields 537 2.1 36,956
Beta Hunt 381 2.3 27,642
Two Boys 37 3.3 3,868
Lake Cowan OP 119 1.4 5,446
GROUP TOTAL 1,225 2.2 87,793
Table 3: Q1 FY26 Group Processing Physicals
Ore Milled
(‘000 t)
Head Grade
(g/t)
Recovery
(%)
Gold Production
(Oz)
Murchison 906 2.0 91 53,140
Bluebird 151 3.1 94 14,296
Fender 28 1.7 88 1,325
Ore Purchase 24 3.5 97 2,601
Open Pit & Low Grade 189 0.9 91 5,145
Meekatharra Hub 392 2.0 93 23,367
Big Bell 217 1.4 85 10,494
Fender 41 2.3 85 2,516
Great Fingall 33 1.4 86 1,271
Open Pit & Low Grade 0.2 0.9 86 5
Cue Hub 291 1.8 85 14,286
Starlight 197 2.5 94 14,853
Open Pit & Low Grade 26 0.8 94 634
Fortnum Hub 223 2.3 94 15,487
Southern Goldfields 449 2.3 94 30,797
Beta Hunt 365 2.3 94 25,269
Two Boys 32 3.6 92 3,344
Lake Cowan 45 1.4 93 1,836
Open Pit & Low Grade 7 1.6 92 348
GROUP TOTAL 1,355 2.1 92 83,937
September 2025 Quarterly Report 9
Operations
Safety
Safety performance improved across key indicator areas, with the Total Recordable Injury Frequency Rate
(TRIFR) reducing to 5.04 by the end of September. This marks a sustained, 11% improvement from the prior
quarter and reflects the effectiveness of targeted safety initiatives and operational discipline.
Our continued success in enhancing safety performance is achieved by prioritising leading indicators and
implementing proactive strategies to prevent incidents and injuries among our workforce.
Figure 4: The TRIFR decreased in Q1 FY26
. .
.
. . . . . . . . .
.
.
.
.
.
.
.
.
.
.
Total
ecordable
n
ury
count
onth
rolling
n
ury
Fre
uency
ate
in
uries
million
hours
wor
ed
FY
.
FY
.
FY FY FY FY FY FY FY FY FY FY
ecordable n uries onth T F onth T F
September 2025 Quarterly Report 10
The Murchison
Figure 5: W s ’s Murchison Assets
September 2025 Quarterly Report 11
▪ Fortnum Hub
In Q1 Fortnum processed 223kt at 2.3g/t with 94% recovery for 15,487oz (Q4 FY25: 231kt at 2.6g/t with
93% recovery for 18,149oz).
Fortnum continues to perform well, though production and grade was down quarter on quarter, following
a record quarter in Q4 FY25.
▪ Meekatharra Hub
In Q1 the Meekatharra Hub processed 392kt at 2.0g/t with 93% recovery for 23,367oz (Q4 FY25: 377kt at
1.7g/t with 94% recovery for 19,640oz).
Meekatharra production continues to improve on the back of higher grades from the Bluebird-South
Junction underground mine and the introduction of softer oxide feed from the Crown Prince open pit.
Westgold purchased 33kt of ore at 3.3g/t containing 3,231oz of gold as part of the OPA, and processed
24kt at 3.5g/t during the quarter for 2,601oz.
Bluebird-South Junction mined production amounted to 144kt at 3.2 g/t for 14,615oz (Q4 FY25: 170kt at
2.6 g/t for 14,027oz).
Two key milestones were achieved at Bluebird-South Junction with the paste fill plant commissioning,
and first paste pour was completed ahead of schedule, and level access design changes to the South
Junction area were finalised. The introduction of paste fill to the mine is a critical step for the larger more
productive South Junction stopes, allowing full orebody extraction. The updated mine design is a hybrid
approach which allows the productivity benefits of transverse mining whilst mitigating the ground control
issues that have previously delayed the project ramp up during FY25.
Mining volumes decreased as planned compared to the previous quarter due to a reduction in available
work areas as additional accesses were established and paste fill was incorporated into the schedule.
However, the impact of lower volumes was balanced by higher ore grades.
▪ Cue Hub
In Q1 the Cue Hub processed 291kt at 1.8g/t with 85% recovery for 14,286oz (Q4 FY25: 333kt at 1.8g/t
with 88% recovery for 17,022oz). Production at Cue was lower quarter on quarter primarily due to
planned processing plant maintenance, and slightly lower metallurgical recoveries.
The variation in recovery was primarily the result of increased production from a particular section of the
Big Bell upper cave, which has unique metallurgical characteristics. This is anticipated to be a temporary
occurrence and not indicative of the long-term recovery performance expected from the upper cave as a
whole.
Big Bell and Fender mined a combined 327kt at 1.8g/t for 19,189oz (Q4 FY25: 369kt at 1.9g/t for
21,967oz).
Mining at Big Bell was relatively steady quarter on quarter, with the slightly lower grades and volumes
being schedule driven. The rehabilitation of the upper cave continues and will drive improved mining
volumes from Q2 as the number of available mining areas approach steady state. With the Fender strike
length shortening at depth and forecast production reducing, the operation has been consolidated into
Big Bell in order to efficiently manage costs and equipment utilisation.
September 2025 Quarterly Report 12
Great Fingalldelivered 15kt at 1.3g/t for 597oz (Q4FY25:32kt at 1.4g/t for 1,498oz),from the Great Fingall
Flats target, completing this opportunistic early low grade mining campaign. Barminco Limited
(Barminco) mobilised to Great Fingall during the Quarter, successfully commencing the full-service
mining contract on 1 September.
First stoping in the main Great Fingall orebody will commence in late Q2 FY26 adding high grade feed to
the Cue Hub.
The Southern Goldfields
Figure 6: W s ’s Southern Goldfields Assets
September 2025 Quarterly Report 13
▪ Southern Goldfields
The 1.6Mtpa Higginsville processing plant processed 404kt at 2.3g/t with a 94% recovery for 28,043oz
(Q4 FY25: 382kt at 2.4g/t with 93% recovery for 27,698oz).
Beta Hunt achieved consistent mining rates quarter on quarter, mining 381kt at 2.3g/t for 27,642oz (Q4
FY25: 383kt at 2.3g/t for 28,533oz).
Key infrastructure milestones were achieved in Q1 for Beta Hunt with the newly installed primary
ventilation fans running, and the new rising main line installed. Production will see a ramp up in Q2 with
key primary infrastructure upgrades commissioned and operating at full design capacity.
The detailed Higginsville expansion study commenced in Q1, evaluating a production uplift to 2.6Mtpa,
with a further option to expand to 4Mtpa.
Toll milling of Beta Hunt ore at the Lakewood mill processed 45kt at 2.1g/t with 92% recovery for 2,754oz
(Q4 FY25: 85kt at 2.2g/t with 92% recovery for 5,513oz).
Exploration
During the quarter, Westgold invested $12M (Q4 FY25: $9M) in Exploration and Resource Definition and drilled
46,744m.
Greenfields exploration drilling was focused on targets in the Labouchere region near Fortnum, the Jubilee-
Golden Treasure and Murphy Creek targets at Peak Hill, and the Meekatharra North target north of Bluebird.
Extensional exploration / resource definition drilling was focussed on routine work on all active mines and
continued definition of Fletcher, inclusive of initial testing of the Stage 2 area.
Reserve and Resource update
During the September quarter, Westgold released its updated Mineral Resource and Ore Reserve Statement
as at 30 June 20252
. The Grou ’s total gold ineral esource stimate increased by 24% year-on-year to
231Mt at 2.2 g/t for 16.3Moz, following a focused exploration and resource definition program. Notably, the
maiden Stage 1 Mineral Resource Estimate for the Fletcher Zone at Beta Hunt delivered 2.3Moz, effectively
doubling the Beta Hunt Mineral Resource .
Significant growth was also achieved at Bluebird–South Junction (up 35% to 1.3Moz) and Starlight (up 46% to
866koz), with both assets reporting increases post-mining depletion. These results underscore the value of
Westgold’s ongoing investment in organic growth and the strong otential within its Western Australian
portfolio.
Ore Reserves grew by 5% to 56Mt at 1.9 g/t for 3.5Moz, marking the second consecutive year of post-depletion
Ore Reserve growth. This uplift was driven by substantial increases at Bluebird–South Junction (up 90% to
528koz) and Starlight (up 94% to 250koz), offsetting mining depletions at other operations.
With a current milling capacity of 5.7 Mtpa, Westgold’s estimated Ore Reserve life now stands at approximately
10 years. The company plans to invest $50M in exploration and resource development in FY26, maintaining its
focus on converting Mineral Resources to Ore Reserves and supporting long-term value creation for
shareholders.
2
efer to A X announcement titled “2025 Mineral Resource Estimate and Ore Reserves” – 3 September 2025
September 2025 Quarterly Report 14
Corporate
At the end of Q1 FY26, Westgold’s total cash, bullion and investments totalled $472M.
Cash, Bullion and Investments
Description
Jun 2025
Quarter ($M)
Sep 2025
Quarter ($M)
Variance
($M)
Variance
(%)
Cash 240 357 117 49
Bullion 96 61 (35) (36)
Investments1
28 54 26 93
Cash and Bullion 364 472 108 30
1. Investments exclude investment in Blackcat Syndicate (BC8) under escrow until 31 March 2026.
Debt
Westgold’s unhedged debt facility of $300M under the Syndicated Facility Agreement with ING Bank (Australia)
Limited and Societe Generale incorporates two Revolving Corporate Facilities (Facility A - $100M) and a Term
Loan (Facility B - $200M). On 30 September 2025, Facility B expired leaving Westgold with access to $50M of
the underdrawn Facility A.
Gold Hedging
Westgold is fully unhedged, completely leveraged to the gold price and achieved an average gold price of
$5,296/oz for Q1 FY26 (Q4 FY25 $5,174/oz).
Divestment of non-core assets
As part of Westgold’s ongoing strategy to focus on its larger operational assets and bring value forward into the
3YO, the Company commenced a formal divestment process for three smaller non-core properties including
Peak Hill (near Fortnum), Mt Henry-Selene (near Norseman), and Chalice (near Higginsville).
These smaller gold assets contain existing Mineral Resources (circa 1.6Moz in total) and are not included in
Westgold’s three-year outlook or longer term mine plans. With a view to crystallising value from these assets
for our shareholders Westgold has commenced adivestmentprogramme which, amongst other value benefits,
could deliver additional ore to Westgold hubs via new ore purchase agreements.
The divestment process for these three assets is targeted for completion in Q3 FY26.
In addition to this divestment programme, Westgold is evaluating potential value accretive options regarding
the Comet and South-Emu Triton underground mines (currently in care and maintenance) and associated
tenure in the Murchison.
Share Capital
Westgold closed the quarter with the following capital structure:
Security Type Number on Issue
Fully Paid Ordinary Shares 944,831,564
Performance Rights (Rights) , ,
September 2025 Quarterly Report 15
Dividend & Share buyback
During the quarter, Westgold declared a FY25 final unfranked dividend of 3 cents per share, reflecting the
com any’s strong financial erformance and robust cash flow generation in FY . This dividend, totalling
$28.3M and representing a 78% payout ratio, was approved by the Board and paid on 10 October 2025.
The dividend decision was made after careful consideration of Westgold’s forecast cash flows and o erating
scale and mar s a continuation of the com any’s commitment to shareholder returns, with . M in
dividends paid since the inception of its policy in FY24. The Board also enhanced the dividend policy for FY26,
doubling the minimum dividend per share to 2 cents per share and raising the required minimum net cash
balance to $150M after dividend payments.
To complement our capital return programme, Westgold’s Board authorised an FY26 on-market share buyback
of u to % of the com any’s ordinary shares (to be executed over the next 12months). This buyback, approved
and announced during the September quarter, is designed to enhance capital management and reflects the
Board’s confidence in Westgold’s 3YO and future cash flow generation.
The programme will be conducted in accordance with Australian and Canadian securities laws, with purchases
made through the A X at the com any’s discretion, sub ect to revailing share rices and mar et conditions.
By reducing the number of shares on issue, the buyback aims to increase shareholder value and further align
ca ital returns with the com any’s growth tra ectory and o erational outloo .
Quarterly conference call details
Wayne Bramwell (Managing Director & CEO), Tommy Heng (Chief Financial Officer) and Aaron Rankine (Chief
Operating Officer) will present the results via webcast on Tuesday, 28 October 2025 at 8:30AM AWST /
11:30AM AEDT, followed by a Q&A session.
To listen to the Webcast live, please click on the link below and register your details. After registering, you will
receive a confirmation email containing information about joining the webinar.
SEPTEMBER 2025 QUARTERLY WEBCAST
https://attendee.gotowebinar.com/register/3212880079702862424
Please log on a few minutes before the scheduled commencement time to ensure you are registered in time
for the start of the call.
September 2025 Quarterly Report 16
Compliance Statements
Forward Looking Statements
These materials re ared by Westgold esources imited or the “Company” include forward loo ing statements.
Often, but not always, forward looking statements can generally be identified by the use of forward looking words such
as “may”, “will”, “e ect”, “intend”, “believe”, “forecast”, “ redict”, “ lan”, “estimate”, “antici ate”, “continue”, and
“guidance”, or other similar words and may include, without limitation, statements regarding lans, strategies and
objectives of management, anticipated production or construction commencement dates and expected costs or
production outputs.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause
the om any’s actual results, erformance, and achievements to differ materially from any future results, performance,
or achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange
fluctuations and general economic conditions, increased costs and demand for production inputs, the speculative
nature of exploration and project development, including the risks of obtaining necessary licenses and permits and
diminishing quantities or grades of Ore Reserves, political and social risks, changes to the regulatory framework within
which the Company operates or may in the future operate, environmental conditions including extreme weather
conditions, recruitment and retention of personnel, industrial relations issues and litigation.
Forward loo ing statements are based on the om any and its management’s good faith assum tions relating to the
financial, mar et, regulatory and other relevant environments that will e ist and affect the om any’s business and
operations in the future. The Company