2023 Resource and Reserves Statement
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
11 SEPTEMBER 2023
WESTGOLD 2023 MINERAL RESOURCE AND ORE RESERVES
FY23 Drilling Builds Scale and Enhances Quality
Westgold Resources Limited (ASX: WGX - Westgold or the Company) is pleased to provide its updated Mineral
Resource and Ore Reserve Statement as of 30 June 2023.
HIGHLIGHTS
Group Mineral Resource grows by 311koz – post mining depletion of 282koz in FY23
6% increase in Ore Reserve grade and 7% increase in Mineral Resource grade
55% increase in Big Bell Mineral Resource Estimate
49% increase in Great Fingall Mineral Resource Estimate
Exploration budget of $25M for FY24
Eight (8) drill rigs currently operating – with further expansion of the Mineral Resource and subsequent
conversion to Ore Reserve expected during FY24.
Group Resource and Reserve Estimate
At 30 June 2023
Total Mineral Resources
107Mt at 2.39g/t Au for 8.3Moz of gold
Total Ore Reserves
23Mt at 2.68g/t Au for 2.0Moz of gold
Westgold Managing Director Wayne Bramwell commented:
“Westgold committed $19M to drilling across our operating assets in FY23.
This investment saw our Mineral Resource and Ore Reserve improve in quality, with our Mineral Resource
base growing by over 300koz. In short order we also replaced 42% of depleted Ore Reserves in this year.
Systematic drilling delivered large Mineral Resource increases at both Big Bell and Great Fingall. Group
grade increases across Mineral Resources and Ore Reserves gives us confidence that the quality of the
Group Resource and Reserve statement will continue to be enhanced as we continue to drill.
There is still untapped opportunity across our Murchison tenure that can be unlocked. In FY24 Westgold is
investing $25M towards exploration and resource definition drilling and we are confident that will deliver
additional Ore Reserves from our existing Mineral Resources.
Importantly, with increasing free cash flow and industry leading inhouse drilling capability, Westgold is now
internally funded, resourced and confident our team can build scale and add value through the drill bit.”
Westgold Resources Limited (ASX: WGX)
ACN 009 260 306
Level 6, 200 St Georges Terrace, Perth WA 6000
+61 8 9462 3400
perth.reception@westgold.com.au
www.westgold.com.au
ASX: WGX
MINERAL RESOURCE COMMENTARY
Westgold historically underinvested in drilling, resulting in the depletion of its Mineral Resource base until FY22
(Figure 1). The Company began to address this trend in FY23, investing $19M towards exploration and resource
drilling.
This investment achieved 4% growth in Westgold’s Mineral Resource base for the first time since 2017 and
delivered a 7% improvement in global Mineral Resource grade.
As of 30 June 2023 the total Mineral Resource estimate is 107Mt at 2.39g/t Au for 8.3Moz of gold.
+7%
9,857
2.39
9,345
9,118
2.17
2.10
2.11
8,799
2.22
2.24
2.14
+4%
8,250
2017
2018
2019
2020
Resource Grade (g/t)
7,947
7,940
2021
2022
2023
Resource Oz (koz)
Figure 1 - Resource growth achieved in 2023 with vastly improved grade 1
Westgold’s Mineral Resources are in two distinct geological terranes. The Archean Murchison Province (our
Murchison Operations) and the Proterozoic Bryah Basin (our Bryah Operations).
The Murchison Operations incorporate the Bluebird and Tuckabianna processing hubs. Westgold has the
operational flexibility to process ore at either of these locations and as such has reported Mineral Resource and
Ore Reserves within the Murchison Province as a single entity.
The Bryah Operations are separate geologically, are all processed at the Fortnum processing hub and are
reported as the Bryah Gold Operation.
1 Mineral Resources of divested assets excluded from historical Group Mineral Resources
11 SEPTEMBER 2023
WESTGOLD 2023 MINERAL RESOURCE AND ORE RESERVES
2
ASX: WGX
Table 1 below depicts the FY23 Mineral Resource statement for the Murchison and Bryah Operations.
Table 1 - Mineral Resource Estimates on 30 June 2023
Murchison Gold Operations
Mineral Resource Statement - Rounded for Reporting
30/06/2023
Measured
Project
Tonnes
Grade
('000s)
Indicated
Ounces
Au
('000s)
Tonnes
('000s)
Inferred
Grade
Ounces
Au
('000s)
Tonnes
('000s)
Total
Grade
Ounces
Au
('000s)
Tonnes
('000s)
Grade
Ounces
Au
('000s)
Big Bell
Cuddingwarra
Day Dawn
Tuckabianna
Tuckabianna Stockpiles
Meekatharra North
Nannine
Paddy's Flat
Reedy's
Yaloginda
Bluebird Stockpiles
5,498
85
58
267
481
0
68
1,033
458
745
656
3.08
1.66
1.73
3.54
1.64
0.00
2.55
4.03
3.74
4.30
1.50
544
5
3
30
25
0
6
134
55
103
32
9,917
1,600
3,776
3,448
3,744
97
859
10,593
3,055
7,737
0
3.23
1.63
4.63
2.78
0.70
1.98
2.06
1.70
2.55
1.93
0.00
1,030
84
562
308
85
6
57
579
251
481
0
8,942
597
2,339
2,899
0
75
340
2,415
8,883
6,981
0
2.73
1.50
4.29
2.63
0.00
2.11
2.26
1.86
2.44
1.48
0.00
785
29
322
245
0
5
25
144
698
332
0
24,357
2,282
6,173
6,614
4,225
172
1,267
14,042
12,396
15,464
656
3.01
1.59
4.47
2.75
0.81
2.04
2.14
1.90
2.52
1.84
1.50
2,358
117
887
584
110
11
87
857
1,004
916
32
Total
9,350
3.11
936
44,827
2.39
3,441
33,472
2.40
2,585
87,649
2.47
6,963
Bryah Gold Operations
Mineral Resource Statement - Rounded for Reporting
30/06/2023
Measured
Indicated
Inferred
Tonnes
('000s)
Grade
Fortnum
Horseshoe
Peak Hill
Stockpiles
1,019
0
0
846
3.53
0.00
0.00
0.94
116
0
0
25
4,446
1,266
7,547
464
2.50
2.09
1.55
0.70
357
85
376
10
2,078
183
1,838
16
3.05
1.43
1.78
0.54
204
8
105
0
7,543
1,449
9,385
1,326
2.79
2.01
1.60
0.85
677
93
481
36
Total
1,865
2.36
141
13,724
1.88
828
4,115
2.40
318
19,704
2.03
1,287
Project
Tonnes
('000s)
Grade
Ounces
Au
('000s)
Tonnes
('000s)
Total
Ounces
Au
('000s)
Grade
Ounces
Au
('000s)
Tonnes
('000s)
Grade
Ounces
Au
('000s)
Note – Operating Mines are as follows: Starlight (Fortnum Project), Paddy’s Flat (Paddy’s Flat Project), Bluebird
(Yaloginda Project), Big Bell (Big Bell Project).
Major Development projects are as follows: Fender (Big Bell Project), Great Fingall (Day Dawn Project), Causton’s
(Tuckabianna Project), Triton – South Emu (Reedy Project), Fiveways (Peak Hill Project).
See Figure 2 and Figure 3 for location details. Additional detailed information relating to generation of the
Mineral Resource Estimates is attached in Appendix 1 Table 1 – JORC 2012 Reporting Criteria.
11 SEPTEMBER 2023
WESTGOLD 2023 MINERAL RESOURCE AND ORE RESERVES
3
ASX: WGX
Figure 2 - Murchison Project Areas
All defined Mineral Resources are based upon a combination of reverse circulation (RC) and diamond drillholes.
Face sampling data is used in underground mines. Drill sampling is via rotary cone splitter or sawn half core
depending on drilling technique. Assays are completed by a third-party commercial laboratory and analysed via
fire assay. Historical drilling has previously used fire assay, aqua regia and PAL analysis, with all methodologies
used being relevant for the style of resources reported.
11 SEPTEMBER 2023
WESTGOLD 2023 MINERAL RESOURCE AND ORE RESERVES
4
ASX: WGX
Figure 3 - Bryah Project Areas
Westgold generates its Mineral Resource Estimates using a three-dimensional solid model (3DM) of the orebody
(in GEOVIA SurpacTM or Seequent LeapfrogTM for Westgold generated Mineral Resources - a mixture of Surpac,
Maptek VulcanTM and DatamineTM for legacy Mineral Resources). Interpretation is undertaken in a combination
of section, plan and 3D space in an attempt to create the most accurate approximation of mineralisation spatial
distribution.
Once complete, available sample data (aside from open hole drilling) is intersected with the solids to extract
assay composites. From this point appropriate estimation techniques, such as ordinary kriging are used to fill a
block model using parameters guided by geological understanding and geostatistical review of the constituent
data. This modelling considers potential mining methods and minimum mining widths whilst resource
classifications align with drillhole spacings, data quality and geological and grade continuity.
The year-on-year Mineral Resource Estimate inventory change is shown in Figure 4. Highlights include Mineral
Resource growth at Starlight (see Figure 5), Bluebird (see Figure 6) and Great Fingall (see Figure 7).
11 SEPTEMBER 2023
WESTGOLD 2023 MINERAL RESOURCE AND ORE RESERVES
5
ASX: WGX
7,940
Mineral Resource (koz)
8,250
576
282
16
Opening
Resources
Mining
Depletion
Stockpile
Changes
Res. Dev
Activities
Closing
Resources
Figure 4 - Investment in drilling grows Mineral Resource in FY23 by 4%
Figure 5 - Starlight Mineral Resource Growth Schematic FY23
11 SEPTEMBER 2023
WESTGOLD 2023 MINERAL RESOURCE AND ORE RESERVES
6
ASX: WGX
Figure 6 - Bluebird Mineral Resource Growth Schematic FY23
Figure 7 - Great Fingall Resource Growth Schematic FY23
11 SEPTEMBER 2023
WESTGOLD 2023 MINERAL RESOURCE AND ORE RESERVES
7
ASX: WGX
Ore Reserve Commentary
Figure 8 depicts a declining trend in Westgold’s Ore Reserves since 2017, a result of historical underinvestment
in resource definition drilling. Through its investment in FY23, Westgold replaced 42% of its Ore Reserves
depleted through production and increased its Ore Reserve grade by 6%.
In FY24, Westgold expects to spend $25M towards exploration and resource definition drilling with a focus on
Mineral Resource conversion into Ore Reserves.
As of 30 June 2023 the total Ore Reserve is 23Mt at 2.68g/t Au for 2.0Moz of gold.
2,649
2,643
2,620
2,555
2,208
2,116
1,954
1,536
1,279
527
306
140
2017
2018
1,008
762
2019
2020
Reserve Oz (koz)
2021
2022
2023
Cumulative Production (koz)
Figure 8 - Westgold Group Cumulative Gold Production and Ore Reserves 2
Table 2 below depicts the FY23 Ore Reserves statement for the Murchison and Bryah Operations.
Table 2 - Ore Reserves as of 30 June 2023
Project
Tonnes
('000s)
Murchison Gold Operations
Ore Reserve Statement - Rounded for Reporting
30/06/2023
Proven
Probable
Ounces
Tonnes
Ounces
Grade
Grade
Au ('000s) ('000s)
Au ('000s)
Big Bell
Cuddingwarra
Day Dawn
Tuckabianna
Tuckabianna Stockpiles
Meekatharra North
Nannine
Paddy's Flat
Reedy's
Yaloginda
Bluebird Stockpiles
3,573
0
0
0
481
0
0
117
57
192
656
2.85
0.00
0.00
0.00
1.64
0.00
0.00
3.54
3.35
5.10
1.50
327
0
0
0
25
0
0
13
6
31
32
6,270
98
1,944
683
3,744
0
262
420
398
566
0
3.31
1.77
5.08
3.00
0.70
0.00
1.93
3.47
3.42
4.81
0.00
668
6
317
66
85
0
16
47
44
88
0
9,843
98
1,944
683
4,225
0
262
538
455
757
656
3.14
1.77
5.08
3.00
0.81
0.00
1.93
3.48
3.41
4.89
1.50
995
6
317
66
110
0
16
60
50
119
32
Total
5,076
2.67
435
14,384
2.89
1,335
19,461
2.83
1,770
Total
Tonnes
('000s)
Grade
Ounces
Au ('000s)
2 Ore Reserves of divested assets excluded from historical Group Ore Reserves
11 SEPTEMBER 2023
WESTGOLD 2023 MINERAL RESOURCE AND ORE RESERVES
8
ASX: WGX
Bryah Gold Operations
Ore Reserve Statement - Rounded for Reporting
30/06/2023
Proven
Probable
Ounces Au Tonnes
Ounces
Grade
Grade
('000s)
('000s)
Au ('000s)
Tonnes
('000s)
Grade
Ounces Au
('000s)
Total
Project
Tonnes
('000s)
Fortnum
Horseshoe
Peak Hill
Stockpiles
403
0
0
846
2.82
0.00
0.00
0.94
37
0
0
25
1,172
357
0
464
2.29
2.18
0.00
0.70
86
25
0
10
1,576
357
0
1,310
2.42
2.18
0.00
0.85
123
25
0
36
Total
1,249
1.54
62
1,994
1.90
122
3,243
1.76
184
Ore Reserves are a subset of Measured and Indicated Mineral Resources only. All open pit and underground
operations were depleted to 30 June 2023.
Ore Reserves have been generated from design studies at a Pre-Feasibility or Feasibility stage using appropriate
cost, geotechnical, slope angle, stope span, dilution, cut-off grade and mining and metallurgical recovery
parameters which are specific to each mine. Mining methods applied are resource specific and based upon
experience with similar orebodies. DeswikTM (underground) along with GEOVIA WhittleTM and GEOVIA SurpacTM
(open pit) mining software was used to create mine designs. A maximum A$2,600/oz gold price has been used
to establish Ore Reserves and determine appropriate cut-off grades.
Mining, milling and additional overhead costs are based on currently contracted and budgeted operating costs.
Mill recoveries for all ore types are based upon operating experience or metallurgical test work. Ore Reserves
consider environmental, tenement, government and infrastructure approvals along with transportation
requirements to market.
Stockpiles consist of ROM stocks and low-grade stocks both mined by Westgold and accumulated by previous
owners.
The minor reduction in Ore Reserves outside of mining depletion (refer to Figure 9) was driven by:
Increases in Ore Reserves at key development projects:
o
Big Bell Expansion (+197koz) (see Figure 10); and
o
Great Fingall (+68koz).
The transition to a higher quality, underground dominated Ore Reserve base and the subsequent removal
of marginal open pit Ore Reserves including:
o
Black Swan South (-27koz);
o
Tuckabianna West (-16koz); and
o
Yarlarweelor (-43koz), Five Ways (-41koz), Horseshoe – Cassidy – Pod (-20koz).
Removal of marginal underground Ore Reserves – Boomerang – Kurara (-35koz).
11 SEPTEMBER 2023
WESTGOLD 2023 MINERAL RESOURCE AND ORE RESERVES
9
ASX: WGX
2,116
282
Ore Reserve (koz)
1,954
103
16
Opening
Reserves
Mining
Depletion
Stockpile
Changes
Res. Dev
Activities
Closing
Reserves
Figure 9 - Westgold replaced 42% of mining depletion in FY23
Figure 10 - Big Bell Ore Reserve Growth Schematic FY23
11 SEPTEMBER 2023
WESTGOLD 2023 MINERAL RESOURCE AND ORE RESERVES
10
ASX: WGX
Additional detailed information relating to generation of the Ore Reserves is attached in Appendix 1 Table
1 – JORC 2012 Reporting Criteria.
ENDS
THIS ANNOUNCEMENT IS AUTHORISED FOR RELEASE TO THE ASX BY THE BOARD.
MEDIA AND INVESTOR RELATIONS ENQUIRIES
INVESTOR RELATIONS
Kasun Liyanaarachchi| Investor Relations Manager
Investor.Relations@westgold.com.au
+61 458 564 483
MEDIA
Peter Knight | Communications Advisor
Peter.Knight@westgold.com.au
+61 459 980 481
11 SEPTEMBER 2023
WESTGOLD 2023 MINERAL RESOURCE AND ORE RESERVES
11
ASX: WGX
COMPETENT PERSON STATEMENTS
EXPLORATION RESULTS AND MINERAL RESOURCES ESTIMATES
The information in this report that relates to Exploration results and Mineral Resource Estimates is compiled by Westgold
technical employees and contractors under the supervision of Mr. Jake Russell B.Sc. (Hons), who is a member of the Australian
Institute of Geoscientists. Mr Russell is a full-time employee of the company and has sufficient experience which is relevant
to the styles of mineralisation and types of deposit under consideration and to the activities which he is undertaking to qualify
as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves. Mr Russell consents to the inclusion in this report of the matters based on his information in the
form and context in which it appears. Mr Russell is eligible to participate in short- and long-term incentive plans of the
company.
ORE RESERVES
The information in this report that relates to Ore Reserve is based on information compiled by Mr. Leigh Devlin B.Eng.
MAusIMM. Mr. Devlin has sufficient experience which is relevant to the styles of mineralisation and types of deposit under
consideration and to the activities which they are undertaking to qualify as a Competent Person as defined in the 2012
Editions of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC 2012)”.
Mr. Devlin consents to the inclusion in this report of the matters based on his information in the form and context in which it
appears. Mr. Devlin is a full-time senior executive of the Company and is eligible to and may participate in short-term and
long-term incentive plans of the Company as disclosed in its annual reports and disclosure documents.
FORWARD LOOKING STATEMENTS
These materials prepared by Westgold Resources Limited (or “the Company”) include forward looking statements. Often, but
not always, forward looking statements can generally be identified by the use of forward looking words such as “may”, “will”,
“expect”, “intend”, “plan”, “estimate”, “anticipate”, “continue”, and “guidance”, or other similar words and may include,
without limitation, statements regarding plans, strategies and objectives of management, anticipated production or
construction commencement dates and expected costs or production outputs.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the
Company’s actual results, performance and achievements to differ materially from any future results, performance or
achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange
fluctuations and general economic conditions, increased costs and demand for production inputs, the speculative nature of
exploration and project development, including the risks of obtaining necessary licenses and permits and diminishing
quantities or grades of reserves, political and social risks, changes to the regulatory framework within which the Company
operates or may in the future operate, environmental conditions including extreme weather conditions, recruitment and
retention of personnel, industrial relations issues and litigation.
Forward looking statements are based on the Company and its management’s good faith assumptions relating to the financial,
market, regulatory and other relevant environments that will exist and affect the Company’s business and operations in the
future. The Company does not give any assurance that the assumptions on which forward looking statements are based will
prove to be correct, or that the Company’s business or operations will not be affected in any material manner by these or
other factors not foreseen or foreseeable by the Company or management or beyond the Company’s control.
Although the Company attempts and has attempted to identify factors that would cause actual actions, events or results to
differ materially from those disclosed in forward looking statements, there may be other factors that could cause actual
results, performance, achievements or events not to be as anticipated, estimated or intended, and many events are beyond
the reasonable control of the Company.
Accordingly, readers are cautioned not to place undue reliance on forward looking statements. Forward looking statements
in these materials speak only at the date of issue. Subject to any continuing obligations under applicable law or any relevant
stock exchange listing rules, in providing this information the Company does not undertake any obligation to publicly update
or revise any of the forward-looking statements or to advise of any change in events, conditions or circumstances.
11 SEPTEMBER 2023
WESTGOLD 2023 MINERAL RESOURCE AND ORE RESERVES
12
ASX: WGX
APPENDIX A – JORC 2012 TABLE 1– GOLD DIVISION
SECTION 1 SAMPLING TECHNIQUES AND DATA
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling techniques
Drilling techniques
JORC Code Explanation
•
Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised industry
standard measurement tools appropriate to the minerals under investigation, such as down
hole gamma sondes, or handheld XRF instruments, etc.). These examples should not be taken
as limiting the broad meaning of sampling.
•
Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.
•
Aspects of the determination of mineralisation that are Material to the Public Report.
In cases where ‘industry standard’ work has been done this would be relatively simple (e.g.
•
‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases more explanation may be required, such
as where there is coarse gold that has inherent sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information.
•
•
•
Drill sample recovery
•
Commentary
•
•
•
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter, triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is oriented and if so, by what method, etc.).
Method of recording and assessing core and chip sample recoveries and results assessed.
Measures taken to maximise sample recovery and ensure representative nature of the •
samples.
Whether a relationship exists between sample recovery and grade and whether sample bias
may have occurred due to preferential loss/gain of fine/coarse material.
•
•
Logging
•
•
•
Whether core and chip samples have been geologically and geotechnically logged to a level of •
detail to support appropriate Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc.)
photography.
•
The total length and percentage of the relevant intersections logged
•
11 SEPTEMBER 2023
WESTGOLD 2023 MINERAL RESOURCE AND ORE RESERVES
Diamond Drilling
A significant portion of the data used in resource calculations has been gathered from diamond
core. Multiple sizes have been used historically. This core is geologically logged and
subsequently halved for sampling. Grade control holes may be whole-cored to streamline the
core handling process if required.
Face Sampling
At each of the major past and current underground producers, each development face / round
is horizontally chip sampled. The sampling intervals are domained by geological constraints
(e.g. rock type, veining and alteration / sulphidation etc.). The majority of exposures within the
orebody are sampled.
Sludge Drilling
Sludge drilling at is performed with an underground production drill rig. It is an open hole
drilling method using water as the flushing medium, with a 64mm (nominal) hole diameter.
Sample intervals are ostensibly the length of the drill steel. Holes are drilled at sufficient angles
to allow flushing of the hole with water following each interval to prevent contamination.
Sludge drilling is not used to inform resource models.
RC Drilling
Drill cuttings are extracted from the RC return via cyclone. The underflow from each interval is
transferred via bucket to a four-tiered riffle splitter, delivering approximately three kilograms of
the recovered material into calico bags for analysis. The residual material is retained on the
ground near the hole. Composite samples are obtained from the residue material for initial
analysis, with the split samples remaining with the individual residual piles until required for resplit analysis or eventual disposal.
RAB / Aircore Drilling
Combined scoops from bucket dumps from cyclone for composite. Split samples taken from
individual bucket dumps via scoop. RAB holes are not included in the resource estimate.
Blast Hole Drilling
Cuttings sampled via splitter tray per individual drill rod. Blast holes not included in the
resource estimate.
All geology input is logged and validated by the relevant area geologists, incorporated into this
is assessment of sample recovery. No defined relationship exists between sample recovery and
grade. Nor has sample bias due to preferential loss or gain of fine or coarse material been noted.
Westgold surface drill-holes are all orientated and have been logged in detail for geology, veining,
alteration, mineralisation and orientated structure. Westgold underground drill-holes are
logged in detail for geology, veining, alteration, mineralisation and structure. Core has been
logged in enough detail to allow for the relevant mineral resource estimation techniques to
be employed.
Surface core is photographed both wet and dry and underground core is photographed wet. All
photos are stored on the Company’s servers, with the photographs from each hole contained
within separate folders.
Development faces are mapped geologically.
13
ASX: WGX
Criteria
Sub-sampling techniques
and sample preparation
JORC Code Explanation
•
•
•
•
•
•
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc. and whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the sample preparation
technique.
Quality control procedures adopted for all sub-sampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is representative of the in-situ material
collected, including for instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material being sampled.
Commentary
•
•
•
•
RC, RAB and Aircore chips are geologically logged.
Sludge drilling is logged for lithology, mineralisation and vein percentage.
Logging is quantitative in nature.
All holes are logged completely, all faces are mapped completely.
•
•
Blast holes -Sampled via splitter tray per individual drill rods.
RAB / AC chips - Combined scoops from bucket dumps from cyclone for composite. Split
samples taken from individual bucket dumps via scoop.
RC - Three tier riffle splitter (approximately 5kg sample). Samples generally dry.
Face Chips - Nominally chipped horizontally across the face from left to right, sub-set via
geological features as appropriate.
Diamond Drilling - Half-core niche samples, sub-set via geological features as appropriate.
Grade control holes may be whole-cored to streamline the core handling process if required.
Chips / core chips undergo total preparation.
Samples undergo fine pulverisation of the entire sample by an LM5 type mill to achieve a 75µ
product prior to splitting.
QA/QC is currently ensured during the sub-sampling stages process via the use of the systems
of an independent NATA / ISO accredited laboratory contractor. A significant portion of the
historical informing data has been processed by in-house laboratories.
The sample size is considered appropriate for the grain size of the material being sampled.
The un-sampled half of diamond core is retained for check sampling if required. For RC chips
regular field duplicates are collected and analysed for significant variance to primary results.
•
•
•
•
•
•
•
•
Quality of assay data and
laboratory tests
•
•
•
Verification of sampling and
assaying
•
•
•
•
The nature, quality and appropriateness of the assaying and laboratory procedures used and •
whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc., the parameters used in
determining the analysis including instrument make and model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision
•
have been established.
•
•
The verification of significant intersections by either independent or alternative company
•
personnel.
•
The use of twinned holes.
Documentation of primary data, data entry procedures, data verification, data storage
•
(physical and electronic) protocols.
Discuss any adjustment to assay data.
•
•
11 SEPTEMBER 2023
WESTGOLD 2023 MINERAL RESOURCE AND ORE RESERVES
Recent drilling was analysed by fire assay as outlined below;
•
A 40g sample undergoes fire assay lead collection followed by flame atomic adsorption
spectrometry.
•
The laboratory includes a minimum of 1 project standard with every 22 samples
analysed.
•
Quality control is ensured via the use of standards, blanks and duplicates.
No significant QA/QC issues have arisen in recent drilling results.
Historical drilling has used a combination of Fire Assay, Aqua Regia and PAL analysis.
These assay methodologies are appropriate for the resources in question.
No independent or alternative verifications are available.
Virtual twinned holes have been drilled in several instances across all sites with no significant
issues highlighted. Drillhole data is also routinely confirmed by development assay data in the
operating environment.
Primary data is collected utilising LogChief. The information is imported into a SQL database
server and verified.
All data used in the calculation of resources and reserves are compiled in databases
(underground and open pit) which are overseen and validated by senior geologists.
No adjustments have been made to any assay data.
14
ASX: WGX
Criteria
Location of data points
Data spacing and
distribution
Orientation of data in
relation to geological
structure
Sample security
Audits or reviews
JORC Code Explanation
Commentary
•
Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), •
All data is spatially oriented by survey controls via direct pickups by the survey department.
trenches, mine workings and other locations used in Mineral Resource estimation.
Drillholes are all surveyed downhole, deeper holes with a Gyro tool if required, the majority
with single / multishot cameras.
•
Specification of the grid system used.
•
All drilling and resource estimation is preferentially undertaken in local mine grid at the various
•
Quality and adequacy of topographic control.
sites.
Topographic control is generated from a combination of remote sensing methods and ground•
based surveys. This methodology is adequate for the resources in question.
•
Data spacing for reporting of Exploration Results.
•
Data spacing is variable dependent upon the individual orebody under consideration. A lengthy
history of mining has shown that this approach is appropriate for the Mineral Resource
Whether the data spacing and distribution is
Share your feedback