2.9Mtpa Meekatharra Expansion Plan
Released
Released
Announcement PDF
ASX Announcement
Westgold Resources Limited
ABN 60 009 260 306
ASX | TSX: WGX
T: +61 8 9462 3400
E: perth.reception@westgold.com.au
W: westgold.com.au
Level 13, 200 St Georges Terrace
Perth WA 6000
PO Box 7068, Cloisters Square WA 6850
25 August 2026
2.9Mtpa Meekatharra Expansion Plan
Scoping Study outlines staged, capital-efficient brownfields option to unlock
additional Meekatharra ore supply and improve future cash generation
Perth, Western Australia, 25 August 2026: Westgold Resources Limited (ASX | TSX: WGX,
Westgold or the Company) is pleased to report the results of a Scoping Study assessing a
brownfields expansion of processing capacity at the Meekatharra hub from 1.8Mtpa to 2.9Mtpa
(Meekatharra Expansion Plan or MXP). The study outlines a potential capital-efficient pathway to
process additional emerging ore supply, lift future gold production, reduce processing unit costs
and improve cash generation, subject to completion of feasibility-level technical, economic and
approvals work.
MXP is being advanced as a low-capital-intensity, brownfields expansion option that leverages
Westgold’s existing Meekatharra infrastructure and long-lead equipment already procured. The
preferred pathway is intended to remove an emerging processing constraint and create a larger,
more flexible platform for the Murchison ore base, without the cost, risk or timeframe of
constructing a new standalone processing plant.
Processing Expansion to 2.9Mtpa
The MXP Scoping Study outlines a capital-efficient pathway to increase Meekatharra hub
throughput capacity from 1.8Mtpa to 2.9Mtpa in FY28, potentially adding approximately 47kozpa
of gold production once commissioned. The MXP comprises installation of a parallel crushing
and single-stage SAG milling circuit integrated with the existing downstream leach, adsorption
and gold recovery infrastructure.
The MXP is predicated upon the increasing volume of ore supply available to Westgold at
Meekatharra. Increasing outputs from the nearby Bluebird–South Junction underground and a
range of open pits being developed across Westgold’s Murchison Open Pit program is diversifying
baseload ore sources and lifting plant utilisation, throughputs and metallurgical recovery from
this processing hub.
Value Uplift
The MXP is a capital-efficient option to convert more of Westgold’s existing and future
Meekatharra mineral resources into mill feed, lower processing unit costs and strengthen Group
free cash flow across its strategic outlook. Its value will be progressively confirmed through
feasibility-level work, ore source validation, capital estimate refinement and execution planning
now underway.
2.9Mtpa Meekatharra Expansion Plan
25 August 2026
2
Highlights
MXP expands Meekatharra hub throughput from 1.8Mtpa to 2.9Mtpa
~61% increase in processing capacity in FY28
MXP adds ≈ 47kozpa to baseline production once commissioned for total gold
production of 1.6Moz over 10 years (an increase of 424koz)
Supported by existing hub infrastructure and processing scale benefits
Brownfields resource definition drilling and open pit optimisations commenced –
opportunities proximate to Meekatharra hub support the expansion case
Polar Star Lode (within Bluebird-South Junction mine)
Nannine and Paddy’s Flat (near Meekatharra)
Key MXP Scoping Study outputs include:
Indicative Capital of approximately $100M – with target commissioning in FY28
o Representing the upper end of the Scoping Study range of $65M–$100M
Payback period of 9 months
MXP Life of Mine (LoM) gold production – 1.5 – 1.8 Moz
o At All in Sustaining Cost (AISC) range of $1,968 - $2,406/oz
Project NPV improves by ~$1.1B at a gold price of $5,500/oz
o Increases to ~$1.6B at spot gold price of $6,000/oz
Cautionary Statement
The Scoping Study referred to in this report is based on low-level technical and economic
assessments and is insufficient to support estimation of Ore Reserves or to provide assurance of
an economic development case at this stage, or to provide certainty that the conclusions of the
Scoping Study will be realised. The information in this announcement relating to processing
expansion concepts, study outcomes, resource definition work, potential brownfields
opportunities and indicative financial metrics is based on preliminary internal and consultant
study work.
The MXP study is at Scoping Study level and associated capital estimates are described as having
estimate accuracy of ±35%. The expansion study is also preliminary in nature.
The financial metrics presented in this announcement are indicative study-stage ranges only, are
provided to illustrate the potential scale of the opportunities under internal development
scenarios and should not be interpreted as a Final Investment Decision or an Ore Reserve
statement. Any future public reporting of Mineral Resources, Ore Reserves or forecast financial
information will be made in accordance with the ASX Listing Rules and the JORC Code (2012),
where applicable.
2.9Mtpa Meekatharra Expansion Plan
25 August 2026
3
The Scoping Study is based on the material assumptions outlined below. These include
assumptions about the availability of funding. While Westgold considers all of the material
assumptions to be based on reasonable grounds, there is no certainty that they will prove to be
correct or that the range of outcomes indicated by the Scoping Study will be achieved.
The Meekatharra hub Production Target comprises 31% Ore Reserves, 44% Measured and
Indicated Mineral Resources, 14% Inferred Mineral Resources and 11% third-party production.
Third-party ore is supported by existing binding ore purchase agreements. No unclassified
Westgold material is included in the Production Target. Inferred Mineral Resources are not
scheduled until FY35, after forecast recovery of the expansion capital. Mining areas within the
production target are available for ongoing resource definition and eventual mining.
The forecast capital payback period of approximately nine months occurs before any scheduled
processing of Inferred Mineral Resources. Recovery of the expansion capital is therefore
supported by Ore Reserves, Measured and Indicated Mineral Resources, existing stockpiles and
contracted third-party ore included in the initial production schedule. Westgold considers that it
has reasonable grounds for the forecast payback period and associated financial information
based on the material assumptions disclosed in this announcement.
Westgold confirms that the MXP remains financially viable at Scoping Study accuracy when
Inferred Mineral Resources are excluded from the production schedule. The Company therefore
considers that it has reasonable grounds for the production target and forecast financial
information, having regard to the material assumptions disclosed in this announcement.
There is a low level of geological confidence associated with Inferred Mineral Resources, and
there is no certainty that further exploration work will result in the determination of Indicated
Mineral Resources for the current Inferred portion, or that the production target itself will be
realised.
While Westgold considers all the material assumptions used in the Scoping Study to be based on
reasonable grounds, there is no certainty that they will prove to be correct or that the range of
outcomes indicated by the Scoping Study will be achieved.
To achieve the range of outcomes indicated in the Scoping Study, funding in the order of $100M
will likely be required. Investors should note that there is no certainty that Westgold will be able
to raise that amount of funding when needed. The Company as at 30 June 2026 had $939M of
cash, bullion and liquid investments (refer ASX – 22 July 2026, June 2026 Quarterly Report).
Additionally, Westgold announced it had executed a commitment letter with its existing lenders
to increase its Syndicated Facility Agreement to $600M.
Given the uncertainties involved, investors should not make any investment decisions based
solely on the results of the Scoping Study.
2.9Mtpa Meekatharra Expansion Plan
25 August 2026
4
Westgold Managing Director and CEO Wayne Bramwell commented:
“Meekatharra is the growth engine of Westgold’s Murchison business. As Bluebird–South
Junction continues to expand and the Murchison open pit program ramps up, the hub is
increasingly moving from being mine-constrained to processing-constrained.
The MXP is a capital-efficient brownfields expansion option to address this emerging constraint.
It utilises existing infrastructure and long-lead equipment already procured to increase
processing capacity from 1.8Mtpa to 2.9Mtpa, without the capital intensity, execution risk or
timeframe of building a new plant.
The MXP provides a pathway to unlock emerging ore supply, increase gold production, reduce
processing unit costs and lift free cash flow. Westgold will now commence feasibility-level work
to confirm the engineering, capital estimate, delivery schedule and ore source assumptions
ahead of a potential MXP investment decision in late FY27.”
Meekatharra Expansion Project (MXP) – 1.8Mtpa to 2.9Mtpa
Meekatharra is reaching an important strategic inflection point, with the ramp-up of Bluebird-
South Junction, the restart of the Murchison open pit program and ongoing brownfields
evaluation strengthening the future ore supply base and increasing the importance of
available processing capacity.
MXP has been designed to address this emerging constraint by increasing installed processing
capacity at Meekatharra from 1.8Mtpa to 2.9Mtpa. The preferred pathway is a brownfields
expansion comprising a parallel crushing and single-stage SAG milling circuit integrated with the
existing downstream leach, adsorption and gold recovery infrastructure. This configuration is
expected to maximise the use of existing plant, services and infrastructure, while reducing the
capital intensity, execution complexity and development timeline associated with constructing a
new processing plant.
The preferred configuration also utilises long-lead equipment previously procured for the
Higginsville Expansion, which is now being reviewed as a larger-scale, single-stage expansion1
.
The MXP would establish a larger and more flexible processing platform capable of
accommodating a broader blend of underground, open pit and supplementary ore sources from
across the Meekatharra region (Figure 1).
1
Refer to ASX announcement titled “1.1Moz Maiden Fletcher Ore Reserve”, dated 18 August 2026.
2.9Mtpa Meekatharra Expansion Plan
25 August 2026
5
Figure 1: Cue and Meekatharra Hubs
MXP Scoping Study Summary
Note that all Scoping Study values represented are mid-point. Ranges are provided in Table 1.
• Average annual gold production of approximately 168koz (an increase of 47koz) - for
total gold production of 1.6Moz (an increase of 424koz).
• Processing underpinned by the long-life (>10 years) Bluebird underground mine - with
supplementary open pit feed from the Murchison Open Pit Program and ongoing regional
resource definition.
2.9Mtpa Meekatharra Expansion Plan
25 August 2026
6
• Scoping Study assumes an upgrade of the current Meekatharra 1.8Mtpa plant to
2.9Mtpa - for a capital cost of $100M (upper range).
• LoM AISC of approximately $2,187/oz.
• Pre-tax undiscounted cashflow of approximately $3.2B at a gold price of $5,500/oz -
increasing to $4.0B at Spot Gold Price ($6,000/oz).
• Net Present Value (NPV) of approximately $1.9B at a gold price of $5,500/oz - increasing
to $2.4B at Spot Gold Price ($6,000/oz).
An indicative comparison between the midpoints of the MXP and current operating plan (without
MXP case) is shown below in Table 1 (gold price $5,500/oz). This highlights the substantially
improved economics and processing capability within the region at only a slight reduction in
grade.
Metric Units Current MXP
Mined Tonnes Mt 18.2 27.6
Mined Grade g/t 2.2 2.0
Mined Ounces Moz 1.3 1.8
Recovered Ounces Moz 1.2 1.6
Free Cashflow $B 1.3 3.2
NPV $B 0.8 1.9
Table 2: Comparison between MXP and Current Milling Arrangement (no MXP)
Preliminary Financial Overview
The key physical and financial metrics in Table 2 and 3 below are presented as indicative study
stage ranges reflecting the preliminary nature of the current work, including scoping-level
estimate accuracy, study assumptions and internal scenario sensitivity.
They are shown to illustrate the potential scale of value creation from the expansion pathway and
should not be interpreted as a Final Investment Decision.
The production targets outlined in Table 2 below are at a Scoping Study level and should be read
together with the cautionary statements in this announcement.
2.9Mtpa Meekatharra Expansion Plan
25 August 2026
7
Table 2: Key Physical Assumptions
Metric Units MXP
Life of Mine Years 10
Installed Throughput Mtpa 2.9
Mine Output
Material Mined Mt 24.9 – 30.4
Au Grade g/t 1.8 – 2.2
Au Ounces Moz 1.6 – 2.0
Processing Physicals
Material Processed Mt 24.9 – 30.4
Au Grade g/t 1.8 – 2.2
Au Ounces Moz 1.6 – 2.0
Payable Metal (post recovery) Moz 1.5 – 1.8
A gold price of $5,500/oz has been used to assess the indicative economics of the MXP, which
is forecast to generate a project NPV of approximately $1.9B.
Table 3: Financial Results Summary
Financials at 7.3% Discount Factor Units MXP
Gold Price $/oz 5,500
Project Free Cash flow pre-tax $B 2.8 – 3.5
Project NPV $B 1.7 – 2.1
AISC $/oz 1,968 – 2,406
Sensitivity Analysis
Figure 2 depicts sensitivity analysis for MXP. It shows that while sensitive to gold price, the
project NPV is resilient to both discount rate and cost.
2.9Mtpa Meekatharra Expansion Plan
25 August 2026
8
Figure 2: MXP Sensitivity Analysis
MXP Basis for Production Target
The Production Target outlined in the Scoping Study is based on a mixture of Ore Reserve and
Mineral Resources across the Murchison and, as described in Figure 3, is a blend of
underground, open pit, stockpile and potential supplementary ore sources across the
Meekatharra hub and broader Murchison operating area.
Ongoing drilling to convert the Mineral Resources into Ore Reserves is ongoing across the
Murchison as part of the FY27 Resource Definition program (refer Figure 1). This program
includes:
• Bluebird–South Junction underground
The principal source of mill feed for MXP. Bluebird–South Junction has increased mine
output from approximately 250ktpa in FY22 to an exit run-rate of more than 1.0Mtpa by the
end of FY26.
Current planning assumes an exit mining rate of approximately 1.2Mtpa by the end of FY27.
Subject to mine planning, development sequencing, resource conversion and operating
performance, the combined Bluebird, South Junction and Polar Star mining areas are
modelled to increase progressively thereafter, with annual scheduled underground ore
reaching approximately 2.0Mtpa in later years of the Scoping Study production target
• Nannine
The Nannine mining centre (shown in Figure 1) houses the Aladdin and Golden Shamrock
open pits. As part of the Murchison Open Pit program, the Nannine area supports a key
mining zone within this program. Mining is currently six months into the program which is
expected to operate within this area for another eighteen months. Albury Heath (which sits
1,000 1,250 1,500 1,750 2,000 2,250 2,500 2,750
Discount Rate (±10%)
Capital Costs (±10%)
Op Cost (±10%)
Gold Price (±10%)
NPV ($'M)
2.9Mtpa Meekatharra Expansion Plan
25 August 2026
9
slightly outside the Nannine mining centre) is also included within this production target for
ease of reference.
• Paddy’s Flat
Satellite pits surrounding Paddy’s Flat have been included within the current LoM
schedule. This includes the Paddy’s North, Magazine and Prohibition open pits. Drilling
within the open pit targets is currently underway.
• Yaloginda
The Yaloginda area encompasses the region directly surrounding the Meekatharra
Processing Plant. The historic Haveluck, Batavia, Rhens, and Rocklee open pits have been
scheduled within the LoM. Whilst mined prior to Westgold ownership, these are less
mature with respect to geological understanding and as such require further drilling post
the Paddy’s Flat resource definition work.
• Third party ore sources
The schedule includes indicative Westgold estimates of potential supplementary third-
party feed over which Westgold have binding ore purchase agreements, including Crown
Prince from New Murchison Gold and Valiant Gold’s Reedy and Comet projects. These
sources are not critical to the economic viability of MXP but provide additional flexibility
and ore optionality to the expanded Meekatharra plant.
Figure 3: Production Schedule – MXP
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36
Mined
Tonnes
(kt)
Bluebird Reserve Bluebird M&I Resource Bluebird Inferred
Paddys Flat M&I Resource Paddys Flat Inferred Yaloginda M&I Resource
Yaloginda Inferred 3rd Party Stockpiles
Nannine Reserve Current Stockpiles Processing Capacity
2.9Mtpa Meekatharra Expansion Plan
25 August 2026
10
MXP Capital Costs
The Scoping Study-level capital estimate (Table 4) for MXP has been determined at
approximately $65M-$100M with estimate accuracy of ±35%, derived based on mechanical
equipment lists from several sources such as quotes, and actual prices used from Westgold’s
current operating mines.
Whilst overall contingency has been determined as a single line-item related to the total cost,
additional contingency has been built into the individual cost estimates reflecting the high-level
scoping nature of the study.
Table 4: Capital Cost Estimate – MXP
Equipment Name Units Cost
Primary Crushing $M 6.0 - 9.2
Stockpile and Reclaim $M 1.6 - 2.4
Milling $M 20.4 - 31.3
Gravity $M 3.5 - 5.3
Leach and Adsorption $M 4.6 - 7.0
Elution $M 5.8 - 8.9
Plant Air $M 0.4 - 0.6
Instrument Air $M 0.4 - 0.6
Total Equipment $M 41.6 – 64.0
Direct Costs $M 2.1 - 3.0
Indirect Costs $M 8.3 - 12.7
Contingency $M 12.5 - 19.2
Total Costs $M 65.0 – 100.0
Risks, Study Maturity and Mitigation Pathway
As with any processing expansion at this maturity, the Project remains subject to the risks and
uncertainties typical of study-stage brownfields developments.
For MXP, the principal variables include refinement of capital estimate accuracy, tie-in design,
infrastructure confirmation, procurement of key secondary equipment (as the key processing
equipment, the crusher and the SAG mill have already been purchased), construction scheduling
and management of commissioning risk while maintaining continuity of operations.
2.9Mtpa Meekatharra Expansion Plan
25 August 2026
11
Murchison Brownfields Growth Opportunities
Westgold’s Murchison portfolio includes multiple mature assets that could deliver incremental
open pit ore sources into existing regional operating centres. With disciplined capital allocation
these opportunities will be progressively tested through resource definition, mine design and
economic evaluation.
These opportunities are all located within the broader Murchison operating footprint and sit
within relatively short haulage distances of Westgold’s Cue and Meekatharra processing hubs.
Each area also benefits from historical mining activity, existing or legacy infrastructure and
established geological knowledge, making them attractive brownfields targets for further
evaluation.
As an example, at Paddy’s Flat near Meekatharra (Figure 4 and Figure 5), the current resource
definition focus is on assessing historically productive corridors for remnant mineralisation,
strike extensions and shallow targets that may support staged open pit cutbacks, satellite open
pits or otherwise incremental ore sources for the Meekatharra production base.
Figure 4: Paddy’s Flat Schematic Long Section
Drilling has begun in the Paddy’s North area with the focus the northern extensions of
Halcyon and Democrat pits.
These phases of work will test the continuation of the Prohibition strike to the North targeting the
historical Halcyon and Democrats pits which has been untested since mining ceased in the
1990s. The Halcyon pit produced approximately 500kt at 3.6g/t Au for 58koz, while the historical
Democrat pit produced approximately 192kt at 3.3g/t Au for 20koz. Following completion of
drilling along the Big Bell South line of lode at Cue, the drill rigs are expected to be mobilised to
the broader Paddy’s Flat area.
2.9Mtpa Meekatharra Expansion Plan
25 August 2026
12
Figure 5: Paddy’s Flat historical mining areas and brownfields targets
Next Steps
MXP and the Murchison brownfields resource definition program together provide a capital-
efficient pathway to grow the Meekatharra hub.
Lifting installed capacity from 1.8Mtpa to 2.9Mtpa in FY28 through existing infrastructure is
expected to deliver higher gold production, lower processing unit costs and improved free cash
flow, without the capital intensity or execution timeline of a new plant.
Next-stage work will focus on detailed feasibility study and front-end engineering design,
procurement planning, vendor engagement and execution sequencing, including shutdown
scheduling and securing long-lead items where appropriate. Study maturity will continue to be
advanced ahead of any investment decision.
Westgold will also continue its brownfields resource definition program, testing potential future
ore sources against haulage distance, mine design, processing fit and capital intensity to support
sustained utilisation of the expanded plant.
Westgold expects to incorporate MXP as part of its next strategic outlook, with FY28 currently
used as the indicative production timing for planning purposes. This timing is preliminary and
remains subject to feasibility-level studies, capital estimate refinement, execution planning, ore
source confirmation and any required investment decision.
This announcement is authorised for release to the ASX by the Board.
Investor and media relations enquiries
Investor Relations
KasunLiyanaarachchi
Group Manager Investor Relations & Communications
investor.relations@westgold.com.au
+61 458 564 483
Media
Annette Ellis
Manager Communications & Corporate Affairs
Media@westgold.com.au
+61 458 200 039
2.9Mtpa Meekatharra Expansion Plan
25 August 2026
13
Compliance Statements
Competent/Qualified Person Statements
Exploration Results and Mineral Resources Estimates
The information in this release that relates to Exploration results and Mineral Resource Estimates is
compiled by Westgold technical employees and contractors under the supervision of Mr. Jake Russell B.Sc.
(Hons), who is a member of the Australian Institute of Geoscientists and who has verified, reviewed and
approved such information. Mr Russell is a full-time employee of the Company and has sufficient experience
which is relevant to the styles of mineralisation and types of deposit under consideration and to the activities
which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the “JORC Code”) and as a
Qualified Person as defined in the CIM Guidelines and National Instrument 43-101 – Standards of Disclosure
for Mineral Projects (“NI 43-101”). Mr. Russell is an employee of the Company and, accordingly, is not
independent for purposes of NI 43-101. Mr Russell consents to and approves the inclusion in this release of
the matters based on his information in the form and context in which it appears. Mr Russell is eligible to
participate in short- and long-term incentive plans of the company.
Ore Reserves
The information in this release that relates to Ore Reserve is based on information compiled by Mr. Leigh
Devlin B.Eng. FAusIMM, who has verified, reviewed and approved such information. Mr. Devlin has sufficient
experience which is relevant to the styles of mineralisation and types of deposit under consideration and to
the activities which they are undertaking to qualify as a Competent Person as defined in the JORC Code and
as a Qualified Person as defined in the CIM Guidelines and NI 43-101. Mr. Devlin is an employee of the
Company and, accordingly, is not independent for purposes of NI 43-101. Mr. Devlin consents to and
approves the inclusion in this release of the matters based on his information in the form and context in
which it appears. Mr. Devlin is a full-time senior executive of the Company and is eligible to and may
participate in short-term and long-term incentive plans of the Company as disclosed in its annual reports
and disclosure documents.
General
Mineral Resources, Ore Reserve Estimates and Exploration Targets and Results are calculated in accordance
with the JORC Code. Investors outside Australia should note that while Ore Reserve and Mineral Resource
estimates of the Company in this announcement comply with the JORC Code (such JORC Code-compliant
Ore Reserves and Mineral Resources being "Ore Reserves" and "Mineral Resources" respectively), they may
not comply with the relevant guidelines in other countries. The JORC Code is an acceptable foreign code
under NI 43-101. Information contained in this release describing mineral deposits may not be comparable
to similar information made public by companies subject to the reporting and disclosure requirements of US
securities laws, including Item 1300 of Regulation S-K. All technical and scientific information in this release
has been prepared in accordance with the Canadian regulatory requirements set out in NI 43-101 and has
been reviewed on behalf of the Company by Qualified Persons, as set forth above.
This release contains references to estimates of Mineral Resources and Ore Reserves. The estimation of
Mineral Resources is inherently uncertain and involves subjective judgments about many relevant factors.
Mineral Resources that are not Ore Reserves do not have demonstrated economic viability. The accuracy of
any such estimates is a function of the quantity and quality of available data, and of the assumptions made
and judgments used in engineering and geological interpretation, which may prove to be unreliable and
depend, to a certain extent, upon the analysis of drilling results and statistical inferences that may ultimately
prove to be inaccurate. Mineral Resource estimates may require re-estimation based on, among other
things: (i) fluctuations in the price of gold; (ii) results of drilling; (iii) results of metallurgical testing, process
and other studies; (iv) changes to proposed mine plans; (v) the evaluation of mine plans subsequent to the
date of any estimates; and (vi) the possible failure to receive required permits, approvals and licenses.
2.9Mtpa Meekatharra Expansion Plan
25 August 2026
14
Forward Looking Statements
These materials prepared by Westgold Resources Limited include forward looking statements. Often, but not
always, forward looking statements can generally be identified by the use of forward looking words such as
“may”, “will”, “expect”, “intend”, “believe”, “forecast”, “predict”, “plan”, “estimate”, “anticipate”,
“continue”, and “guidance”, or other similar words and may include, without limitation, statements
regarding the Company’s 3YO, including estimates of gold production, grades, recoveries and its
expectations regarding AISC, the timing of updates to Mineral Resource estimates or Ore Reserves, plans,
strategies and objectives of management, anticipated production or construction commencement dates and
expected costs or production outputs.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors
that may cause the Company’s actual results, performance and achievements to differ materially from any
future results, performance or achievements. Relevant factors may include, but are not limited to, changes
in commodity prices, foreign exchange fluctuations and general economic conditions, increased costs and
demand for production inputs, the speculative nature of exploration and project development, including the
risks of obtaining necessary licenses and permits and diminishing quantities or grades of reserves, political
and social risks, changes to the regulatory framework within which the Company operates or may in the
future operate, environmental conditions including extreme weather conditions, recruitment and retention of
personnel, industrial relations issues and litigation.
Forward looking statements are based on the Company’s and its management’s good faith assumptions
relating to the financial, market, regulatory and other relevant environments that will exist and affect the
Company’s business and operations in the future. The Company does not give any assurance that the
assumptions on which forward looking statements are based will prove to be correct, or that the Company’s
business or operations will not be affected in any material manner by these or other factors not foreseen or
foreseeable by the Company or management or beyond the Company’s control.
Although the Company attempts and has attempted to identify factors that would cause actual actions,
events or results to differ materially from those disclosed in forward looking statements, there may be other
factors that could cause actual results, performance, achievements or events not to be as anticipated,
estimated or intended, and many events are beyond the reasonable control of the Company. In addition, the
Company’s actual results could differ materially from those anticipated in these forward looking statements
as a result of the factors outlined in the “Risk Factors” section of the Company’s continuous disclosure
filings available on SEDAR+ or the ASX, including, in the Company’s current annual report, half year report or
most recent management discussion and analysis.
Accordingly, readers are cautioned not to place undue reliance on forward looking statements. Forward
looking statements in these materials speak only at the date of issue. Subject to any continuing obligations
under applicable law or any relevant stock exc