Quarterly Activities Report
Released
Released
Announcement PDF
Highlights
Corporate
Quarterly Report
for the period ending 31 March 2017
•
Westgold group EBITDA for the quarter was $19.5 million (un-audited).
•
Significant share register changes occurred during the quarter with APAC reducing from 12.79% to 9.18%,
Jinchuan Group Limited reducing from 7.22% to 0% with new holders Van Eck GDXJ appearing at 10.98%
(9.83% after the end of the quarter) and JPMorgan Chase at 6.70%.
•
Westgold closed the quarter with cash, and net working capital of $76.2 million and no corporate debt.
•
Gold hedging at the end of the quarter stood at 134,266 ounces at A$1,651 per ounce. In addition, the gold
pre-pay (un-earned revenue) amortised to 7,500 ounces at A$1,550 per ounce.
•
A sale option and toll processing agreement was reached with RNC Minerals Ltd for the SKO operations.
•
Westgold’s new Director of Operations commenced work on 2 January 2017.
Gold Operations
•
The Gold Operations were hampered by weather disruptions impacting productivity and ore cartage
operations causing gold output to reduce 64,139 ounces produced (including Cannon) with 61,855 ounces
sold.
•
Group operating costs (C1) averaged A$1,104 per ounce and up slightly higher due to fixed costs spread
over lower output and additional remedial costs dealing with the effects of flooding. Group AISC averaged
A$1,250/oz per ounce for the quarter.
•
Westgold commenced its second underground mine at the CMGP with the Comet mine starting on
30/12/2016.
•
Significant capital expenditure occurred at the CMGP with further advance of capital mine development at
Paddy’s Flat, Comet and the dewatering of the Big Bell underground mine. In addition to waste cut-backs
on the Jack Ryan, Surprise and Mickey Doolan open pits.
•
Progress towards the completion of refurbishment of the Fortnum process plant was also hampered
by both electrical issues and wet weather impacting access. The plant is expected to commence wet
commissioning by the end of April 2017. Capital expenditure at Fortnum during the quarter was $11.73
million.
Exploration
•
At Higginsville exploration under lake sediments continued to return significant gold anomalies at the
Republican and Implausible prospects. RC drilling returned best results of 12m @ 7.71 g/t Au from 18m in
MITA150 and 5m @ 24.17g/t Au from 26m in MITA164 at the Mitchell prospects. Also 6m @ 3.7 g/t Au from
10m in MUSR180 and 10m @ 2.25g/t Au from 19m in MUSR219.
•
At SKO, drilling into HBJ deeps has returned some excellent results with the best being 31.73m @ 7.26 g/t
Au from 254m in HBJUG265 and 22.4m @ 7.79 g/t Au from 86m in HBJUG311.
Peter Cook
Steve Norregaard Rod Corps
Managing Director
Director of Operations
Manager – Investor Relations
peter.cook@westgold.com.au
steve.norregaard@westgold.com.au rod.corps@westgold.com.au
Westgold Resources Limited
ACN 009 260 306
t: +61 8 9462 3400 | e: reception@westgold.com.au | w: www.westgold.com.au
PO Box 1353 West Perth WA 6872 | Level 3, 18-32 Parliament Place, West Perth WA 6005
Gold Operations
Overview
Total gold production for the quarter was 64,139 ounces of which 17,898 ounces was attributable to Cannon
where Westgold has a 50% profit share. Cash operating costs (C1) averaged A$1,104 per ounce (C2 – including
royalties averaging $1,182 per ounce). All-in sustaining costs estimates (AISC) across the group averaged
A$1,250 per ounce.
Quarterly Gold Prod'n and A$ Costs
80,000
1400
70,000
1200
1000
50,000
800
40,000
600
30,000
400
20,000
200
10,000
0
Cost Per Oz
Qtr Prod'n Oz
60,000
Jun Q 2016
Sep Q 2016
Dec Q 2016
Mar Q 2017
Gold Prod'n
54,282
65,267
75,134
64,139
Cash Cost/oz
1041
1031
981
1104
AISC/oz
1237
1192
1149
1250
Gold Prod'n
Cash Cost/oz
0
AISC/oz
Overall performance for the gold group was hampered by the impacts of numerous bouts of adverse weather
and flooding which broke the run of four consecutive quarter or quarter increases in gold output. Group gold
production was down 15% on the previous quarter and group annual guidance for Calendar 2017 has been
revised to 340,000 ounces. The CMGP continued its ramp-up during the quarter with significant investment
in future growth projects. SKO benefited from Cannon ore dominating the plant capacity. Safety stats for the
Gold Division for the quarter are summarised below:
Site
LTI
LTIFR
TRIFR
Higginsville
0
0
67.33
South Kal
0
4.43
85.57
CMGP
0
0.88
91.89
Fortnum
0
10.95
87.61
31 March 2017 Quarterly Report
Page 2
Physical and financial outputs for the Gold Division are summarised below:
HGO
SKO
Cannon*
(profit
share)
CMGP
FGP
Group
Qtr Total
Physical Summary
Units
ROM - UG Ore Mined
t
-
52,547
-
116,962
-
169,509
UG Grade Mined (Inc. LG)
g/t
-
3.37
-
3.55
-
3.49
ROM - OP BCM Mined
BCM
711,011
18,220
110,758
919,654
-
1,759,643
OP Ore Mined
t
228,129
19,139
97,106
54,861
-
399,235
OP Grade Mined
g/t
1.84
2.77
3.26
2.06
-
2.26
All Ores Processed
t
286,539
94,600
177,082
382,042
-
940,263
Head Grade
g/t
1.89
2.82
3.47
2.20
-
2.41
Recovery
%
87.62%
89.16%
90.54%
86.57%
-
87.90%
Gold Produced
oz
15,267
7,646
17,898
23,328
-
64,139
Gold Sold
oz
16,424
9,581
14,262
21,588
-
61,855
Achieved Gold Price
A$/oz
1,620
1,628
1,598
1,615
-
1,613
Mining
A$/oz
547
1,071
265
813
-
628
Processing
A$/oz
562
69**
246
365
-
343
Admin
A$/oz
139
37
47
162
-
110
Stockpile Adj
A$/oz
169
72
-
(71)
-
23
C1 Cash Cost (produced oz)
A$/oz
1,418
1,248
558
1,270
-
1,104
Royalties
A$/oz
100
43
28
96
-
72
Marketing/Cost of sales
A$/oz
2
3
-
1
-
1
Sustaining Capital
A$/oz
(1)
270
-
99
-
68
Corporate Costs/Reclam.,
etc
A$/oz
7
14
-
5
-
5
All-in Sustaining Costs
A$/oz
1,525
1,578
586
1,471
-
1,250
Project Startup Capital
A$’M
$0.44
$2.05
-
$14.34
$11.73
$28.56
Exploration & Holding Cost
A$/oz
83
76
-
111
-
69
Depreciation & Amortisation
A$/oz
257
500
-
299
-
229
Cost Summary
* Westgold has a 50% profit share from cash surplus generated from Cannon Pit. Note: Financials are un-audited numbers.
** South Kal processing cost are net of toll processing credits.
Year-to-date (2016-2017) physical and financial outputs for the Gold Division are summarised below:
31 March 2017 Quarterly Report
Page 3
HGO
SKO
Cannon*
(profit
share)
CMGP
FGP
Group
Qtr Total
Physical Summary
Units
ROM - UG Ore Mined
t
300,925
193,252
-
332,362
-
826,539
UG Grade Mined (Inc. LG)
g/t
3.99
2.81
-
3.44
-
3.49
ROM - OP BCM Mined
BCM
1,929,110
602,135
1,028,113
3,580,760
-
7,140,117
OP Ore Mined
t
496,096
107,227
366,652
581,988
-
1,551,963
OP Grade Mined
g/t
2.15
2.72
3.20
1.85
-
2.32
All Ores Processed
t
896,582
360,001
391,462
1,200,666
-
2,848,711
Head Grade
g/t
2.58
2.59
3.16
2.17
-
2.49
Recovery
%
91.51%
90.09%
90.78%
87.24%
-
89.43%
Gold Produced
oz
68,387
27,127
36,143
72,879
-
204,537
Gold Sold
oz
67,092
28,219
34,952
71,196
-
201,459
Achieved Gold Price
A$/oz
1,651
1,666
1580
1,653
-
1,641
Mining
A$/oz
603
1,070
357
765
-
679
Processing
A$/oz
334
89**
269
327
-
288
Admin
A$/oz
104
45
51
157
-
105
Stockpile Adj
A$/oz
(23)
106
-
(88)
-
(25)
C1 Cash Cost (produced oz)
A$/oz
1,019
1331
678
1,160
-
1,047
Royalties
A$/oz
141
44
34
87
-
90
Marketing/Cost of sales
A$/oz
2
2
-
2
-
1
Sustaining Capital
A$/oz
30
201
-
75
-
64
Corporate Costs/Reclam.,
etc
A$/oz
7
17
-
3
-
6
All-in Sustaining Costs
A$/oz
1,198
1,572
711
1,328
-
1,208
Project Startup Capital
A$’M
$3.59
$8.0
-
$34.92
$17.16
$63.67
Exploration & Holding Cost
A$/oz
64
114
-
112
-
77
Depreciation & Amortisation
A$/oz
333
419
-
263
-
261
Cost Summary
31 March 2017 Quarterly Report
Page 4
Central Murchison Gold Project (CMGP)
The CMGP is the largest of Westgold’s four key gold projects with a total mineral resource of 7.74 million
ounces (108.7 million tonnes at 2.21 g/t Au). Total mining reserves currently stand at 1.92 million ounces (22.8
million tonnes at 2.63 g/t Au) – refer to ASX announcement of 18 August 2016 for detail.
Considering the 10yr + initial mine life, the short-term objective of the CMGP was to re-establish gold
production from a series of open pit sources whilst it progressively re-established four key underground
mines, which when operational would become the long-term feedstock for the project.
The first of these underground mines, Paddy’s Flat is now in a steady-state and produced 111,433 tonnes at
3.52 g/t Au during the quarter and 332,843 tonnes at 3.44 g/t Au for the year to date. Significantly, development
has advanced to the stage where an ongoing supply of bulk tonnage stopes on the Prohibition lodes are able
to be mined, including the crown pillar which saw ore production in March 2017 increase to 55,507 tonnes at
3.52 g/t Au and put the mine well on track for its annual budget contribution of 500,000 tonnes at 3.5 g/t Au.
The second underground mine at CMGP, the Comet Mine commenced late in the December quarter with the
portal being established. Some 1,050 metres of decline and level advance was achieved during the quarter
including 429 metres of lode development yielding 18,651 tonnes at a grade of 3.94 g/t Au. So far development
has shown the ore to be slightly better than expectations with the mine plan being to complete another of full
quarter of ore development prior to ore stoping commencing. Comet is a smaller mine which is contemplated
to provide an output bridge whilst the large bulk tonnage Big Bell mine ramps up to full production. Comet
has a mining reserve of 165,547 ounces (1.5 million tonnes at 3.43 g/t Au) and is expected to produce at
approximately 360,000 tonnes per annum.
Dewatering of the Big Bell mine continued to advance with initial exposure to the upper part of the decline
now well exposed. Access back into the underground for refurbishment is expected to be regained in the
second half of calendar 2017.
The re-establishment of production from the Big Bell mine will be the catalyst for a major step up in output
for the CMGP with the mine planned to produce approximately 1 million tonnes at 3.5 g/t Au and over 100,000
ounces per annum at steady-state in its own right.
Open pit mining continues to be the main source of ore feed and is progressively being replaced by higher
grade underground sources. Open pit mining is currently taking place in the Jack Ryan, Surprise and Mickey
Doolan open pits with waste stripping also commencing in the Cullculli Open pit. In all pits, significant waste
stripping to expose ore was completed during the quarter. In the previous quarter, open pit mining was
hampered by slope stability hindrances in shallow oxide zones resulting in additional minor cut-backs to be
endured. This was exacerbated during the current quarter by heavy rains and local flooding impacting the
access to pits for remedial works. As a consequence, open pit production was well below quarterly target at
54,861 tones at 2.06 g/t Au taking the open pit year total to 581,988 tonnes at 1.85 g/t Au. These productivity
impacts also had a negative impact on efficiency and in turn unit costs as the large proportion of fixed costs
were spread over fewer ounces mined. This situation is short term with a turn around in the ensuing quarter
contemplated.
Overall the CMGP Cash operating costs (C1) increased by 17% over the previous quarter to A$1,270 per ounce
and the YTD total to A $1,160 per ounce. Similarly, the impacts increased AISC estimates for the quarter
increased by 14% to $1,471 per ounce and the YTD total to A$1,328 per ounce.
31 March 2017 Quarterly Report
Page 5
CMGP Gold Production & A$ Costs
1600
30,000
1400
1200
20,000
1000
800
15,000
600
10,000
COST PER OZ
QTR GOLD PROD'N OZ
25,000
400
5,000
0
200
Jun Q 2016
Sep Q 2016
CMGP Gold Prod'n
Dec Q 2016
CMGP Cash Cost/oz
Mar Q 2017
0
CMGP AISC/oz
CMGP Exploration and Development
In the Central Murchison, Prohibition has once again provided some very significant intersections from
drilling this quarter. Results such as 35.6 m at 4.62 g/t Au from 26 m in 17PRDD046 and 32.7 m at 4.44 g/t
Au from 108 m in 17PRDD058A demonstrate the immense potential of this system having never been mined
in a significant underground context. Pleasingly the zones that have produced these intersections are setdown for near-term production, with 17PRDD058A sitting within the 1280 Level stoping horizon, and the area
defined by 17PRDD046 featuring in the Prohibition Crown Pillar extraction sequence, which will be mined
over the forthcoming quarter.
Additionally, the Vivian - Consol’s section of the Paddy’s Flat mine continues to produce some outstanding
exploration results. Examples such as 5.43 m at 25.7 g/t Au from 28 m in 17VIDD034 targeting the alteration
halo around the historic Consol’s stopes shows the immense near-term potential of extracting the remnant
mineralisation adjacent to these historic production sources. More significantly, underground development
will soon be in a position where effective drill testing of virgin mineralisation below the lowest levels of the
historic Consol’s mine will be possible. The Company is of the strong view that this work will have significant
benefits for the long-term future of the Central Murchison Project’s flagship mine.
On the project development front, a drill program testing the northern plunge extension of the Jack Ryan
mineralisation was completed this quarter. This program assessed the potential of Jack Ryan to support a
small-scale underground operation upon completion of open pit mining. Results such as 37 m at 2.41 g/t Au
from 185 m in 17JRRC002 and 30 m at 2.41 g/t Au from 183 m in 17JRRC003 demonstrate the robustness of
the mineralised zone, with preliminary underground design work to be undertaken during the forthcoming
quarter.
31 March 2017 Quarterly Report
Page 6
Higginsville Gold Operations (HGO)
Following the completion of the Trident Underground Mine in the previous quarter Higginsville had its first
quarter without contribution from higher grade underground ores. The change in ore feeds has proved more
challenging than expected. Different ore characteristics impacted crusher and screen throughputs and
additional down-time on the crushing circuit during the quarter reduced average throughput and productivity.
Remedial and temporary portable crushing introduced to counter this negatively impacted cost. Significant
maintenance works have since corrected the circuit. Weather issues and delays in ore cartage on dirt roads
added to the problem with the combined impacts causing lower gold production.
Quarterly gold production for HGO was 15,267 ounces. Cash costs (C1) were higer at $1,418 per ounce and
AISC were $1,525 per ounce.
Mining will continue from Mt Henry and Fairplay open pits during the ensuing quarter with significantly lower
costs and higher output expected with the issues that plagued the current quarter being resolved.
HGO Gold Prod'n & A$ Costs
1800
30,000
1600
25,000
1200
20,000
1000
15,000
800
10,000
COST PER OZ
QTR GOLD PROD'N OZ
1400
600
400
5,000
200
0
Jun Q 2016
Sep Q 2016
HGO Gold Prod'n
Dec Q 2016
HGO Cash Cost/oz
Mar Q 2017
0
HGO AISC/oz
Higginsville Exploration & Development
The major focus of drilling operations at Higginsville this quarter has been a substantial campaign of grade
control work at Mount Henry in support of the next phase of open pit expansion along the 4 km strike length
of this very significant resource. Consequently resource development and exploration actives have been
temporarily scaled back, with development works being restricted to the Mitchell series of palaeochannel
deposits and the Musket prospect to the east of the process plant.
A series of new pits and existing pit cut-backs are planned for the next financial year at Mitchell. These open
pit operations will supplement feed to the Higginsville mill from the Mount Henry mining centre. To support
the Mitchell pits start-up, a series of infill, validation and extensional drilling programs are in progress. To
date the Company has been very pleased with the results returned which include 9 m at 3.23 g/t Au from 33 m
in MITA0129, 12 m at 7.71 g/t Au from 18 m in MITA0150 and 5 m at 24.17 g/t Au from 26 m in MITA0164.
These results are providing significant encouragement that the Mitchell deposits will underpin a low-cost
mining centre in close proximity to the Higginsville Processing plant.
Further drilling at Musket advanced that prospect toward mining studies with best intercepts being 6 m @ 3.7
g/t Au from 10 m in MUSR180 and 10 m @ 2.25 g/t Au from 19 m in MUSR219.
31 March 2017 Quarterly Report
Page 7
South Kalgoorlie Operations (SKO)
Mining at South Kalgoorlie continued with the majority of plant processing capacity applied to the Cannon
Project where Westgold has a 50% profit share arrangement. Whilst this provided some capacity for owner
ores from HBJ and Georges Reward to be processed, there remained a process of stock-building at the mine
from most sources.
Total output for the SKO plant increased to 25,544 ounces. Directly attributable processing for the quarter
was 94,600 tonnes at 2.82 g/t Au at 89.16% recovery to yield 7,646 ounces. An additional 177,082 tonnes at
3.47 g/t Au at 90.54 % recovery for 17,898 ounces produced came from the Cannon mine.
Underground production from HBJ was impacted by flooding in the lower levels during the quarter which
slowed the commencement of production from new stoping areas and development into the deeper virgin
lodes. Mine output for the quarter was 52,547 tonnes at 3.37 g/t with the grade increase reflecting the
dominance of ore sourced from development with a lesser amount of ore coming from stoping operations.
Open pit mining at the wholly owned Georges Reward Pit at Bulong had production of 19,139 tonnes at 2.77
g/t Au sourced from the final benches of the pit.
On a consolidated output basis (applying only the 50% profit share interest from Cannon) the overall financial
performance for SKO was 25,544 ounces at cash operating costs of A$765 per ounce of gold produced with
AISC were estimated at A$883 per ounce for the quarter. YTD output increased to 63,270 ounces with the
project on track to deliver its planned 80,000 ounces output for the financial year.
SKO Gold Prod'n & A$ Costs
1400
30,000
1200
1000
20,000
800
15,000
600
10,000
400
5,000
0
COST Per oz
QTR Gold Prod'n OZ
25,000
200
Jun Q 2016
Sep Q 2016
Gold Prod'n
Dec Q 2016
Cash Cost/oz
Mar Q 2017
0
AISC/oz
SKO – Exploration & Development
At South Kalgoorlie the exploration team has moved to rapidly exploit last quarter’s successful conceptual
exploration discovery at Rinjani along the Zuleika shear zone, as it extends south into Westgold’s tenure from
the prolific Kundana gold camp. Infill drilling within the currently defined footprint of the Rinjani mineralisation
has been undertaken, with a maiden resource in the process of being calculated. It is expected that initial pit
design and permitting work will occur during the ensuing quarter to allow explioitation of an initial Rinjani
open pit into the SKO surface mining program early in the coming financial year.
At the HBJ underground mine some very significant intersections on a gram metre basis have been returned
this quarter from areas ahead of the mining front. Results such as 31.73 m at 7.26 g/t Au from 254 m in
HBJUG0265 (Jubilee D Block), 41.5 m at 2.35 g/t Au from 67 m in HBJUG0291 (COZ B Block) and 22.4 m at
7.79 g/t Au from 86 m in HBJUG0311 (SOZ C Block) demonstrate the immense scale of this resource, with
HBJUG0311 being of particular interest as it falls within the 1850 level stoping horizon which is destined for
extraction in the near term.
31 March 2017 Quarterly Report
Page 8
Cannon Gold Mine (WGX 50% Profit Share)
Westgold has a financing and profit sharing agreement with Southern Gold Limited over the Cannon Mine
at Bulong in Western Australia. Pursuant to this agreement, Westgold manages all technical aspects of the
mining operation as well as funding all costs involved with the operation of the mine.
Open pit mining was completed at Cannon after both heavy rains and slope stability in the hangingwall
ultramafic units brought mining to halt earlier than anticipated. The final high grade blocks within the pit are
planned to be extracted by a temporary underground ramp access. Further evaluation and negotiations on
more extensive underground mining of underground ore positions within the combined Cannon and Georges
Reward zones are planned.
Fortnum Gold Project (FGP)
Works on the refurbishment of the Fortnum plant made significant progress with dry commissioning of the
front end of the plant being completed subsequent to the end of the quarter.
A detailed assessment of the electrical switchgear in the plant that controls the main milling processes has
showed that the area was high risk and capable of impacting long-term operations. A decision was made to
completely replace the majority of this aged equipment which has led to a delay to completion and ultimate
wet commissioning. It is now expected that the process plant will commence commissioning late in April.
During the quarter start-up capital of $11.73 million was spent taking the total to date $17.16 million.
Engineering costs for plant refurbishment will end up slightly above budget, however significant progress has
been made on the dewatering of the Starlight Underground mine allowing for a potential earlier commencement
and site accommodation capacity has been expanded and upgraded significantly in anticipation of this.
Open pit mining commenced subsequent to the end of the quarter with first ores planned from the Tom’s Pit.
A larger open pit contract for three years of open pit ore feed is planned to be awarded for a start of mining
in June 2017 quarter.
Ore processing will commence on low grade stockpiles which will be progressively replaced by higher grade
ores from open pit and then with underground ores early in 2018. Guidance for the remainder of the calendar
year has been revised to 37,000 ounces.
Fortnum Exploration & Development
In parallel with mill commissioning works and geological preparation for the commencement of open pit
mining operations at the Company’s newest gold project, resource development activities have continued
during the quarter at the Fortnum Gold Project.
This resource development work has been focussed at the Horseshoe mining centre, which is approximately
30km south east ofthe refurbished Fortnum processing plant. This work has consisted predominately of
resource validation and extensional drilling withbetter results including 18.3 m at 2.95 g/t Au from 177 m in
MXD0011 at Cassidy, along with 9.5 m at 2.76 g/t Au from 154.5 m in MXD0021 and 2.8 m at 10.23 g/t Au from
169 m in MXD0021 at Horseshoe.
These results will be incorporated into an updated resource and reserve model and mine design during the
ensuing quarter.
Rover Project
No on ground exploration work was conducted in the Northern Territory during the quarter.
31 March 2017 Quarterly Report
Page 9
Corporate
Westgold closed the quarter with cash, and working capital of A$ 76.2 million.
The following waterfall chart shows cash movements during the quarter:
Quarter Cash Movement
200
180
160
140
120
100
80
60
40
20
-
Opening Cash & WC
Revenue
Cash costs
Capital re-investment &
exploration
Corporate
Closing Cash & WC
Corporate Structure
Westgold has the following Corporate Structure:
•
304,671,487 Fully Paid Ordinary Shares.
•
11,000,000 Employee options convertible at $2.02 per share (after vesting conditions).
Gold Hedging
Gold hedging at the end of the quarter stood at 134,266 ounces at an average price of A$1,651 per ounce. Predeliveries into hedges have occurred in a strategy to maximise sales prices at all times. In addition, Westgold
has 7,500 ounces remaining in its Gold Pre-pay arrangement which sits as un-earned income on the balance
sheet and is repaid at 1,250 ounces per month with pre-pay settled at $A1,550/oz.
31 March 2017 Quarterly Report
Page 10
CENTRAL MURCHISON GOLD PROJECT
UNDERGROUND DRILLING RESULTS
Lode
Fatts
Hole
Intercept N
Intercept E
Intercept
RL
Intercept (Downhole)
From
(m)
Dip
Azi
16VIDD218
7,056,121
650,030
331
0.8m at 7.92g/t Au
12
2
99
16VIDD222
7,056,121
650,030
330
19m at 1.84g/t Au
127
-1
150
34.89m at 2.31g/t Au
149
6m at 1.46g/t Au
270
9m at 3.96g/t Au
4
-4
140
46m at 2.83g/t Au
112
3m at 2.09g/t Au
53
5
106
2m at 26.92g/t Au
60
4m at 8.1g/t Au
62
7
93
4.5m at 1.93g/t Au
176
16VIDD223
Mudlode
17VIDD038
17VIDD040
Prohibition
7,056,120
7,056,461
7,056,459
650,029
650,305
650,305
330
324
324
17VIDD041
7,056,459
650,305
324
13m at 3.8g/t Au
104
7
82
16PRDD175
7,056,395
649,991
312
38m at 2.16g/t Au
108
-4
300
16PRDD234
7,056,396
649,991
312
4m at 4.44g/t Au
123
9
284
17.16m at 3.32g/t Au
130
16PRDD235
7,056,396
649,991
312
35m at 3.94g/t Au
114
9
293
17PRDD036
7,056,396
649,991
312
2m at 3.32g/t Au
115
-7
271
3m at 9.4g/t Au
120
3m at 3.73g/t Au
128
2.07m at 13.05g/t Au
136
4.51m at 3.36g/t Au
144
13m at 4.66g/t Au
153
17PRDD045
7,056,434
649,909
334
20.6m at 2.5g/t Au
35
18
290
17PRDD046
7,056,452
649,916
334
35.6m at 4.62g/t Au
26
19
288
17PRDD047A
7,056,459
649,918
334
6.1m at 2.53g/t Au
19
16
292
7,056,459
649,918
334
4.5m at 3.36g/t Au
29
7,056,459
649,918
334
29.5m at 3.23g/t Au
37
7,056,484
649,931
334
1.95m at 3.45g/t Au
38
16
288
7,056,484
649,931
334
22.75m at 2.07g/t Au
54
7,056,492
649,938
335
16m at 2.91g/t Au
33
19
288
7,056,492
649,938
335
11.5m at 2.81g/t Au
55
7,056,512
649,946
335
14.2m at 2.48g/t Au
74
20
288
7,056,512
649,946
335
8.1m at 2.15g/t Au
32
7,056,512
649,946
335
5.3m at 3.15g/t Au
47
17PRDD048
17PRDD049
17PRDD051
31 March 2017 Quarterly Report - Appendices
Page i
CENTRAL MURCHISON GOLD PROJECT (CONTINUED)
UNDERGROUND DRILLING RESULTS
Lode
Hole
Intercept N
Intercept E
Intercept
RL
Intercept (Downhole)
From
(m)
Prohibition
17PRDD051
7,056,512
649,946
335
16.2m at 4.83g/t Au
59
17PRDD052
7,056,520
649,950
335
9m at 2.22g/t Au
82
7,056,520
649,950
335
3m at 2.9g/t Au
34
7,056,520
649,950
335
5m at 2.17g/t Au
49
7,056,520
649,950
335
18.1m at 3.39g/t Au
60
7,056,520
649,950
335
4.5m at 2.72g/t Au
81
7,056,550
649,933
335
10.08m at 5g/t Au
0
7,056,550
649,933
335
8.15m at 1.52g/t Au
17
7,056,397
649,991
311
5m at 4.73g/t Au
109
7,056,397
649,991
311
1m at 6.3g/t Au
128
7,056,397
649,991
311
5m at 2.62g/t Au
154
17PRDD058A
7,056,397
649,991
311
32.7m at 4.44g/t Au
17PRDD059
7,056,397
649,991
312
17PRDD060
7,056,397
649,991
7,056,397
Dip
Azi
21
288
17
288
-18
271
108
-16
286
18.3m at 3.06g/t Au
104
-19
300
312
6.5m at 1.15g/t Au
105
-17
318
649,991
312
4m at 1.32g/t Au
114
7,056,397
649,991
312
12.6m at 1.82g/t Au
105
-23
309
7,056,397
649,991
312
1.3m at 7.47g/t Au
133
17PRDD062
7,056,397
649,991
311
3.9m at 2.3g/t Au
104
-28
302
17PRDD063
7,056,397
649,991
311
6.1m at 2.6g/t Au
133
-29
289
17PRDD064
7,056,396
649,991
312
9.8m at 3.25g/t Au
105
-8
278
7,056,396
649,991
312
9.3m at 2.03g/t Au
124
7,056,396
649,991
312
3.1m at 5.37g/t Au
136
17PRDD065
7,056,396
649,991
311
12m at 5.97g/t Au
114
-23
283
17PRDD066
7,056,397
649,991
312
7m at 6.43g/t Au
101
-9
292
7,056,397
649,991
312
21m at 4.44g/t Au
111
7,056,397
649,991
312
11m at 8.7g/t Au
135
17PRDD068
7,056,397
649,991
311
18m at 2.02g/t Au
99
-22
325
17PRDD069
7,056,397
649,991
311
13.4m at 1.72g/t Au
114
-6
332
7,056,397
649,991
311
15.8m at 1.65g/t Au
131
17PRDD237
7,056,395
649,991
312
13m at 2.64g/t Au
107
-23
318
17PRDD238
7,056,395
649,991
312
1.7m at 4.03g/t Au
109
-14
309
7,056,395
649,991
312
6m at 4.15g/t Au
115
17PRDD053
17PRDD057
17PRDD061
31 March 2017 Quarterly Report - Appendices
Page ii
CENTRAL MURCHISON GOLD PROJECT (CONTINUED)
UNDERGROUND DRILLING RESULTS
Lode
Vivian Consol's
Hole
Intercept N
Intercept E
Intercept
RL
Intercept (Downhole)
From
(m)
Dip
Azi
17VIDD001
7,056,055
649,888
402
8.45m at 3.11g/t Au
27
-13
108
17VIDD002
7,056,055
649,888
401
8.5m at 1.6g/t Au
35
-25
108
17VIDD004
7,056,055
649,888
401
0.45m at 47.52g/t Au
61
-40
108
17VIDD006
7,056,045
649,884
401
1.68m at 39.73g/t Au
37
-29
108
7,056,045
649,884
401
0.68m at 91.56g/t Au
38
7,056,045
649,884
401
1.27m at 63.77g/t Au
46
7,056,045
649,884
401
0.77m at 104.5g/t Au
46
7,056,045
649,884
401
7m at 1.2g/t Au
59
-46
108
7,056,045
649,884
401
3m at 1.96g/t Au
73
7,056,000
649,877
402
0.6m at 36.7g/t Au
53
-48
108
7,056,000
649,877
402
5.1m at 10.77g/t Au
62
17VIDD017
7,055,984
649,860
405
3m at 1.9g/t Au
24
34
90
17VIDD021
7,055,971
649,854
403
3.1m at 27.37g/t Au
23
-5
121
17VIDD022
7,055,971
649,854
402
13m at 4.32g/t Au
32
-37
121
17VIDD025
7,055,953
649,843
402
0.8m at 68.77g/t Au
45
-40
117
7,055,953
649,843
402
0.6m at 90.98g/t Au
45
17VIDD026
7,055,943
649,837
406
2.9m at 2.49g/t Au
27
54
116
17VIDD028
7,055,942
649,837
402
5.1m at 1.68g/t Au
33
-36
116
17VIDD029
7,055,919
649,825
407
11.4m at 1.95g/t Au
21
64
118
17VIDD031
7,055,918
649,825
404
9.9m at 4.45g/t Au
22
-38
118
17VIDD034
7,055,900
649,815
403
5.43m at 25.7g/t Au
28
-36
119
7,055,900
649,815
403
1m at 101.5g/t Au
28
7,055,900
649,815
403
0.38m at 82.4g/t Au
31
Share your feedback