June 2025 Quarterly Results
Released
Released
Announcement PDF
June 2025 Quarterly Report
23 July 2025
ASX Release
$132M Treasury Build in Q4 FY25
Westgold is a leading, unhedged
ASX200 gold producer, committed to
unearthing enduring value for all its
stakeholders.
Perth, Western Australia, 23 July 2025 Westgold Resources
Limited (ASX | TSX: WGX - Westgold or the Company) is
pleased to report results for the period ending 30 June 2025
(Q4 FY25).
Westgold’s vision is to become the
Australian gold company of choice,
sustaining safe, responsible and
profitable production.
Our current business encompasses
mines and processing plants across
the
Murchison
and
Southern
Goldfields, two of Western Australia’s
most prolific gold-producing regions.
HIGHLIGHTS
OPERATIONS
Safety Performance Total Recordable Injury Frequency Rate
(TRIFR) of 5.67 / million hours – an improvement of ~10%
Record Group quarterly gold production of 88,022oz Au @ AISC
of $2,688/oz
Record Group full year gold production of 326,384oz @ AISC of
$2,666/oz - marginally outside FY25 guidance of 330-350,000oz
@ AISC of A$2,400 - 2,600/oz
Mine productivity and milling output lifts across the Group
Mining commenced in Great Fingall Flats
RESERVES & RESOURCES
Maiden Mineral Resource for Fletcher Zone at Beta Hunt of
2.3Moz – from 1km of 2km strike
EXPLORATION
$9M invested during the quarter - refer to the June 2025 Quarterly
Exploration Results for details
FINANCE
Gold sales of 71,500oz at an average price of A$5,174/oz generating revenue of A$370M
$364M in closing cash, bullion, and liquid investments @ 30
June 2025 - a record $132M increase Q on Q
Financial values are reported in A$ unless
otherwise specified
This announcement is authorised for
release to the ASX by the Board.
Investor Relations
Kasun Liyanaarachchi
Group Manager IR & Communications
investor.relations@westgold.com.au
+61 458 564 483
Westgold Resources Limited
ASX: WGX | TSX: WGX
ABN 60 009 260 306
CORPORATE
Ivan Mullany joins the board as Non-Executive Director
Barminco awarded a 3-year contract for the Great Fingall mine –
mining in virgin high group stopes to commence Q1, FY26
Westgold remains 100% unhedged
FY26 Guidance will be released to the market in August - with 3year outlook in September, post Resource/Reserve Update
westgold.com.au
T: +61 8 9462 3400
E: perth.reception@westgold.com.au
Level 6, 200 St Georges Terrace
Perth WA 6000 / PO Box 7068
Cloisters Square WA 6850
Westgold Managing Director and CEO Wayne Bramwell commented:
“Westgold’s Q4, FY25 results of 88koz of production and $132M in treasury build were Group records. These
results propelled the Group to a full year production record of 326,384oz (at AISC of $2,666oz) and closing cash,
bullion and liquid investments of $364M - demonstrating the growing free cash flow capability of our business.
Investment in resource drilling, mine infrastructure and fleet replacement lifted the business during Q4, FY25,
with mine productivity and milling throughputs across all our operations improving quarter on quarter. Trucking
availability at Beta Hunt and development delays at Bluebird-South Junction impacted delivery of the full year
target but, Group production of 34koz in June shows what this portfolio can deliver when our mines perform.
Mine output at our larger assets continue to improve. At Bluebird-South Junction, Westgold fired the first large
South Junction stopes and now has a mine design that, though slower to implement in the short term,
establishes higher outputs and future proofs this multi-decade asset. At Beta Hunt, substantial progress was
made on mine infrastructure projects that will enable higher productivity whilst at Big Bell, the Upper Cave
continues to deliver increasing tonnages.
Our smaller mines continue to play a key supporting role, with our Starlight mine outperforming yet again. The
Two Boys mine at Higginsville, a small underground mine which at the start of the year had little future, needed
just a single diamond drill to start to define mine life extensions, lift mine grade and its outputs.
Alongside stellar drilling results detailed in our June 2025 Quarterly Exploration results, another milestone for
Westgold this quarter was the announcement of a maiden Mineral Resource Estimate of 2.3Moz from the
Fletcher Zone at Beta Hunt. This result, achieved from just 1km of the known 2km strike, validates our view of
the potential upside in Beta Hunt and signals the beginning of a multi-decade growth journey for the Fletcher
Zone.
FY25 was transformational for Westgold. The business has growing scale and with our capital investments
lifting productivity, in FY26 we now have a portfolio we can leverage for enhanced cashflows.”
Photo 1: Hole 25BLDD001 (Polar Star lodes, Bluebird – South Junction mine)
June 2025 Quarterly Report
2
Executive Summary
Cash Position as of 30 June 2025
Westgold closed Q4, FY25 with cash, bullion and liquid investments of $364M – representing a build of $132M
in total cash, bullion and liquid investments (after investing $39M on capital and $9M on exploration, refer
Figure 1).
This result was driven by record Group gold production, an increase in realised gold price to $5,174/oz and the
second payment of $20M from the recently announced divestment of the non-core Lakewood Mill1.
364
28
(10)
(27)
96
(9)
(7)
240
(22)
232
(10)
89
28
Closing
Cash, Bullion &
Investments
Closing Investments
Closing Bullion
Closing Cash
Lease Payments
Working Capital
Working Capital
Stockpiles
Exploration
PP&E
Capital Expenditure
Sustaining Capital
Southern Goldfields
Operating Cashflow
Murchison
Operating Cash Flow
Opening Cash
Opening Investments
Opening Bullion
Operating
Opening
Cash, Bullion &
Investments
20
179
Growth Capital
25
220
Staged proceeds
from Lakewood sale
(12)
Closing Operating Cash
49
Figure 1: Cash, Bullion, and Liquid Investments Movement (A$M) – Q4 FY25
Notes
Westgold remains unhedged and fully exposed to the spot gold price.
Second cash payment of $20M relating to the Lakewood Sale received in the quarter. Remaining cash
payment of $25M is due to be received in November 2025.
Closing investments include 1.6B shares held in New Murchison Gold (ASX: NMG) but exclude 19.8M
shares received in Blackcat Syndicate Limited scrip during the quarter (as the BC8 scrip has a 12-month
escrow period.)
1
Refer to ASX release titled “Black Cat Acquires Lakewood Mill for $85M”- 25 February 2025
June 2025 Quarterly Report
3
Group Production Highlights
In FY25, Westgold produced a Group record annual production of 326,384oz at an AISC of $2,666/oz. The
result was marginally outside FY25 Production Guidance of 330-350koz and All-In Sustaining Cost Guidance of
$2,400 - $2,600/oz 2.
In Q4 FY25, Westgold also achieved a Group record quarterly production of 88,022oz (Q3 FY25: 80,107oz).
The increase in production came from the Murchison hubs with 54,811oz were produced (Q3 FY25: 42,906oz),
with this lift attributed to the access to higher grade stopes at Bluebird-South Junction and the Galaxy lodes at
Starlight. The Southern Goldfields produced 33,211oz (Q3 FY25: 37,201oz), with the quarter-on-quarter
reduction attributable to intermittent issues associated with the load and haul fleet at Beta Hunt.
These issues saw ~4koz of production delayed with the expectation these ounces will be mined in FY26.
While mining rates at Bluebird-South Junction improved quarter on quarter, access to South Junction was
further delayed until a full mine redesign was completed in April 2025, increasing the reliance on low grade
processing to maintain consistent mill feed to the Meekatharra hub. In combination with the load and haul fleet
issues at Beta Hunt, these factors contributed to the minor deviance from the Company’s FY25 guidance range.
All-In Sustaining Cost (AISC) for Q4, FY25 was $237M (Q3 FY25: $227M), and on a per ounce basis was
$2,688/oz (Q3 FY25: $2,829/oz), as a result of increased mining activity and gold production in Q4 across the
group.
77,369
80,886
24,480
34,425
37,201
52,889
46,461
42,906
Q4 FY24
Q1 FY25
Q2 FY25
Q3 FY25
3,493
3,723
2,422
4,066
2,703
52,795
2,041
187
219
80,107
4,630
88,022
33,211
Southern Gold Fields
Murchison
54,811
Q4 FY25
5,174
2,829
2,688
227
237
Achieved gold price ($/oz)
AISC ($/oz)
AISC ($M)
108
Q4 FY24
Gold production (oz)
Q1 FY25
Q2 FY25
Q3 FY25
Q4 FY25
1
Figure 2: Westgold Quarterly Production (oz), Achieved Gold Price and AISC ($/oz)
2
Refer to ASX release titled “FY25 Guidance Updated” - 3 February 2025
June 2025 Quarterly Report
4
110
100
90
3,149
3,148
120
2,619
2,309
2,490
2,209
2,643
2,342 2,370
2,800
2,633
88
1,983
70
2,622
2,542 2,561
3,000
2,754
2,198
2,230
80
2,796 2,791
70
1,842
74
75
75
69
71
76
2,355
82
80
2,200
2,000
0
48
50
40
45
-200
50
42
38
35
35
38
-400
43
-600
-800
30
0
2,400
1,800
67
60
40
2,600
-1,000
Oct
23
Nov Dec
23
23
Jan
24
Feb
24
Mar
24
Apr
24
May
24
Jun
24
Jul
24
Aug
24
AISC (A$M)
Sep
24
Oct
24
Nov Dec
24
24
Jan
25
Feb
25
Mar
25
Apr May
25
25
Jun
25
-1,200
AISC/oz (A$/oz)
Figure 3: Westgold Monthly AISC
The Company sold 71,500oz of gold for the quarter achieving a record price of $5,174/oz, generating $370M in
revenue. With Westgold hedge free, operations generated $219M of mine operating cashflows with the
achieved gold price $2,486/oz over AISC.
Total capital expenditure during Q4 FY25 of $39M (Q3 FY25: $46M) includes $27M of investment in growth
projects (Bluebird-South Junction and the Great Fingall development) and $12M in plant and equipment
(processing facilities, ventilation, water and paste infrastructure across the respective sites).
In FY25, Westgold invested $199M in capital expenditure, in-line with its Capital Guidance of $200M.
Investment in exploration and resource development of $9M (Q3 FY25: $11M) for the quarter continued
focusing on Bluebird-South Junction and Starlight in the Murchison, and the Fletcher Zone and Western Flanks
at Beta Hunt in the Southern Goldfields. In FY25, Westgold invested $43M in exploration, marginally lower than
Westgold’s FY25 exploration guidance of $50M.
The net mine cash inflow for Q4 FY25 was $171M (refer Table 1 under Group Performance Metrics).
Westgold will provide its FY26 Guidance in August FY26, and a 3-year outlook during September FY26.
June 2025 Quarterly Report
5
Environmental, Social and Governance (ESG)
People
In Q4 FY25, total headcount reduced 4% to 2,227 employees, contractors and labour hire while the employee
initiated turnover rate continued to decline.
Safety and Sustainability
Safety
Westgold delivered a strong safety and sustainability performance in Q4 FY25, reinforcing its commitment to
responsible operations and continuous improvement.
Safety performance improved across all key indicators, with the Total Recordable Injury Frequency Rate
(TRIFR) reducing to 5.67 by the end of June. This marks a significant improvement from the prior quarter and
reflects the effectiveness of targeted safety initiatives and operational discipline. The Lost Time Injury
Frequency Rate (LTIFR) fell to 0.39, and the Serious Potential Incident Frequency Rate (SPIFR) improved to
8.21, continuing the downward trend across the business.
A comprehensive review of Westgold’s emergency systems and processes, with site-level verification of
findings has been performed, to ensure a standardised, emergency and crisis management system is
maintained throughout Westgold. Westgold also advanced its occupational health and hygiene program, with
a comprehensive review of current processes.
This program includes review of site Health and Hygiene Management Plans and Hygiene Risk Assessments
across all Westgold sites and development of a standardised database to support compliance, data integrity,
and reporting automation.
20
18.44
14.36
9
6
15
9.03
10
8.82
8.37
7.75
7.30
6.85
7.37
6.85
6.27
5.67
3
0
5
0.86
0.60
Q1 FY23
Q2 FY23
0.00
Q3 FY23
0.64
0.98
0.97
0.63
0.62
1.00
0.98
0.78
0.39
Q4 FY23
Q1 FY24
Q2 FY24
Q3 FY24
Q4 FY24
Q1 FY25
Q2 FY25
Q3 FY25
Q4 FY25
Recordable Injuries *
12 Month LTIFR
12 Month rolling Injury Frequency Rate
(injuries/million hours worked)
Total Recordable Injury count
12
0
12 Month TRIFR
Figure 4: The TRIFR decreased in Q4 FY25
June 2025 Quarterly Report
6
Training
Westgold achieved a major milestone with the new Maddington Supply and Training Centre becoming fully
operational.
The centre now delivers training programs including Forklift, Working at Heights, Confined Space Entry, and
First Aid, supporting statutory compliance and building internal capability.
Environment/Sustainability
Environmental performance remained strong.
No significant environmental incidents were recorded during the quarter, with investment in long term mine
infrastructure including:
Commissioning of the Tuckabianna West Tailings Storage Facility;
Construction compliance for the Higginsville TSF raise; and
Environmental approvals for a new LNG power station at Great Fingall and a new TSF at Fortnum.
Westgold completed its AASB S2 gap assessment and commenced implementation of the roadmap for FY26.
This initiative aims to ensure the Company’s 2025 Sustainability Report is aligned with Global Reporting
Initiative standards and also provides a databook to support auditability.
Photo 2: Westgold’s Maddington Supply and Training Centre
June 2025 Quarterly Report
7
Group Performance Metrics
Westgold’s quarterly physical and financial outputs for Q4 FY25 are summarised below.
Table 1: Westgold Q4 FY25 Performance
767,751
Southern
Goldfields
496,305
1,264,056
g/t
2.3
2.3
2.3
Ore Processed
t
940,810
467,310
1,408,120
Head Grade
g/t
2.0
2.4
2.1
Recovery
%
91
93
92
Gold Produced
oz
54,811
33,211
88,022
Gold Sold
oz
42,879
28,621
71,500
A$/oz
5,174
5,174
5,174
Mining
A$’M
84
68
152
Processing
A$’M
34
20
54
Admin
A$’M
7
4
11
Stockpile Movements
A$’M
(6)
(1)
(7)
Royalties
A$’M
7
5
12
Cash Cost (produced oz)
A$’M
126
96
222
Corporate Costs
A$’M
3
1
4
Sustaining Capital
A$’M
9
2
11
All-in Sustaining Costs
A$’M
138
99
237
All-in Sustaining Costs
A$/oz
2,503
2,992
2,688
Notional Cashflow Summary
Units
Murchison
Group
Notional Revenue (produced oz)
A$’M
284
Southern
Goldfields
172
All-in Sustaining Costs
A$’M
138
99
237
Mine Operating Cashflow
A$’M
146
73
219
Growth Capital
A$’M
(25)
(2)
(27)
Plant and Equipment
A$’M
(6)
(6)
(12)
Exploration Spend
A$’M
(3)
(6)
(9)
Net Mine Cashflow
A$’M
112
59
171
Net Mine Cashflow
A$/oz
2,045
1,759
1,937
Physical Summary
Units
Murchison
ROM - Ore Mined
t
Grade Mined
Achieved Gold Price
Group
Cost Summary
June 2025 Quarterly Report
456
8
Q4 FY25 Group Performance Overview
Westgold mined a total of 1,264kt (Q3 FY25: 997kt), with all operating mines reporting higher mining rates than
achieved in Q3, FY25.
Westgold processed 1,408 kt (Q3 FY25: 1,297 kt) of ore in total at an average grade of 2.1g/t Au (Q3 FY25: 2.1g/t
Au), producing 88,022oz of gold (Q3 FY25: 80,107oz). Group AISC in Q4 FY25 was $237M (Q3 FY25: $227M).
MURCHISON
The Murchison operations produced 54,811oz of gold (Q3 FY25: 42,906oz). Quarterly production grew due to
the mining of several large Bluebird-South Junction stopes at the end of the quarter and improved access to
high-grade ore from the Galaxy lodes at Starlight.
Total AISC of $138M (Q3 FY25: $136M) was slightly higher than the prior quarter, mainly due to increased ore
mined during the period with higher production at South Junction which was partially been offset by stockpile
build up at the end of quarter.
AISC per ounce of $2,503/oz (Q3 FY25: $3,160/oz) was lower mainly as a result of increased ounces produced
in the quarter.
Total Capital Expenditure of $31M, includes Growth Capital ($25M) and Plant and Equipment ($6M) across the
Murchison operations. Growth Capital related to the Great Fingall development and expansions to the
Bluebird-South Junction and Starlight mines. Plant and Equipment includes investment mainly related to
processing facilities, Bluebird-South Junction primary ventilation fans ($2M), Bluebird paste and water
infrastructure ($3M), and processing tank refurbishment ($1M) during the quarter.
SOUTHERN GOLDFIELDS
The Southern Goldfields produced 33,211oz of gold in Q4 FY25 (Q3 FY25: 37,201oz). The decreased output
quarter on quarter was due to truck reliability issues in the aging haulage fleet at Beta Hunt. Reduced truck
availability impacted spatial compliance reducing capacity to produce from planned higher grade areas deeper
in the mine.
The reduced mined grade affected Westgold’s plan to offset the lower quarter on quarter milling capacity in the
Southern Goldfields following the divestment of Lakewood in Q3 FY25.
The total AISC in the Southern Operations increased quarter on quarter (Q4 FY25 AISC: $99M vs Q3 FY25 AISC:
$91M). On a per ounce basis, AISC was higher at $2,992/oz in Q4 FY25 (Q3 FY25: $2,446/oz), with the increase
being driven primarily by the increased mining of lower grade ore at Beta Hunt.
Total Capital Expenditure of $8M, includes Growth Capital ($2M) and Plant and Equipment ($6M) across the
Southern Goldfields Operations mainly relating to water, ventilation and underground infrastructure at Beta
Hunt mine.
June 2025 Quarterly Report
9
Table 2: Q4 FY25 Group Mining Physicals
Murchison
Ore Mined
(‘000 t)
768
Mined Grade
(g/t)
2.27
Contained ounces
(Oz)
55,949
Bluebird
170
2.57
14,027
Fender
90
1.92
5,551
Big Bell
279
1.83
16,416
Great Fingall
32
1.44
1,498
Starlight
197
2.92
18,457
Southern Goldfields
496
2.27
36,325
Beta Hunt
383
2.32
28,533
Two Boys
56
2.92
5,210
Lake Cowan OP
57
1.39
2,582
GROUP
1,264
2.27
92,274
Table 3: Q4 FY25 Group Processing Physicals
Murchison
Ore Milled
(‘000 t)
941
Head Grade
(g/t)
1.98
Recovery
(%)
91
Gold Production
(Oz)
54,811
Bluebird
159
2.54
95
12,426
47
1.95
91
2,686
171
0.91
91
4,528
Bluebird Hub
377
1.73
94
19,640
Big Bell
268
1.83
88
13,801
Fender
33
2.32
88
2,134
Great Fingall
9
1.36
90
353
Open Pit & Low Grade
23
1.15
86
734
Tuckabianna Hub
333
1.81
88
17,022
Starlight
191
3.04
93
17,273
Open Pit & Low Grade
40
0.73
92
876
Fortnum Hub
231
2.64
93
18,149
Southern Goldfields
467
2.37
93
33,211
Beta Hunt
356
2.48
94
26,597
Two Boys
52
3.02
91
4,633
Lake Cowan
24
1.40
92
1,014
Open Pit & Low Grade
35
0.94
92
967
GROUP TOTAL
1,408
2.11
92
88,022
Fender
Open Pit & Low Grade
3
3
Includes low grade ore mined at Big Bell and stockpiles from Starlight, trucked to Bluebird
June 2025 Quarterly Report
10
Operations and Project Summary
Murchison
Figure 5: Westgold’s Murchison Assets
June 2025 Quarterly Report
11
Bluebird-South Junction Underground Mine (Meekatharra)
Bluebird-South Junction mined 170kt at 2.57 g/t for 14,027oz (Q3 FY25: 109kt at 2.71 g/t for 9,483oz),
with higher ore production quarter on quarter offset by slightly lower grades.
During the quarter, Westgold gained access across two levels of the South Junction mine, which
delivered increased production from the mine during the quarter. Following assessment of footwall
ground conditions, Westgold commenced a process of transitioning its mine design from transverse to
predominantly longitudinal open stoping.
By placing development predominately within the more competent orebody and minimising work in the
ultramafic host rock, this mine design supports sustainable operations over its multi-decade mine life.
With the installation of the paste plant mostly complete, Westgold is expecting to commence paste filling
at Bluebird-South Junction late Q1 FY26, enabling near 100% ore body extraction from underground.
This transition in mine design and the commencement of paste fill will initially result in lower mining rates
for the first half of FY26 whilst the mine remains development constrained and limited by number of
parallel mining areas. A steady ramp up is expected to follow as the requisite independent mining fronts
are established to sustain a 1-1.2Mtpa mining rate from Bluebird-South Junction by the end of FY26.
In conjunction with the expansion in mining rates, project works remain on track for underground HV
electrical upgrades, primary ventilation upgrades and paste fill infrastructure. The completion of these
projects will ensure sustained production growth from South Junction.
Bluebird Mill (Meekatharra)
Q4 FY25 gold production at the Bluebird Mill was steady with increased throughput on lower grade. The
mill processed 377kt at 1.73g/t (Q3 FY25: 240kt at 2.00g/t) with 94% recovery (Q3 FY25: 92%) for
19,640oz (Q3 FY25: 14,136oz).
Increased production from Bluebird-South Junction, haulage of low-grade stockpile feed (predominantly
from Fortnum), and Big Bell and Fender material surplus to Tuckabianna requirements drove the quarter
on quarter throughput increase at the Bluebird Mill.
Fender Underground Mine (Cue)
The marginal improvement in ore production at Fender quarter on quarter was offset by a known
reduction in mined grade in the current mining area, with the mine delivering 90kt at 1.92g/t for 5,551oz
(Q3 FY25: 79kt at 2.37g/t for 6,048oz). Fender is expected to continue to deliver consistently with an
improved head grade in Q1 FY26.
Big Bell Underground Mine (Cue)
Big Bell mined 279kt at 1.83g/t for 16,416oz (Q3 FY25: 246kt at 1.80g/t for 14,251oz).
Production from Big Bell increased quarter on quarter as the expansion of the Upper Cave continued to
increase output. Upper Cave production in Q4 FY25 represented ~60% of total Big Bell mine output, with
the remainder coming from the Lower Cave and adjacent stopes. Westgold expects the proportion of
Upper Cave ore in total Big Bell production to continue to increase over FY26.
June 2025 Quarterly Report
12
Westgold deferred the Big Bell Deeps expansion in early FY25 (the development of the deeper long hole
open stoping mining operation under the sub-level cave) to prioritise the larger Bluebird-South Junction
and Beta Hunt mine expansions and to capitalise on relatively simple upper cave opportunity.
This allowed deferral of approximately $20M of capital spend at Big Bell and provide the opportunity to
evaluate new options to enhance Big Bell Deeps expansion economics. These option studies and
additional drilling are underway.
Great Fingall Underground Mine (Cue)
Mining commenced at Great Fingall, from the lower grade Great Fingall flats area which delivered 32kt
at 1.44g/t for 1,498oz, with the ore transported to Tuckabianna for processing.
In parallel, decline development continued to progress toward the first production levels from the higher
grade virgin stopes, with stoping expected to commence in Q1 FY26 following the completion of
dewatering activities.
Barminco Limited (Barminco), a leading underground mining services provider, has been formally
awarded the mining contract for Great Fingall. The contract encompasses all aspects of underground
development, production, and associated services at Great Fingall. Barminco is set to mobilise their
specialist workforce and equipment to site, with a transition anticipated in September 2025. This
partnership is expected to accelerate production ramp-up at Great Fingall, capitalising on Barminco’s
extensive experience in similar underground mining projects across Australia.
Westgold is also preparing to initiate comprehensive resource definition and extensional drilling
programs at Great Fingall. These initiatives will focus on the Great Fingall Reef, Golden Crown, Sovereign,
and several additional targets identified beyond the current mine plan but accessible from the new
development.
Tuckabianna Mill (Cue)
Tuckabianna processed 333kt at 1.81g/t (Q3 FY25: 310kt at 1.86g/t) with an 88% recovery rate (Q3 FY25:
88%), yielding 17,022oz (Q3 FY25: 16,264oz).
The production increase at Tuckabianna quarter on quarter was driven by increased ore production at
Big Bell, predominantly from the upper cave.
Tuckabianna completed a planned 6-day long shutdown early July 2025 following the end of the period.
Starlight Underground Mine (Fortnum)
Starlight UG mined 197kt at 2.92g/t for 18,457oz (Q3 FY25: 147kt at 2.64g/t for 12,495oz). Ore volumes
mined saw a 34% increase quarter on quarter due to the use of new, high performing fleet increasing
mine productivity with access to a third mining front in the Galaxy zone. Mined grade also increased
quarter on quarter with mining of the higher grade Galaxy stopes commencing during Q4 FY25.
Following the completion of planned primary fan upgrades in Q3 FY25, further ventilation upgrades are
scheduled for Q1 FY26 and Q3 FY26 to support Life of Mine plans at a ~80kt/month production rate.
June 2025 Quarterly Report
13
Fortnum Processing Hub (Fortnum)
In Q4 FY25, Fortnum processed 231kt at 2.64g/t (Q3 FY25: 202kt at 2.08g/t) with 93% recovery (Q3 FY25:
93%) for 18,149oz (Q3 FY25: 12,506oz). The higher gold production, driven by increased production from
Starlight and reduced processing of stockpile ore.
Southern Goldfields
Figure 6: Westgold’s Southern Goldfields Assets
June 2025 Quarterly Report
14
Beta Hunt Underground Mine (Kambalda)
Beta Hunt achieved improved mining rates quarter on quarter, mining 383kt at 2.32g/t for 28,533oz (Q3
FY25: 363kt at 2.79g/t for 32,498oz). The improved rates were achieved despite experiencing multiple
truck reliability issues, leaving the haulage fleet under capacity. To maintain mining rates, mining was
focussed on upper, lower grade regions which adversely affected mined grade.
Mine outputs at times were also impacted by critical infrastructure restrictions. The additional water
supply project is now completed securing Beta Hunt’s access to a clean water supply. Ventilation
upgrades at Beta Hunt have seen minor delays with fan commission occurring in late July / early August.
The power supply upgrade project work at Beta Hunt is now also complete, establishing reliable power
with increased capacity to support future growth.
Two Boys Underground Mine (Higginsville)
Production from the small Two Boys underground mine improved by 23% this quarter with higher tonnes
and grade, having mined 56kt at 2.92g/t for 5,210oz (Q3 FY25: 52kt at 2.52g/t for 4,213oz). Grade control
drilling completed to date has enabled the development of a mine plan which now establishes a 12month planning horizon.
Lake Cowan Open Pits (Higginsville)
Lake Cowan mined 57kt at 1.39g/t for 2,582oz.
Mining at the Lake Cowan open pits commenced in early Q4 FY25 with open pit contractor Mineral Mining
Services Pty Ltd having mobilised in April. With the pre-strip completed in Q4 FY25, ore production is
expected to peak in Q1 FY26 prior to the pit completion at the end of the quarter.
Excess soft oxide Lake Cowan ore will be stockpiled and processed over the course of FY26.
Southern Goldfields processing
The 1.6Mtpa Higginsville processing plant processed 382kt at 2.42g/t (Q3 FY25: 333kt at 2.17g/t) with a
93% recovery (Q3 FY25: 93%), producing 27,698oz (Q3 FY25: 21,804oz).
Higginsville currently relies on Beta Hunt underground ore as its primary ore feed sources, and is
supplemented by Two Boys, Lake Cowan and Low-Grade Stockpiles. During the quarter, increased
volumes of Beta Hunt ore and the addition of Lake Cowan ore displaced low grade stockpile feed in the
blend, increasing the processing grade compared to Q3.
The divestment of Lakewood was completed at the end of Q3 FY25 to Black Cat Syndicate Limited (ASX:
BC8). Westgold has access to 400,000t of toll milling capacity over 2 years with BC8 and in Q4 FY25, the
first toll milling parcels were processed.
The Lakewood mill processed 85kt at 2.16g/t (Q3 FY25: 212kt at 2.46g/t) with a 92% recovery (Q3 FY25:
92%), yielding 5,513oz (Q2 FY25: 15,397oz), with the feed being sourced from Beta Hunt.
June 2025 Quarterly Report
15
Exploration
Exploration investment for the quarter was $9M (Q3 FY25: $11M). In Q4 FY25 exciting resource definition drilling
results were returned at Bluebird-South Junction, Starlight, Great Fingall and Beta Hunt including:
3.03m at 157.10g/t Au from 270.00m in 25BLDD001 (Bluebird - Polar Star Lode);
4.43m at 264.37g/t Au from 111.00m and 15.15m at 17.11g/t Au from 173.00m in NF1050GC42,
(Starlight -Nightfall lode);
7.23m at 12.25g/t Au from 312.00m in 24GCDD017 (Great Fingall – Golden Crown),
15.96m at 23.17g/t Au from 264.00m in 24SVDD038A (Great Fingall -Golden Crown);
8.03m at 101.72g/t Au from 8.00m in AWLINKDD-15AG (Beta Hunt – Western Flanks);
6.90m at 372.32g/t Au from 8.00m in WWSP4-31AG (Beta Hunt – Western Flanks).
Fletcher Maiden Resource4
A particular highlight during the quarter was Westgold’s announcement of the maiden Mineral Resource
Estimate (MRE) for Stage 1 of the Fletcher Zone at Beta Hunt 4. The Stage 1 MRE totals 31Mt at 2.3g/t for
2.3Moz of gold, effectively doubling the September 2024 Beta Hunt Mineral Resource. This estimate is
based on drilling across the first kilometre of the known two-kilometre strike, with mineralisation extending up
to 500 metres in width and over 800 metres vertically.
The resource remains open at depth, and conversion drilling is underway targeting a maiden Ore Reserve in
FY26. The Fletcher Zone is interpreted as a parallel structural analogue to the Western Flanks and A Zone
deposits, reinforcing its significance as the third major mineralised shear zone system within the Hunt Block.
Full details are provided in the ASX announcement released on 23 July 2025, titled “June 2025 Quarterly
Exploration Results”.
Corporate
At the end of Q4 FY25, Westgold’s total cash, bullion and investments totalled $364M.
Cash, Bullion and Investments
Descrip
Share your feedback
Discover