March 2026 Quarterly Results
Released
Released
Announcement PDF
March 2026 Quarterly Report
29 April 2026
Westgold Resources Limited
ASX: WGX | TSX: WGX
ABN 60 009 260 306
westgold.com.au
T: +61 8 9462 3400
E: perth.reception@westgold.com.au
Level 13, 200 St Georges Terrace
Perth WA 6000 / PO Box 7068
Cloisters Square WA 6850
ASX Release
Westgold is a leading, ASX100
Australian gold producer, with a clear
purpose - to unearth enduring value for
all our stakeholders.
Our vision is to become the leading
Australian gold company, sustaining
safe, responsible and profitable
production.
Our operations comprise four mining
hubs, with combined processing
capacity of ~6Mtpa across the
Murchison and Southern Goldfields,
two of Western Australia’s most prolific
gold-producing regions.
Financial values are reported in A$ unless
otherwise specified.
This announcement is authorised for
release to the ASX by the Board.
Investor Relations
Kasun Liyanaarachchi
Group Manager IR & Communications
investor.relations@westgold.com.au
+61 458 564 483
Media
Annette Ellis
media@westgold.com.au
+61 458 200 039
$285M Underlying Quarterly Cash Build
Perth, Western Australia, 29 April 2026: Westgold Resources
Limited (ASX | TSX: WGX - Westgold or the Company) is pleased to
report results for the period ending 31 March 2026 (Q3 FY26).
HIGHLIGHTS
SAFETY
Lost Time Injury Frequency Rate (LTIFR) improved to 1.29 / million
hours worked
PRODUCTION
Gold production of 93,145oz Au - 288,500oz to the end of Q3, FY26
All in Sustaining Cost (AISC) of $2,931/oz (excl. ore purchase
agreement (OPA)) – with AISC including OPA of $3,338/oz
FY26 Guidance maintained
TREASURY
Gold sales of 69,900oz at $7,080/oz generating $495M revenue; gold
bullion inventory of 33.4koz valued at $225M at quarter end
Underlying cash build of $285M - before investments in growth
($81M), share buybacks ($3M), proceeds from asset sales $14M, and
exploration ($13M)
$856M in closing cash, bullion, and liquid investments @ 31 March
2026 - a $202M increase Q on Q
Westgold is 100% debt free and remains unhedged
EXPLORATION
23 drill rigs operating - across the Murchison and Southern Goldfields
CORPORATE
Westgold enters the ASX 100
FID for Higginsville Expansion to 2.6Mtpa approved
Portfolio optimisation delivers ~$140M of immediate shareholder
value - with up to ~$30M of additional deferred value
$600M Unsecured Credit Facility strengthens balance sheet flexibility
Share buyback continues
March 2026 Quarterly Report 2
Westgold Managing Director and CEO Wayne Bramwell commented:
“Westgold delivered another strong quarter in Q3 FY26, with cash generation lifting treasury to $856M. Underlying
quarterly cash build of $285M underpins a business that is continually building strength to internally fund growth and
return capital to shareholders.
FY26 production guidance has been maintained. While full year costs are expected to finish toward the top end of
guidance, this reflects both broader industry inflationary pressures and deliberate operational decisions taken to
maximise cashflow.
Operationally, Bluebird–South Junction and Beta Hunt remain the two cornerstone assets underpinning Westgold's
growth over the next three years. At Bluebird–South Junction, mining performance has continued to improve quarter-on-
quarter. With a consistent lift in mining outputs and additional working areas available within the mine, we expect
Bluebird–South Junction to achieve mining rates of 1.0–1.2Mtpa by the end of the financial year.
At Beta Hunt, underground development rates continued to improve throughout the quarter, enabling the opening of
additional working areas deeper in the mine. While ventilation constraints temporarily impacted Q3 production, the
subsequent restart of the ventilation fans positions Beta Hunt strongly for Q4, where we expect the operation to ramp up
to a 2.0Mtpa mining rate by quarter end.
Open pit mining recommenced in the Murchison during the quarter — three months ahead of schedule. This program
will enhance ore blend and more consistent mill utilisation, underpinning our strategy to transition the Murchison from
mine-constrained to mill-constrained over time.
With respect to organic growth, the Board approved the Higginsville Expansion Plan — a staged, capital-efficient
investment that will materially increase processing capacity in the Southern Goldfields. The expansion is expected to
lower unit processing costs and underpin higher gold output from the Southern Goldfields as Beta Hunt continues to
ramp up through FY27.
Simplification of our portfolio continued with the divestment of the Mt Henry–Selene Gold Project to Alicanto Minerals
and the spin-out of our Reedy and Comet assets through the ASX listing of Valiant Gold. These two corporate deals
unlocked ~$140M of immediate value for Westgold shareholders, whilst retaining exposure to future upside through
strategic equity shareholdings.
Treasury strength remains key to mitigating market volatility. We strengthened our balance sheet through the upsizing
and refinancing of our credit facilities - increasing total available liquidity. Combined with our growing cash position,
Westgold has enhanced optionality to both fund internal growth and return capital to our shareholders, via dividends and
on-market share buybacks (when not in Blackout periods).
Westgold did not experience any fuel supply disruptions during the period. Our exposure to diesel remains moderate as
a result of previous investment in the hybrid power infrastructure across the Murchison. We continue to monitor the
situation in the Middle East and have the appropriate plans in place should fuel supply risks escalate.
Our elevation into the ASX 100 during the quarter is a significant milestone for Westgold. It reflects the growing scale,
quality and resilience of the business, but most importantly the continued efforts of our people, who continue to build
it."
March 2026 Quarterly Report 3
Executive Summary
Cash Position as of 31 March 2026
Westgold closed Q3, FY26 with cash, bullion and liquid investments of $856M – representing a build of $202M in total
cash, bullion and liquid investments.
Underlying cash build was $285M before one off payments (Share buy backs $3M), growth and exploration spend
(invested $81M on non-sustaining capital and $13M on exploration), and one-off cash inflows (proceeds from asset sales
totalled $14M).
This result was driven by an increase in realised gold price to $7,080/oz and a competitive AISC margin of $3,742/oz.
Figure 1: Cash, Bullion, and Liquid Investments Movement (A$M) – Q3 FY26
Notes for Q3 Cash, Bullion and Liquid Investment Movements
▪ Total FY25 tax and FY26 tax instalments of $34M.
▪ Proceeds from Asset Sales of $14M relating to the Mt Henry-Selene Gold Project Divestment consideration
received in the quarter.
▪ Closing Q3, FY26 liquid investments exclude investment in Valiant Gold Limited (escrow ends 27 March 2028).
▪ Westgold remains unhedged and fully exposed to the spot gold price.
+$202
March 2026 Quarterly Report 4
Group Production Highlights – Q3, FY26
Westgold produced 93,145oz of gold (Q2 FY26: 111,418oz), processing 1,481 kt (Q2 FY26: 1,529kt) of ore in total at an
average grade of 2.1g/t Au (Q2 FY26: 2.4g/t Au). The lower production was driven predominantly by lower head grades
from the Starlight mine and the New Murchison OPA in the Murchison and from Beta Hunt in the Southern Goldfields.
Westgold mined a total of 1,148kt at 2.2g/t Au (Q2 FY26: 1,188kt at 2.4g/t Au). Total tonnes mined declined modestly
quarter on quarter due to the Lake Cowan open pit completion in Q2 and mining rates at Beta Hunt being temporarily
impacted by ventilation capacity constraints. Despite this, underground equipment productivity increased by
approximately 15% compared to Q1 FY26, supporting steady or improved mining performance across most other mines,
allowing material ore stockpiles to be built across the Murchison operations. Mining rates at Beta Hunt are expected to
reach the targeted 2Mtpa run rate by the end of Q4, following the recent restart of the fans.
Westgold maintains its production guidance for FY26 of 345,000 – 385,000oz, having produced 288,500oz for the
financial year to the end of Q3 FY26.
Production from Westgold's assets was in line with expectations in Q3 FY26. With no immediate impediments to the
ramp up in mining rates at Bluebird and Beta Hunt, ventilation upgrades at Big Bell completed, and no major plant
shutdowns scheduled for Q4, the Company is in a strong position to achieve its production targets for the year.
Excluding gold production from ore purchased under the OPA, Group All-In Sustaining Cost (AISC) was $2,931/oz which
was in-line with the prior quarter (Q2 FY26: $2,902/oz). AISC inclusive of the OPA for Q3, FY26 was $311M (Q2 FY26:
$386M), and on a per ounce basis was $3,338/oz (Q2 FY26: $3,466/oz).
The reduction was primarily driven by lower OPA costs quarter-on-quarter, reflecting two key factors. First, Westgold’s
OPA margin lifted to 17% on the prevailing gold price (following the expiry of a margin reduction holiday, under which the
margin had been temporarily reduced to 8.5% for much of the previous quarter). Second, Westgold elected to purchase
additional OPA material during Q2 (compared to Q3), accepting higher absolute costs in return for increased cash flow.
The OPA added $22M to the cash build in Q3 FY26.
Westgold’s 3-Year Outlook outlines a clear pathway to structurally lower costs as lower grade stockpile feed is
progressively replaced with higher-grade sources from across our portfolio. Westgold is also actively advancing organic
opportunities such as the Murchison Open Pit Program, to bring value forward in the 3YO.
Westgold maintains its cost guidance of $2,600 – $2,900/oz, exclusive of the gold price linked OPA costs, though
costs are expected to be at the top end of the guidance range for the full year. While Westgold maintains its margin,
the OPA costs increase with the higher gold price, driving the AISC, inclusive of the OPA, higher.
Across the gold industry, the rising gold price increases the impact of royalty payments on the AISC. Year to date this
escalation has added $18M or $62/oz to Westgold's AISC expectations.
Importantly, Westgold has not experienced any diesel supply disruptions. The Company maintains long-term supply
agreements with a global major diesel producer, providing security of supply across its operations. Westgold continues
to actively monitor geopolitical developments in the Middle East and retains contingency plans to manage potential
supply disruptions, ensuring operational continuity and the protection of shareholder value.
Diesel prices had no material impact on Westgold’s cost performance in Q3 FY26, with diesel accounting for
approximately 4% of Group AISC. The Company has significantly reduced its exposure to diesel through the development
of hybrid solar, gas and battery power infrastructure at its Murchison hubs, materially lowering reliance on diesel-
generated power.
While no appreciable cost impact was observed during the quarter, Westgold is now forecasting elevated diesel prices
and associated operating expenses to begin flowing through in Q4 FY26, which could result in an approximate AISC
impact of $13M, should elevated conditions persist.
March 2026 Quarterly Report 5
*Q1 and Q2 FY26 AISC adjusted post Half-Year Financial Report for the period ended 31 December 2025
Figure 2: Westgold Quarterly Production (oz), Achieved Gold Price and AISC ($/oz)
The Company sold 69,900oz of gold for the quarter achieving a record price of $7,080/oz, generating $495M in cash. At
the end of the quarter, Westgold retained a gold bullion inventory of 33.4koz valued at $225M. With Westgold hedge free,
operations generated $348M of mine operating cashflows and a strong AISC margin of $3,742/oz.
Total non-sustaining capital expenditure during Q3 FY26 of $81M (Q2 FY26: $52M) includes $55M of investment in growth
projects (Bluebird-South Junction and Great Fingall development) and $26M in plant and equipment (camp expansion
and upgrades, ventilation, power and processing facilities across the Group).
Investment in exploration and resource development of $13M (Q2 FY26: $6M) for the quarter continued focusing on
Bluebird-South Junction and Starlight in the Murchison, and the Fletcher Zone at Beta Hunt in the Southern Goldfields.
Westgold remains on track to invest the FY26 exploration guidance of $50M.
The net mine cash inflow for Q3 FY26 was $254M (refer Table 1 under Group Performance Metrics).
Gold production (oz)
Achieved gold price ($/oz)
AISC inc. OPA ($/oz)
AISC ex. OPA ($M)
AISC ex. OPA ($/oz)
OPA Cost ($M)
March 2026 Quarterly Report 6
Group Performance Metrics
Westgold’s quarterly physical and financial outputs for Q3 FY26 are summarised below.
Table 1: Westgold Q3 FY26 Performance
Physical Summary Units Murchison
Southern
Goldfields
Group
ROM - Ore Mined t 772,877 375,545 1,148,422
Grade Mined g/t 2.2 2.1 2.2
Ore Processed t 1,023,484¹ 457,532 1,481,016
Head Grade g/t 2.1¹ 2.1 2.1
Recovery % 92 94 93
Gold Produced oz 64,132¹ 29,013 93,145
Gold Produced - Excluding OPA oz 49,693 28,888 78,581
Gold Produced - OPA oz 14,439 125² 14,564
Gold Sold oz 49,553 20,347 69,900
Achieved Gold Price A$/oz 7,080 7,080 7,080
Cost Summary Units Murchison
Southern
Goldfields
Group
Mining A$’M 162¹ 55 217
Processing A$’M 34¹ 18 52
Admin A$’M 9 9 18
Stockpile Movements A$’M (20) 7 (13)
Royalties A$’M 14 12 26
Sustaining Capital A$’M 9 2 11
All-in Sustaining Costs A$M 208 103 311
All-in Sustaining Costs A$/oz 3,236 3,560 3,338
All-in Sustaining Costs – Excluding OPA A$’M 128 103 231
All-in Sustaining Costs – Excluding OPA A$/oz 2,584 3,546 2,931
Notional Cashflow Summary Units Murchison
Southern
Goldfields
Group
Notional Revenue (produced oz) A$’M 454 205 659
All-in Sustaining Costs A$’M 208 103 311
Mine Operating Cashflow A$’M 246 102 348
Growth Capital A$’M (47) (8) (55)
Plant and Equipment A$’M (20) (6) (26)
Exploration Spend A$’M (8) (5) (13)
Net Mine Cashflow A$’M 171 83 254
Net Mine Cashflow A$/oz 2,669 2,861 2,729
1.
Includes 152kt of New Murchison OPA ore processed at 3.1g/t for 14,439oz. The OPA added $80M to Westgold's group AISC.
2.
Forrestania Resources OPA.
March 2026 Quarterly Report 7
Q3 FY26 Group Performance Overview
MURCHISON
The Murchison hubs produced 64,132oz of gold in the quarter (Q2 FY26: 80,934oz), and whilst higher than Q1, production
was lower compared to Q2, primarily due to lower volumes and grade from the New Murchison OPA material, planned
shutdowns across the Murchison processing hubs and lower milled grades at Starlight following an exceptional Q2.
Improved quarter on quarter mining performance in the Murchison combined with the planned mill shutdowns which
reduced tonnes processed quarter on quarter, resulted in a stockpile build of 200kt at an average grade of 2g/t at the
Murchison processing facilities. These are expected to be largely consumed in Q4 FY26.
The OPA with New Murchison produced 14koz at 3.1g/t in Q3 FY26, down from 22koz at 4.0g/t in Q2 FY26. The higher OPA
contribution in the prior quarter reflected a deliberate decision to take advantage of an opportunity to purchase a larger
volume of high-grade oxide ore, lifting mill feed grades at Meekatharra and driving higher production in Q2.
Processed grades at the Fortnum Hub moderated, dropping to 2.4g/t in Q3 FY26 from 3.1g/t in Q2 FY26, reflecting a return
to modelled grades from mining at Starlight in Q3 following the outperformance of several high-grade stopes in Q2.
Importantly, Westgold continued to see improvement quarter on quarter from Bluebird - South Junction, the key growth
asset in the Murchison. Mining and development rates continued to improve in-line with the latest ramp up plans.
Development rates have increased significantly quarter on quarter (+10%) outperforming internal targets, and paste fill
continues to perform well, opening more work areas in the mine. This progress during Q3 FY26 at Bluebird - South
Junction puts the mine in a strong position to deliver against the target of 1 - 1.2Mtpa mining rates by the end of Q4 FY26
and to consistently deliver in FY27.
At Big Bell, the ventilation works which constrained mined tonnes and grades through Q2 and Q3, were completed at the
end of March. With these ventilation limitations now removed, increased ore supply from Big Bell is expected to displace
lower-grade stockpile haulage to the Meekatharra Hub, reducing haulage costs while improving feed grades and
production outcomes.
Excluding the OPA, the Murchison AISC per ounce was $2,584/oz which was in-line with the prior quarter (Q2 FY26:
$2,532/oz).
AISC inclusive of OPA was $208M (Q2 FY26: $276M) or $3,236/oz (Q2 FY26: $3,410/oz), lower than the prior quarter due
to a lower contribution from the gold price linked OPA ($80M).
Total Non-Sustaining Capital Expenditure of $67M, includes Growth Capital ($47M) and Plant and Equipment ($20M)
across the Murchison. Growth Capital mainly related to the continuation of Great Fingall development and expansions
to the Bluebird UG.
March 2026 Quarterly Report 8
SOUTHERN GOLDFIELDS
The Southern Goldfields operations produced 29,013oz of gold in Q3 FY26, marginally lower than the prior quarter (Q2
FY26: 30,484oz).
Production from Beta Hunt was impacted by bearing and drive shaft coupling failures in the recently commissioned
primary ventilation fans, which resulted in ventilation constraints through March. However, the impact of this on gold
production was mitigated through the drawdown of available ore stockpiles at the Higginsville Hub, demonstrating the
effectiveness of Westgold’s strategy to transition from mine-constrained to mill-constrained operations.
The ventilation fans were recently repaired, with Beta Hunt now ramping back up towards the planned 2.0Mtpa mining
rates. Further engineering improvements to the fan installation will be completed in Q4 to ensure long term performance.
Critically, development rates continued to further improve during the quarter (+25%), ensuring sufficient active mining
areas to support the ramp-up at Beta Hunt. With ventilation capacity improved and mining areas available, deferred
mining and stockpile build are expected to be progressively recovered through Q4 FY26.
The total AISC in the Southern Goldfields decreased quarter on quarter (Q3 FY26 AISC: $103M vs Q2 FY26 AISC: $110M).
On a per ounce basis, AISC was lower at $3,546/oz in Q3 FY26 (Q2 FY26: $3,614/oz). This is predominantly due to lower
mining costs as a result of lower mining activity.
Total Non-Sustaining Capital Expenditure of $14M, includes Growth Capital ($8M) and Plant and Equipment ($6M) across
the Southern Goldfields Operations mainly relating to primary ventilation, power distribution equipment at the Beta Hunt
mine and tailing facility infrastructure in Higginsville.
March 2026 Quarterly Report 9
Table 2: Q3 FY26 Group Mining Physicals
Ore Mined
(‘000 t)
Mined Grade
(g/t)
Contained ounces
(Oz)
Murchison 773 2.2 55,339
Bluebird 195 2.7 16,916
Fender 40 2.3 2,980
Big Bell 287 1.7 15,440
Great Fingall 18 2.0 1,146
Starlight 233 2.5 18,857
Southern Goldfields 375 2.1 25,470
Beta Hunt 342 2.0 21,982
Two Boys 33 3.2 3,488
GROUP TOTAL 1,148 2.2 80,809
Table 3: Q3 FY26 Group Processing Physicals
Ore Milled
(‘000 t)
Head Grade
(g/t)
Recovery
(%)
Gold Production
(Oz)
Murchison 1,024 2.1 92 64,132
Bluebird 162 2.6 94 12,796
Fender 0.2 2.2 88 13
Ore Purchase 152 3.1 97 14,439
Open Pit & Low Grade 163 0.9 89 4,146
Meekatharra Hub 477 2.2 94 31,394
Big Bell 261 1.7 87 12,598
Fender 39 2.3 87 2,538
Great Fingall 17 2.1 86 946
Open Pit & Low Grade 12 1.4 87 481
Cue Hub 329 1.8 87 16,563
Starlight 197 2.6 95 15,706
Open Pit & Low Grade 21 0.8 91 469
Fortnum Hub 218 2.4 95 16,175
Southern Goldfields 457 2.2 91 29,013
Beta Hunt 382 2.1 94 24,205
Two Boys 33 3.3 92 3,222
Lake Cowan 29 1.3 93 1,094
Ore Purchase 4 1.1 92 125
Open Pit & Low Grade 9 1.4 93 367
GROUP TOTAL 1,481 2.1 93 93,145
March 2026 Quarterly Report 10
Operations
Safety & Sustainability
During the quarter there was a positive upward trend across key leading indicators along with notable improvement in
year-to-date lagging indicators, reflecting consistency of frontline engagement and control verification effort in fatality
prevention, injury reduction, and leadership activities.
No Lost Time Injuries were reported in the quarter, with the LTIFR at 1.29.
For the quarter, the Total Recordable Injury Frequency Rate (TRIFR) was 11.8.
There were no significant environmental non-compliance events during the quarter.
The Murchison
Figure 3: Westgold’s Murchison Assets
March 2026 Quarterly Report 11
▪ Fortnum Hub
In Q3, the Fortnum Hub produced 16,175oz, processing 218kt at 2.4g/t with 95% recovery (Q2 FY26: 21,840oz,
processing 228kt at 3.1g/t with 95% recovery).
Fortnum continues to perform well, the lower production outcome was primarily driven by sequencing, following
the mining of several higher-grade stopes in Q2.
▪ Meekatharra Hub
In Q3 the Meekatharra Hub produced 31,394oz, processing 477kt at 2.2g/t with 94% recovery (Q2 FY26: 40,730oz,
processing 515kt at 2.6g/t with 95% recovery).
The lower production outcome was primarily driven by increased planned shutdowns for maintenance, as flagged
in the prior quarter, alongside reduced tonnes and grade sourced under the Ore Purchase Agreement (OPA) with
New Murchison. During the quarter, Westgold processed 152kt at 3.1g/t for 14,439oz from the OPA. In Q2,
Westgold elected to process additional ore from the Crown Prince deposit above OPA terms, following exceptional
mill performance that created surplus processing capacity.
The reduction in this additional third-party feed in Q3 also contributed to the lower throughput and head grade.
Operationally, the Meekatharra Hub continues to benefit from the strong ramp-up of the Bluebird–South Junction
underground mine. Mined production increased to 195kt at 2.7 g/t for 16,916oz (Q2 FY26: 171kt at 2.5 g/t for
13,827oz). The updated mine design methodology and enhanced ground control regimes have continued to
perform well, effectively managing ground conditions and supporting higher productivity.
As a result, Bluebird–South Junction has delivered record mining rates approaching an annualised 800ktpa and
remains on track to achieve sustained run rates of +1.0Mtpa by the end of FY26.
▪ Cue Hub
In Q3 the Cue Hub produced 16,563oz, processing 329kt at 1.8g/t with 87% recovery (Q2 FY26: 18,364oz,
processing 342kt at 1.9g/t with 86% recovery).
The reduction in production was primarily driven by increased planned maintenance downtime of the Cue
processing hub during the quarter, alongside lower grades from Big Bell due to a higher proportion of ore sourced
from the Upper Cave. Mining in the higher-grade Lower Cave was constrained following the commencement of the
Big Bell ventilation fan upgrade1
late in Q2, which limited access to those areas during Q3.
The ventilation upgrade was completed ahead of plan in late March, and with improved airflow now available,
Westgold expects increased production from Big Bell going forward. The additional ore will displace lower-grade
Fortnum stockpile haulage to the Meekatharra Hub, reducing haulage costs while improving feed grades and
overall production outcomes.
Mining of virgin stopes at Great Fingall continued to ramp up during the quarter, delivering 18kt at 2g/t for 1,146oz.
Ongoing development and the geometry of the upper virgin zones mean subsequent stopes will take time to
access, and as a result, mining rates from these areas are not expected to materially contribute during FY26.
1
See ASX announcement titled "December 2025 Quarterly Results" - 21 January 2026
March 2026 Quarterly Report 12
▪ Murchison Open Pit Program
The Murchison Open Pit Program has commenced, with pre-stripping three months ahead of schedule. Early
mobilisation of the contract mining fleet enabled Westgold to bring forward access to shallow, cash-generative
ounces at both Meekatharra and Cue, improving near-term operational flexibility and mill feed optionality across
the Murchison hubs.
Westgold does not expect material gold production from the open pit program in FY26, but at steady state, the
open pits will produce approximately 1.1Mtpa of mined ore at 1.4g/t, for an estimated 3 years.
The Southern Goldfields
Figure 4: Westgold’s Southern Goldfields Assets
March 2026 Quarterly Report 13
▪ Higginsville Hub
Higginsville Hub production was marginally lower quarter-on-quarter, primarily reflecting temporary ventilation
constraints at the Beta Hunt underground mine.
The 1.6Mtpa Higginsville processing plant produced 25,957oz, treating 396kt at 2.2g/t with a 94% recovery (Q2
FY26: 27,185oz, processing 389kt at 2.3g/t with 94% recovery). Beta Hunt achieved lower mining rates and lower
mined grade quarter on quarter, mining 342kt at 2.0g/t for 21,982oz (Q2 FY26: 396kt at 2.2g/t for 27,603oz).
During most of March, primary ventilation issues at Beta Hunt saw mining focussed on the upper parts of the mine
(which are typically lower grade). The ventilation capacity limitation did not materially impact gold production in
the Southern Goldfields for the quarter, with Beta Hunt ore production supplemented with available stockpiles at
the Higginsville Hub.
With the recent restart of the ventilation fans eliminating the ventilation constraint, Westgold expects stockpile
levels at Higginsville to recommence building. Further engineering improvements to the fan installation will be
completed in Q4 to ensure long term performance. Importantly, mine development rates continued to improve
quarter-on-quarter (see Figure 5), reinforcing confidence in achieving the targeted 2.0Mtpa mining run rate at Beta
Hunt by the end of FY26.
Figure 5: Beta Hunt development rate increases enabled by infrastructure
Toll milling of Beta Hunt ore at the Lakewood mill processed 62kt at 1.7g/t with 92% recovery for 3,056oz (Q2
FY26: 55kt at 1.9g/t with 92% recovery for 3,298oz). In Q4, Westgold is not expecting to toll mill a parcel at
Lakewood, having taken an opportunity to process an extra parcel in FY25. Toll treatment at Lakewood will
recommence in FY27.
During the quarter, Westgold’s proposed acquisition of the 327 room Bluebush Accommodation Village in
Kambalda progressed with the Sale Agreement signed and settlement anticipated in May 2026, marking the
completion of the transaction.
The purchase supports the Company’s strategy to secure long-term accommodation capacity for its expanding
Southern Goldfields operations.
March 2026 Quarterly Report 14
Exploration
During the quarter, Westgold invested $13M (Q2 FY26: $6M) in exploration and resource definition. At the end of the
quarter, Westgold had 23 drills operating across the portfolio.
Figure 6: 23 exploration drills in operation
Key exploration focus areas for Westgold include Paddy's Flat in the Murchison, where the Company is conducting
diamond drilling from surface to validate the possibility of recommencing open pit mining which may add a significant
new open pit to the Meekatharra Hub.
Westgold is also conducting exploration drilling at Big Bell South, with the purpose of evaluating the viability of an
additional mining front south of the current Big Bell cave.
Westgold continued resource definition drilling to support the Murchison Open Pit Program, with drilling conducted on
five deposits that form part of the program.
The Company has 8 underground diamond drills operating at Beta Hunt, the majority of which are conducting resource
definition and extensional drilling in the Fletcher zone.
In the Southern Goldfields, extensional exploration / resource definition drilling was focussed on routine work on all
active mines. At Beta Hunt, definition of Fletcher continued, inclusive of testing of the Stage 2 area.
March 2026 Quarterly Report 15
Greenfields exploration activities focussed mostly on the Southern Goldfields during the period with drilling programs
undertaken at the Mead Hall and Norcott targets. In addition, preparation works for upcoming programs at the McKay,
Speedway and Sleuth targets continued.
Figure 7: Greenfield exploration targets in the Southern Goldfields
March 2026 Quarterly Report 16
Corporate
At the end of Q3 FY26, Westgold’s total cash, bullion and investments totalled $856M.
Cash, Bullion and Investments
Description
Dec 2025
Quarter ($M)
Mar 2026
Quarter ($M)
Variance
($M)
Variance
(%)
Cash 521 479 (42) (8)
Bullion 49 225 176 355
Liquid Investments1
84 152 68 80
Cash, Bullion and Investments 654 856 202 30
Investments
# Shares held at
31 Mar 2026
Share price at
31 Mar 2026 (A$)
Investment Value
at 31 Mar 2026 ($M)
New Murchison Gold Limited (ASX: NMG) 1,689,427,459 0.046 78
Alicanto Minerals Limited (ASX: AQI) 32,216,744 1.540 50
Black Cat Syndicate (ASX: BC8) 19,739,439 0.990 19
Kali Metals Limited (ASX: KM1) 31,863,345 0.155 5
Total Liquid Investments 152
Valiant Gold Limited (ASX: VAL)
Escrow ends 27 March 2028
240,000,100 0.305 73
Total Investments 225
1. Liquid investments exclude holdings in Valiant Gold (VAL) under escrow until 27 March 2028.
Debt
During the quarter, Westgold established new $600M unsecured syndicated revolving facilities2
, further strengthening
balance sheet flexibility and liquidity. The facilities replace the Company’s prior arrangements and are provided by a five-
member syndicate of Australian and international Tier 1 lenders. The facilities comprise three tranches maturing in three,
four and five years, and are fully revolving with no amortisation, cash sweep or mandatory hedging requirements.
Importantly, the facilities are unsecured and may be utilised for general corporate purposes.
The new facilities significantly enhance Westgold’s financial resilience and strategic optionality. While the Company
does not currently require additional funding, the establishment of long-dated, unsecured liquidity provides flexibility to
fund growth, manag