SEPTEMBER QUARTERLY REPORT
$25M increase in cash, bullion and liquids delivers third
consecutive quarter of cash build
ASX RELEASE
Westgold Resources Limited (Westgold ASX:
WGX) is a dynamic, growth oriented
Western Australian gold miner.
As an owner operator, we mine our
orebodies with our own people and our own
equipment and aspire to create wealth for
our
shareholders,
employees
and
communities in a sustainable manner.
INVESTOR RELATIONS ENQUIRIES
Kasun Liyanaarachchi | IR Manager
Kasun.Liyanaarachchi@westgold.com.au
MEDIA
Peter Knight | Communications Advisor
Peter.Knight@westgold.com.au
CONTACT US
Westgold Resources Limited (ASX: WGX)
ACN 009 260 306
HIGHLIGHTS
Q1, FY24 production of 63,104oz Au at ASIC of $1,935/oz
Continued strong safety performance, recording a total
recordable injury frequency rate (TRIFR) of 8.82 injuries per
million hours worked for Q1 FY24
Mine operating cash flow consistent at $60M - $64M in Q4 FY23
o
Bluebird and Big Bell mines continue to perform - with
both achieving quarterly production targets and
generating material net cash inflow
Delivered into the final 10koz of fixed forward contracts marking the completion of the legacy hedge book
Clean energy transition continues - three hybrid power facilities
energised during October 2023
Dividend policy updated – 1c/share minimum dividend per
annum, up to a maximum of 30% free cash flow
Aggressive drilling programme continues - 10 rigs operating
with better results including:
o
15.98m at 12.26g/t Au from 129m (23BLDD162 – Bluebird)
o
12.91m at 12.47g/t Au from 78m (23MUDD230 – Paddy’s
Flat)
o
45m at 4.53g/t Au 586m (23BBDD0052 – Big Bell Deeps)
Average gold price of $2,888/oz achieved for the quarter
$217M in closing cash, bullion and liquids on 30 Sep 2023
Westgold remains debt free, fully leveraged to the gold price
and on track to deliver FY24 production and cost guidance
Westgold Managing Director, Wayne Bramwell commented:
“Westgold has continued to deliver by adding a further $25M to
its treasury in Q1, FY24. This quarter, once again characterised by
strong safety statistics and operational results, represents the
third consecutive quarter of cash build for Westgold – a first in its
long history.
perth.reception@westgold.com.au
www.westgold.com.au
Our treasury is strong and we are fully funded to deliver our
corporate objectives through operational cash flows in FY24.
Drilling continues in earnest across our assets and Westgold
continues to invest in its high value internal growth projects, with
the development of Great Fingall commencing in October.
All currency is AUD unless stated otherwise
With our cost out programme continuing, being debt free and
fully leverage to the gold price, Westgold is well poised to deliver
its FY24 guidance. “
Level 6, 200 St Georges Terrace, Perth WA 6000
+61 8 9462 3400
ASX: WGX
EXECUTIVE SUMMARY - QUARTER IN REVIEW
Westgold Resources Limited (ASX: WGX, Westgold, the Group or the Company) is pleased to report results for the
period ending 30 September 2023 (Q1, FY24).
Westgold added $25M in cash, bullion and liquid assets during the quarter, closing the quarter with $217M (see
Figure 1). This marks the third consecutive quarter of cash build, with the growing cash, bullion and liquid asset
position validating the significant changes made early in FY23. This strong financial position sets Westgold up to
continue to deliver safe and profitable gold production for its stakeholders and shareholders.
+$25M
+$24M
+$9M
159
159
Q1
FY23
Q2
FY23
217
+13%
192
168
Q3
FY23
Q1
FY24
Q4
FY23
Figure 1: Third consecutive quarter of Cash, Bullion & Liquids build ($M)
Westgold produced 63,104oz at an All-In Sustaining Cost (AISC) of $1,935/oz in Q1, FY24. Lower mined grade at Big
Bell and lower mined tonnes at Starlight contributed to an 8% decrease in gold production and a 9% increase in
ASIC/oz compared to Q4, FY23 (see Figure 2). As flagged in the prior quarter 1, Big Bell grade was expected to drop
from Q4, FY23 as a result of increased mining in the lower grade southern side of the cave. Starlight’s return to
profitability continues as this mine is transitioning through challenging legacy workings which previously impacted
ore production in the mine.
68,377
-8%
66,048
62,180
Q1 FY23
Q2 FY23
63,104
60,512
Q3 FY23
Q4 FY23
2,635
2,721
2,411
2,460
2,106
2,032
2,094
126
127
139
Gold production (oz)
1,780
122
Q1 FY24
2,888
1,935
Achieved gold price ($/oz)
AISC ($/oz)
122
AISC ($M)
Q1 FY23
Q2 FY23*
Q3 FY23
Q4 FY23
Q1 FY24
* Q2 FY23 AISC adjusted post audited Half-Year Financial Report for the period ended 31 December 2022
Figure 2: Westgold Production (oz), Achieved Gold Price & AISC ($/oz)
1
Refer to the June 2023 Quarterly Report lodged on the ASX on 26 July 2023
SEPTEMBER 2023
QUARTERLY ACTIVITIES REPORT
2
ASX: WGX
The Company sold 62,120oz of gold for the quarter at an achieved gold price of $2,888/oz, generating $179M in
revenue. The completion of Westgold’s fixed forward sales contracts early in the quarter helped maintain operating
margin by increasing exposure to elevated spot prices, offsetting the higher AISC/oz. With the achieved gold price
$953/oz over AISC, Westgold’s operations generated $60M of mine operating cashflow.
Total AISC for Q1 FY24 of $122M was in line with the Q4 FY23 AISC of $122M. Whilst the costs of mining and milling
activities are comparable to the prior quarter, there are early indications of inflationary pressures on key
consumables amid the ensuing developments in the Middle East together with increasing labour cost pressures
driven by the continued strong performance of the WA economy.
One of the key consumables experiencing inflationary and supply pressure is diesel, to which Westgold is increasingly
reducing its vulnerability through the adoption of renewable energy and innovative technologies such as hybrid
power stations, hybrid diesel-electric underground loaders and ventilation on demand systems.
Capital expenditure during Q1 was $23M, which was invested in growth and development capital predominately for
the expansion at Bluebird and Big Bell underground mines as well as the transition through difficult legacy workings
at Starlight underground mine.
Investment in exploration and resource development of $8M for the quarter is tracking in line with FY24 exploration
expenditure guidance.
The net mine cashflow for Q1 was $29M (refer Table 1 under Group Performance Metrics).
Environmental, Social and Governance (ESG)
Westgold continued to develop its Sustainability Framework following the completion of its inaugural Materiality
Assessment in FY23. One (1) Sustainability Committee meeting was conducted within Q1 FY24 with Westgold’s FY23
Sustainability Report ready for release to the market by the end of October 2023.
Clean Energy Transition (CET) Project
Westgold has now energised three (3) of four hybrid power facilities across Westgold’s operations.
During October 2023, the second and third hybrid power stations under Westgold’s CET Project were
commissioned at Fortnum and Big Bell. The first facility, at the Tuckabianna has been operational since early
August 2023 (see Figure 3).
Westgold has now achieved approximately 60% of the runrate required to achieve the targeted annualised
savings of 38 million litres of diesel, 57,000 tonnes of CO2-equivalent emissions and a reduction in AISC of
$60/oz at a diesel price of $1.64 per litre. The hybrid power facilities, owned and operated by Pacific Energy,
comprise gas-fuelled power stations, solar farms, and battery storage. Satellite LNG facilities are located at
each site and are owned and operated by Clean Energy Fuels Australia.
When fully operational, the CET Project will have 82MW of installed capacity. The facilities at Tuckabianna and
Fortnum are operating with the gas fuelled power station, solar and battery storage online. The Big Bell facility
is currently operating its gas-fuelled power station, with the solar farm and battery storage to be
commissioned in the Q3 FY24.
The last of the four new hybrid facilities, located at Bluebird, will be commissioned and operating during Q2
FY24.
SEPTEMBER 2023
QUARTERLY ACTIVITIES REPORT
3
ASX: WGX
Figure 3: Tuckabianna Solar Array
Our People, Safety, Health, and the Environment
During the quarter, Westgold increased its total workforce to 1,420 personnel including contractors. We
welcomed an additional 130 new starters many of whom are supporting the startup of additional mines
including Great Fingall and Fender. The Company’s focus on improving diversity and inclusion continues to
realise results with increased female participation and indigenous employment during the quarter.
Safety performance remained steady quarter on quarter as we move through a period of consolidation
following significant improvement in FY23. The Company’s Significant Psychosocial Harm Events and
Significant Environmental Incident Frequency Rates remained at 0.00 with no events reported for this period.
Group TRIFR increased slightly to 8.82 injuries per million hours worked and Lost Time Injury Frequency Rate
also increased to 0.98 injuries per million hours worked following the re-classification of a historical event
within the quarter (see Figure 4).
In July 2023, Westgold successfully conducted its inaugural EH&S Leaders Conference, involving the entire
Senior Leadership group, Executive Team and Board, on implementing the Company’s EH&S strategies for
FY24.
Westgold continues to build on its key strategic EH&S pillars of Leadership, Critical Risk Management,
Operational Discipline, Fit for Purpose Systems and Resilient People to drive EH&S performance.
SEPTEMBER 2023
QUARTERLY ACTIVITIES REPORT
4
ASX: WGX
Figure 4: Westgold maintains its vastly improved TRIFR in Q1 FY24
SEPTEMBER 2023
QUARTERLY ACTIVITIES REPORT
5
ASX: WGX
GROUP PERFORMANCE METRICS
Westgold’s quarterly physical and financial outcomes for Q1 FY24 are summarised in Table 1 below.
The Group operates across the Murchison and Bryah regions of Western Australia with our Murchison Operations
incorporating three underground mines (Big Bell, Bluebird and Paddy’s Flat) and two processing hubs (Tuckabianna
and Bluebird) between Cue and Meekatharra. The Bryah Operation is 160km by road from Meekatharra and
incorporates the Starlight underground mine and the Fortnum processing hub.
Table 1: Westgold Q1 FY24 Performance
GROUP
JUN QTR
FY23
MURCHISON
SEP QTR
FY24
BRYAH
SEP QTR
FY24
GROUP
SEP QTR
FY24
Physical Summary
Units
ROM - UG Ore Mined
t
690,582
461,508
154,102
615,610
UG Grade Mined
g/t
3.0
3.1
2.1
2.9
Ore Processed
t
918,176
684,654
196,780
881,434
Head Grade
g/t
2.6
2.7
1.8
2.5
Recovery
%
90%
89%
94%
90%
Gold Produced
oz
68,377
52,079
11,025
63,104
Gold Sold
oz
66,577
52,385
9,735
62,120
A$/oz
2,721
2,888
2,888
2,888
Mining
A$/oz
970
848
797
839
Processing
A$/oz
446
415
713
467
Admin
A$/oz
99
98
133
104
Stockpile Movements
A$/oz
2
113
112
113
Royalties
A$/oz
97
93
48
85
Cash Cost (produced oz)
A$/oz
1,614
1,567
1,803
1,608
Corporate Costs
A$/oz
32
32
104
44
Sustaining Capital
A$/oz
134
268
349
282
All-in Sustaining Costs
A$/oz
1,780
1,867
2,256
1,935
Achieved Gold Price
Cost Summary
Notional Cashflow Summary
Notional Revenue (produced oz)
A$ M
186
150
32
182
All-in Sustaining Costs
A$ M
(122)
(97)
(25)
(122)
Mine Operating Cashflow
A$ M
64
53
7
60
Growth Capital
A$ M
(8)
(13)
(4)
(17)
Plant & Equipment
A$ M
(2)
(3)
(3)
(6)
Exploration Spend
A$ M
(5)
(7)
(1)
(8)
Net Mine Cashflow
A$ M
49
30
(1)
29
SEPTEMBER 2023
QUARTERLY ACTIVITIES REPORT
6
ASX: WGX
OPERATIONS OVERVIEW
Q1 FY24 Group Performance
Westgold processed 881,434t (Q4 FY23 - 918,176t) of ore in total at an average grade of 2.5g/t Au (Q4 FY23 –
2.6g/t Au), producing 63,104oz of gold (Q4 FY23 – 68,377oz). Gold production was lower than the prior quarter
predominantly due to lower mined grades at Big Bell and reduced ore mined at Starlight.
Group AISC in Q1 maintained quarter on quarter (QoQ) at $122m (Q4 FY23 - $122m), with the AISC/oz in Q1
increasing QoQ by 9% to $1,935/oz (Q4 FY23 - $1,780/oz) driven by the lower Group gold production.
On a mine by mine production basis in Q1, FY24:
Big Bell continue to perform well, producing 286kt of ore mined at 2.3g/t Au for 21koz of gold. Ore
tonnes were steady quarter on quarter however, as expected2, mined grade was lower as the mine plan
transitioned to mining more of the south side of the cave. Correspondingly, fewer tonnes from the highergrade north side of the cave were mined in Q1 FY24. Decline development for accessing the Big Bell Deeps
started to accelerate as work is nearing completion on making a Final Investment Decision (FID) in Q2
FY24.
Bluebird continued its strong performance delivering 126kt of ore mined at 4.4 g/t Au for 18koz of gold.
The ongoing drilling is assisting the operation to mine higher grades for fewer tonnes, resulting in
improved profitability and cash flow. The boundaries of the Bluebird and South Junction system are still
growing and as such Westgold is continuing to conduct an extensive resource drilling programme to
expand the mine’s footprint and understand the South Junction opportunities. South Junction has the
potential to lift the Bluebird mine’s production rate by becoming another mining front.
Paddy’s Flat’s transition to a smaller scale, yet higher grade operation is on track, resulting in Paddy’s Flat
delivering 49kt of ore at 4.7g/t Au for 7.4koz of gold. As the mine continues its journey, the focus remains
on reducing the cost base and increasing the sustainability of the operation.
Starlight continued to transition through the legacy workings, with previous development in sub-optimal
locations making efficient stoping challenging. Starlight produced 154kt of ore at 2.1g/t Au for 10koz in
the quarter and after a troublesome start, the mine had a significant improvement in September which is
forecast to flow on into the next quarter. These improvements coincided with the mobilisation of a new
longhole drill, allowing for improved drilling accuracy and stoping efficiency.
Open pit and low-grade stocks – Westgold continued to monetise its inventory of low grade and open pit
stocks to manage mill blend and throughput requirements, along with trucking excess Big Bell ore and
stockpiles to the Bluebird Mill.
2
June 2023 Quarterly Report lodged on the ASX on 26 July 2023
SEPTEMBER 2023
QUARTERLY ACTIVITIES REPORT
7
ASX: WGX
Table 2: Q1, FY24 Processing Physicals
MURCHISON
Ore Milled
(‘000)
Head Grade
(g/t)
Recovery
(%)
Q1 Gold Production
(Oz)
Paddy’s Flat
97
3.74
85
9,806
Bluebird
121
4.27
96
15,997
Open Pit & Low Grade 3
128
1.40
92
5,490
BLUEBIRD HUB
346
3.09
91
31,293
Big Bell
304
2.35
86
19,781
Open Pit & Low Grade
34
1.04
89
1,005
TUCKABIANNA HUB
338
2.22
86
20,786
BRYAH
Ore Milled
(‘000)
Head Grade
(g/t)
Recovery
(%)
Q1 Gold Production
(Oz)
Starlight
162
2.09
96
10,450
Open Pit & Low Grade
35
0.71
74
575
FORTNUM HUB
197
1.84
94
11,025
GROUP TOTAL – 3 HUBS
881
2.48
90
63,104
Westgold continued its aggressive drilling programme with ten (10) underground and surface rigs operating
across the business, focused on extending the mine planning horizons of the four key operating assets.
In addition, optimisation studies continue on previously paused assets. The Fender underground at Cue
recommenced development in mid-September with the South Emu-Triton and Comet mines still being
reviewed to determine when and if they should be restarted.
The Fender restart is progressing according to plan with first ore expected in October. Ore from Fender will be
hauled to the Bluebird Mill, where it will displace lower grade stockpile feed.
During August the Final Investment Decision (FID) was approved for Great Fingall. Equipment and personnel
were mobilised with development commencing in mid-October.
The Big Bell Deeps expansion study is nearing completion. Updated drilling is increasing the size of the mine
plan and the new operating plan will materially extend the mine life, grade and production profile of the
orebody. The financial investment decision is expected during Q2, FY24.
Expenditure
o
Operating Costs
The September quarter saw the AISC maintained for the company (Q1 FY24 $122M vs Q4 FY23 $122M),
with the key items being:
•
3
lower mining costs and sustaining capital at the Starlight underground mine - with the continued
focus on transitioning through the difficult legacy workings;
Includes low grade ore mined at Big Bell and trucked to Bluebird
SEPTEMBER 2023
QUARTERLY ACTIVITIES REPORT
8
ASX: WGX
•
transition to gas, solar, battery hybrid power stations - displacing diesel usage; and
•
optimisation and efficiency improvements - in all the operating mines; offset by
•
consumption (and hence monetisation) of surface stockpiles - (Q1 FY24 $7.1M vs Q4 FY23
$0.1M) mainly at the Tuckabianna processing hub, thus driving the AISC higher (non-cash
movement).
Although operating costs have been maintained for the quarter, there are early indications of
inflationary pressures on key consumables amid the geo-political tensions in the Middle East in addition
to increasing labour cost pressures driven by the continued strong performance of the WA economy.
Westgold’s cost performance remains well within its full year guidance range of $1,800/oz to $2,000/oz
and well below the costs reported in the first half of FY23 (refer Figure 5). This result demonstrates the
effectiveness and sustained impact of Westgold business improvement programme.
Figure 5: Westgold Monthly AISC ($’m) & ($/oz)
o
Capital Expenditure
Capital expenditure during Q1 was $23M (Q4 FY23 - $10M), which was invested in growth and
development capital predominately for the ongoing expansion of the Bluebird and Big Bell underground
mines, the transition through difficult legacy workings at the Starlight underground mine,
commencement of the Fender underground mine, Fortnum Processing Hub tails storage facility lift and
the CET project.
Exploration and resource development spend increased to approximately $8M (Q4 FY23 - $5M). This is
tracking in line with the FY24 exploration expenditure guidance as Westgold continues to invest in
expansion and discovery of organic growth opportunities within its extensive tenement holdings.
SEPTEMBER 2023
QUARTERLY ACTIVITIES REPORT
9
ASX: WGX
MURCHISON OPERATIONS
The Murchison Operations comprise of three operating underground mines (Big Bell, Bluebird and Paddy’s Flat), one
in development (Fender) and two processing hubs (the 1.6-1.8Mtpa Bluebird plant at Meekatharra and the 1.4Mtpa
Tuckabianna plant near Cue).
The combined Murchison Operations produced 52,079oz at an AISC of $1,867/oz. The marginally lower production
compared to the prior quarter (see Figure 6) resulted from lower mill throughput due to planned maintenance
shutdowns and hard ore blends at the Bluebird mill, and the planned reduction in Big Bell mined grade.
2,500
$ 2,235 /oz
$ 2,004 /oz
50,000
$ 2,016 /oz
$ 1,867 /oz
$ 1,662 /oz
40,000
2,000
1,500
30,000
1,000
20,000
500
10,000
0
Cost per oz.
Gold Production oz.
60,000
50,329 oz
49,280 oz
48,609 oz
55,165 oz
52,079 oz
Q1 FY23
Q2 FY23*
Q3 FY23
Q4 FY23
Q1 FY24
Gold Produced
AISC/oz
-
Note:
* Q2 FY23 AISC adjusted post audited Half-Year Financial Report for the period ended 31 December 2022
Figure 6: Murchison Gold Production and AISC
Meekatharra
The Bluebird processing hub treats ore from the Paddy’s Flat and Bluebird underground mines, surplus ore from Big
Bell underground and various surface stockpiles in the region (refer Figure 7).
Bluebird Processing Hub
The Bluebird Processing Hub produced 31,293oz (Q4 FY23 – 31,829oz) by processing 346,256t of ore (Q4 FY23
– 386,341t). Higher mill feed grades of 3.1g/t Au (Q4 FY23 2.8g/t) as a result of higher grades from the Bluebird
and Paddy’s Falt underground mines, along with excess Big Bell ore and metallurgical recovery of 91% offset
the lower tonnes processed.
Tonnes were lower due to a large, planned maintenance shutdown that commenced late September for
rotation of one of the ball mill girth gears.
SEPTEMBER 2023
QUARTERLY ACTIVITIES REPORT
10
ASX: WGX
Figure 7: Murchison Operations
Bluebird Underground
The Bluebird mine produced 126,449t at 4.4g/t Au for the quarter.
Bluebird delivered another a strong quarter, with a 2% improvement to mined grade (Q4 FY23 – 4.3g/t) offset
by marginally fewer tonnes than previous quarter (Q4 FY23 – 138,597t). With the extensive drilling
programmes underway at Bluebird, the mine has better definition of the ore domains, allowing for more
efficient mining of the orebody – fewer tonnes at higher grade for equivalent gold production with improved
profitability. The works on the second decline are now well established, opening up more production fronts to
maintain planned outputs.
Planning works are underway to determine the optimal location to develop a drill platform for South Junction
to accelerate drilling and enable access sooner.
SEPTEMBER 2023
QUARTERLY ACTIVITIES REPORT
11
ASX: WGX
Bluebird Near Mine Exploration and Development
Bluebird has once again delivered a strong quarter of drilling results. Two drill rigs have been active
underground for the entirety of the quarter, with an additional rig on surface for most of the period before
relocating to commence testing of an extension of the proximal Gibraltar mine.
Results such as 15.98m at 12.26g/t Au from 129m in 23BLDD162, 8.77m at 15.57g/t Au from 155m in
23BLDD167 and 44.46m at 2.97g/t Au from 176m in 23BLDD173A underscore the compelling nature of the
Bluebird orebody (see Figure 8). The site exploration team continues to grow the Bluebird lodes and quantify
the opportunity at South Junction, which has the potential to become an additional mining front at Bluebird.
Figure 8: Bluebird schematic long-section showing significant intersections.
Paddy’s Flat Underground
The Paddy’s Flat mine produced 49,436t at 4.7 g/t Au for the quarter.
Paddy’s Flat has completed its transition to a smaller output, more sustainable mine delivering reduced
tonnage in Q1 FY24 as planned (Q4 FY23 – 98,774t). Q1 mined grade increased 62% with lower volumes from
the Prohibition mining area increasing the proportion of mined ore from higher grade lodes.
The mine plan shifts from the bulk Prohibition ore system, to mining the more metallurgically benign and
higher grade Fenian’s - Consols, Hendrix, Avon, Mudlode and Fatts ore systems. Profitable production is the
key focus at Paddy’s Flat with cost control and efficiency key factors in maintaining the mine’s sustainability.
Paddy’s Flat Near Mine Exploration and Development
Whilst geological intensity and structural complexity is high at Paddy’s Flat, the rewards offered by the multiple
high grade production sources is self-evident when results such as 2m at 64.83g/t Au from 7m in 23CNDD233
at Consols, 12.91m at 12.47g/t Au from 78m in 23MUDD230 when testing the extensions to Mudlode, and
13m at 10.46g/t Au from 3m in 23VIDD218 in the poorly understood Vivian’s lodes in the north of the mine
are considered (see Figure 9).
Additionally, a high-level structural geology consultant has also been engaged to help Westgold’s geology team
integrate the various geological settings at Paddy’s Flat into a broader geological model, which will potentially
lead to improved targeting and mining outcomes for the mine in the future.
SEPTEMBER 2023
QUARTERLY ACTIVITIES REPORT
12
ASX: WGX
Figure 9: Paddy’s Flat schematic long-section showing significant intersections.
Refer to Appendix B for details of significant drilling results from Meekatharra.
Cue
Westgold’s Tuckabianna Processing Hub treats ore from one underground mine at Cue (Big Bell), supplemented with
regional open pit ore and surface stocks.
Tuckabianna Processing Hub
The Tuckabianna Processing Hub produced 20,786oz of gold in Q1 FY24 (Q4 FY23 – 23,336oz).
The hub processed 338,398t of ore, in line with the prior quarter (Q4 FY23 – 337,266t) at a lower grade of
2.2 g/t Au (Q4 FY23 2.5g/t) with a steady 86% metallurgical recovery. Grade reduced in line with forecast as
Big Bell mined in a lower grade patch of the cave, as mentioned in the previous quarterly 4.
Big Bell Underground
The Big Bell mine produced 285,624t at 2.3 g/t Au for the quarter.
The production outputs were maintained at the higher rates, offsetting the reduced grade from the cave. The
cave is at the 685 level, with the mining focus transitioning to the lower grade South side of the cave during
the quarter. Westgold is working to bring on more Northern cave fronts later in the financial year.
Development of the South Decline to access the deeps is well advanced, in preparation for the Big Bell Deeps
expansion FID during Q2, FY24.
4
Refer to June 2023 Quarterly Report lodged on the ASX on 26 July 2023
SEPTEMBER 2023
QUARTERLY ACTIVITIES REPORT
13
ASX: WGX
Near Mine Exploration and Development
Technical focus in the Cue region has largely been spread over three areas during the quarter.
As previously announced5, Great Fingall has been given Board approval and commenced development in
October. As such, technical work to support the commencement of operations is well advanced, inclusive of
planning to test remnant opportunities at both Great Fingall and Golden Crown. This work aims to add to the
commercial outcome of the operation, without diverting attention from the approved mining plan under the
historical workings. Additionally, results received from the last round of surface drilling are in the process of
being incorporated into an updated Mineral Resource model for the project.
Operations have recommenced at Fender, with development ore from the first level imminent. Hand in hand
with this restart has been planning of future resource definition activities at Fender, in addition to executing
ongoing studies optimising mine output. This work is expected to be largely concluded during Q2 FY24.
The Big Bell Deeps Expansion Feasibility study is drawing to a conclusion, with the works on track to be
presented to the Westgold Board for approval during Q2 FY24. The backfill study has been received, a decision
on paste plant provider is imminent, results from updated numerical modelling to support stress assumptions
are being incorporated in the mine design and schedule, and long-term ventilation studies have been
commissioned.
Drilling in the Big Bell Deeps area has also continued, with results such as 20m at 2.93g/t Au from 545m and
45m at 4.53g/t Au 586m in 23BBDD0052 as well as 33.1m at 2.78g/t Au from 408m in 23BBDD0054B being
standouts (see Figure 10).
Figure 10: Big Bell schematic long-section showing significant intersections.
Refer to Appendix C for details of significant drilling results from Cue.
5
Refer to the release titled Great Fingall Commences, lodged on the ASX on 23 October 2023
SEPTEMBER 2023
QUARTERLY ACTIVITIES REPORT
14
ASX: WGX
BRYAH OPERATION
Westgold’s Bryah Operation is underpinned by one underground mine (Starlight) with the Fortnum processing hub
supplemented with regional open pit ore and surface stocks (see Figure 11).
Figure 11: Westgold’s Bryah Operation
The Bryah Operation’s performance slipped in Q1 FY24 compared to the prior quarter, with 11,025oz produced (Q4
– 13,212oz) at an AISC of $2,256/oz (Q4 – $2,271/oz). This is due to the continued transition of the Starlight
underground through the legacy workings with historical development in non-ideal locations, making efficient
stoping challenging.
Westgold is confident that the management team is on track with the Bryah operation and Starlight’s operational
performance will improve as access to the Nightfall lodes increases.
SEPTEMBER 2023
QUARTERLY ACTIVITIES REPORT
15
ASX: WGX
Figure 12 below summarises the key outputs and costs by quarter at the Bryah Operation.
$ 2,414 /oz
15,000
$ 2,140 /oz
$ 2,271 /oz
$ 2,256 /oz
2,500
2,000
$ 1,696 /oz
1,500
10,000
1,000
5,000
0
Cost per oz.
Gold Production oz.
20,000
500
15,719 oz
12,900 oz
11,904 oz
13,212 oz
11,025 oz
Q1 FY23
Q2 FY23*
Q3 FY23
Q4 FY23
Q1 FY24
Gold Produced
-
AISC/oz
Note:
* Q2 FY23 AISC adjusted post audited Half-Year Financial Report for the period ended 31 December 2022
Figure 12: Bryah Gold Production and AISC
Fortnum Processing Hub
Throughput at the Fortnum processing hub was on target, resulting in 196,780t of ore being processed (Q4
FY23 – 194,569t) at a grade of 1.8g/t Au (Q4 FY23 – 2.2g/t) and 94% metallurgical recovery.
Grade was lower than planned due to the underperformance of Starlight mined grade, resulting in 11,025oz
produced in Q1 FY24 (Q4 FY23 – 13,212oz).
Starlight Underground
Ore production decreased to 154,102t (Q4 FY23 – 163,137t) at a grade of 2.1g/t Au (Q4 FY23 – 2.5g/t) for
10.3koz mined (Q4 FY23 – 12.9koz). This is due to the continued transition of the Starlight underground
through the legacy workings which contain previous development in suboptimal locations, making efficient
stoping challenging. A new longhole drill started onsite in September, improving hole accuracy and reducing
hole sizes, which will continue to assist in improving stoping outcomes.
Vast stockpiles remain at Fortnum and a ‘right sized’ Starlight delivering lower tonnage to the Fortnum mill at
a higher grade will provide a superior economic outcome.
Near Mine Exploration and Development
Drilling at Starlight during the quarter has concentrated on acquiring closer-spaced information within the
areas defined at a broad-scale through last financial year’s intensive resource development drilling
programme.
SE