Perth, Western Australia, 12 December 2024: Westgold Resources Limited (ASX/ TSX: WGX,
OTCQX: WGXRF – Westgold or the Company) is pleased to advise it has executed a gold ore
purchase agreement (OPA or Agreement) between its subsidiary, Big Bell Gold Operations Pty
Ltd, and Zeus Mining Pty Ltd, an entity owned by New Murchison Gold Limited (ASX: NMG).
The OPA remains subject to NMG shareholder approval as Westgold owns 18.7% of NMG and is
therefore deemed a related party under the ASX Listing Rules. NMG will seek the requisite
approval from its shareholders at a general meeting which will be called in January/February
2025.
Crown Prince, which is located 33kms by road from Westgold’s 1.6-1.8Mtpa Bluebird processing
plant, has a current JORC (2012) Indicated and Inferred Mineral Resource of 2.21Mt @ 3.9g/t Au
for 279Koz Au (refer NMG ASX Release of 28 November 2024 for details). Under the terms of the
OPA, Westgold has agreed to purchase between 30,000 and 50,000 tonnes of gold ore per month
from NMG’s planned open pit operation at Crown Prince.
Subject to final regulatory permitting, NMG are targeting the commencement of open pit mining,
and hence the OPA, in mid-2025. It is envisaged that most of the Crown Prince ore will be
processed in the first two years of the Agreement (being FY26 and FY27), with potential ongoing
terms to be agreed on a rolling, quarter-by-quarter basis following the two-year initial term.
Westgold Managing Director and CEO Wayne Bramwell commented:
“Westgold is delighted to have achieved a mutually beneficial outcome for both the New
Murchison Gold and Westgold shareholders. This type of commercial arrangement is capital
efficient for both companies as it leverages the existing processing infrastructure Westgold has
at Meekatharra.
The introduction of softer oxide ore from Crown Prince in FY26 effectively increases throughput
at the Westgold’s Bluebird plant – growing production and reducing our cost per ounce. At the
same time, NMG realise value for its shareholders by unlocking a pathway to production for its
Crown Prince deposit without the capital impost and execution risk of building a processing
plant.
As such this is a win-win for all shareholders and Westgold looks forward to working with New
Murchison Gold in the development of the Crown Prince deposit.”
Westgold Resources Limited
ABN 60 009 260 306
ASX: WGX | TSX: WGX | OTC: WGXRF
T: +61 8 9462 3400
E: perth.reception@westgold.com.au
W: westgold.com.au
Level 6, 200 St Georges Terrace
Perth WA 6000
PO Box 7068, Cloisters Square WA 6850
Figure 1: Westgold and NMG tenements around Meekatharra and the Bluebird mill
ENDS
Crown Prince Ore to Increase Production at Meekatharra
12 December 2024
2
This announcement is authorised for release to the ASX by the Board.
Investor and media relations enquiries
Kasun Liyanaarachchi
investor.relations@westgold.com.au
+61 458 564 483
Forward looking statements
These materials prepared by Westgold Resources Limited include forward looking statements. Often, but not always, forward looking
statements can generally be identified by the use of forward looking words such as “may”, “will”, “expect”, “intend”, “believe”,
“forecast”, “predict”, “plan”, “estimate”, “anticipate”, “continue”, and “guidance”, or other similar words and may include, without
limitation, statements regarding plans, strategies and objectives of management, anticipated production or construction
commencement dates and expected costs or production outputs.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the
Company’s actual results, performance and achievements to differ materially from any future results, performance or achievements.
Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations and general
economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and project
development, including the risks of obtaining necessary licenses and permits and diminishing quantities or grades of reserves,
political and social risks, changes to the regulatory framework within which the Company operates or may in the future operate,
environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial relations issues
and litigation.
Forward looking statements are based on the Company and its management’s good faith assumptions relating to the financial,
market, regulatory and other relevant environments that will exist and affect the Company’s business and operations in the future.
The Company does not give any assurance that the assumptions on which forward looking statements are based will prove to be
correct, or that the Company’s business or operations will not be affected in any material manner by these or other factors not
foreseen or foreseeable by the Company or management or beyond the Company’s control.
Although the Company attempts and has attempted to identify factors that would cause actual actions, events or results to differ
materially from those disclosed in forward looking statements, there may be other factors that could cause actual results,
performance, achievements or events not to be as anticipated, estimated or intended, and many events are beyond the reasonable
control of the Company. In addition, the Company’s actual results could differ materially from those anticipated in these forward
looking statements as a result of the factors outlined in the “Risk Factors” section of the Company’s continuous disclosure filings
available on SEDAR+ or the ASX, including, in the Company’s current annual report, half year report or most recent management
discussion and analysis.
Accordingly, readers are cautioned not to place undue reliance on forward looking statements. Forward looking statements in these
materials speak only at the date of issue. Subject to any continuing obligations under applicable law or any relevant stock exchange
listing rules, in providing this information the Company does not undertake any obligation to publicly update or revise any of the
forward-looking statements or to advise of any change in events, conditions or circumstances.