4 December 2024
Westgold Doubles Bluebird - South Junction Ore Reserve
107% increase in South Junction Ore Reserve to
7.2Mt at 2.5g/t Au for 573koz.
Perth, Western Australia, 4 December 2024: Westgold Resources Limited (ASX: WGX, TSX:
WGX, OTCQX: WGXRF – Westgold or the Company) is pleased to report a 107% increase in the
Ore Reserve to 7.2Mtpa at 2.5g/t for 573koz at its Bluebird - South Junction mine near
Meekatharra, Western Australia.
Highlights
Bluebird – South Junction Ore Reserve doubles to 7.2Mt at 2.5g/t Au for 573koz
■
107% increase (+296koz) from the August 2024 Ore Reserve - post mining
depletion, demonstrates value enhancement from drilling.
■
Ore Reserve underwritten by updated Mineral Resource Estimate (MRE) of 15Mt
at 2.9g/t Au for 1.4Moz - featuring a Measured and Indicated component of 8.7Mt
at 2.9g/t Au for 814koz Au (refer ASX release: “Bluebird - South Junction Mineral
Resource Grows to 1.4Moz”).
Drilling programmes to be expanded across Bluebird-South Junction mining complex
■
Surface and underground drill rigs focussed on infill and extension of the
Bluebird – South Junction Mineral Resource. This system remains open at depth,
along strike and down plunge.
■
New drill targets within 2km of Bluebird mill now being sequenced - including
Great Northern Highway (0.4km), Romsey (1.5km) and Ironbark (2.0km).
Mining studies focussed on maximising orebody extraction underway
■
Widths of +20m at South Junction enables Westgold to move to a highly
productive, high tonnage transverse stoping method – the benefits of which will
see production lift during H2 FY25.
Westgold Resources Limited
ABN 60 009 260 306
ASX: WGX / TSX:WGX / OTC:WGXRF
westgold.com.au
T: +61 8 9462 3400
E: perth.reception@westgold.com.au
Level 6, 200 St Georges Terrace
Perth WA 6000
PO Box 7068, Cloisters Square WA 6850
Westgold Managing Director and CEO Wayne Bramwell commented:
“Westgold has delivered a circa 400% increase in the Ore Reserve at Bluebird - South Junction
over the past year. Drilling continues to transform our business, and across the Bluebird-South
Junction mining complex we have not yet defined the limits of this ever-expanding system.
Project economics and free cash flow is enhanced by a large, productive underground mine
feeding a large processing plant. We have all these ingredients at Meekatharra as the BluebirdSouth Junction underground mine is the primary ore source feeding the 1.4-1.8Mtpa Bluebird
processing plant that sits 0.5km from the portal.
With scale comes the opportunity to reduce costs with mine studies to-date showing that the
South Junction deposit lends itself to a lower-cost, bulk extraction mining method that will
deliver higher ounces-per-vertical metre – underpinning its potential to be a highly effective
mining operation on the doorstep of our Meekatharra process plant.
Importantly the mineralisation at South Junction remaining open at depth, along strike and down
plunge.
With multiple surface and underground drill rigs operating, Westgold is confident we will
continue to extend and infill the Mineral Resource to further increase the life and expand the
scale of this key growth driver in the Murchison. We look forward to providing updates on this
work, as well as the ongoing mining studies at Bluebird - South Junction as we further increase
outputs to >1.2Mtpa during H2, FY25.”
Figure 1 - Bluebird – South Junction underground complex showing footprint of current Ore Reserve.
Westgold Doubles Bluebird - South Junction Ore Reserve
4 December 2024
2
Ore Reserve Growth
Since the substantial Bluebird – South Junction MRE scale and quality increase in November
2024 1, mining studies have been in progress, with a view to increasing the commensurate Ore
Reserve, strengthening the Life of Mine (LoM) and extending output from the highly productive
traverse primary / secondary mining sequence that has now been adopted at South Junction.
The Ore Reserve compilation component of these studies has now been completed, resulting in
significant growth of the Bluebird South Junction Ore Reserve to a combined 7.2Mt at 2.5g/t Au
for 573koz of produced gold (See Figure 2 below and Table 1).
This figure represents a 107% increase in the Ore Reserve post intervening mining depletion
when compared to the end of August 2024 Ore Reserve (Table 2) 2, and a 382% increase to the
Ore Reserve in the period of a year since the commencement of surface drilling activities at
Bluebird - South Junction, when compared to the end of FY23 Ore Reserve for the project (Table
3)3.
573koz
Figure 2 - Substantial growth in Ore Reserve End of FY23 and November 2025 Ore Reserves.
Table 1 - Current Bluebird - South Junction Ore Reserve.
1
2
3
Classification
Tonnes
Proven
105,000
Grade
(g/t Au)
4.0
Probable
7,141,000
2.4
559,000
Total
7,246,000
2.5
573,000
Ounces
13,600
Refer ASX Release “Bluebird - South Junction Mineral Resource Grows to 1.4Moz”.
Refer ASX Release “Westgold Declares Maiden South Junction Ore Reserve”.
Refer ASX Release “2023 Resource and Reserves Statement”.
Westgold Doubles Bluebird - South Junction Ore Reserve
4 December 2024
3
Table 2 - Aug 2024 Bluebird – South Junction Ore Reserve including Maiden South Junction Ore Reserve.
Classification
Tonnes
Proven
76,600
Grade
(g/t Au)
3.9
2,966,500
2.8
268,000
3,041,000
2.8
277,000
Probable
Total
Ounces
9,400
Table 3 - End of FY23 Bluebird Ore Reserve.
Classification
Tonnes
Proven
192,000
Grade
(g/t Au)
5.1
Probable
566,000
4.8
88,000
Total
757,000
4.9
119,000
Ounces
31,000
South Junction Expansion Underway
As revealed by drilling, the increasing size and dimensions of the Bluebird - South Junction
orebody and corresponding expanded available mining area has allowed Westgold to transition
to a far more productive transverse open stoping approach in the South – Junction area of the
mine. (See Figures 3 and 4 overleaf).
This transverse open stoping employs a primary / secondary extraction sequence and will enable
Westgold to profitably extract a far larger portion of the Mineral Resource in South Junction than
would otherwise be allowed by continuing with the conventional up-hole bench retreat approach
applied in the Bluebird area of the mine.
The transition to high-productivity transverse stoping is already underway. The first footwall
drives and accesses to drawpoints are under development, backfill and ventilation infrastructure
placement has commenced, and initial stoping panels are being production drilled.
Ramp-up works will continue with the full benefit of these productivity measures being seen
during Q3 / Q4, FY25. Westgold is devoting significant technical and management resources to
ensuring the ramp up period is hastened while continuing to prioritise safety.
Westgold Doubles Bluebird - South Junction Ore Reserve
4 December 2024
4
Figure 3 - The mineral endowment at South Junction remains open at depth, along strike and down plunge.
OUNCES PER VERTICAL METRE
0
5,000
10,000
300
15,000
20,000
25,000
30,000
REMNANT
OPPORTUNITIES
250
200
ELEVATION (MRL)
150
100
50
MAJOR
RESOURCE
0
-50
-100
-150
-200
-250
EXTENSION
OPPORTUNITIES
-300
-350
0
50,000
100,000
150,000
200,000
TONNES PER VERTICAL METRE
250,000
TVM
300,000
OVM
Figure 4 - The South Junction deposit lends itself to a lower-cost, bulk extraction mining method, that
will deliver higher ounces-per-vertical metre.
Westgold Doubles Bluebird - South Junction Ore Reserve
4 December 2024
5
Figure 5 - Long-term ventilation infrastructure under development.
Westgold Doubles Bluebird - South Junction Ore Reserve
4 December 2024
6
Next Steps
Westgold is continuing with its drill-out of the Bluebird – South Junction system.
Drilling from surface is continuing to extend the footprint of South Junction and Bluebird at depth
and to the south along strike. These works are essential in not only defining the growing orebody,
but also allowing for critical infrastructure placement to proceed with confidence. Drilling is also
active in the underground environment, infilling the orebody to allow progressive Mineral
Resource classification upgrades and to assist with mining execution.
These works will continue for the foreseeable future.
Additionally, planning works are underway to extend this drilling effort away from the immediate
vicinity of the Bluebird – South Junction mine to proximal targets within close proximity of the
Bluebird mill. The view is that opportunities such as Romsey (figure 7), Great Northern Highway
and Ironbark (all within 2km of the Bluebird mill) may now be able to leverage the significant
infrastructure and technical resourcing associated with the materially enlarged Bluebird – South
Junction mining operation.
Importantly, this work will be resourced over and above currently planned drilling activities to
ensure the rapid progress at Bluebird – South Junction is maintained.
In parallel, Westgold continues to optimise the Bluebird – South Junction mine plan. The current
Ore Reserve has provided a significantly enlarged foundation on which to base operational plans.
It has also provided a much larger footprint around which to tailor mine infrastructure solutions.
Westgold is confident that it can use this opportunity to further enhance its current transverse
primary / secondary extraction sequence in South Junction. Results of this work will be
communicated as they come to hand.
ENDS
This announcement is authorised for release to the ASX by the Board.
Investor and media relations enquiries:
Annette Ellis
Investor Relations Manager
Annette.Ellis@westgold.com.au
+61 458 200 039
Westgold Doubles Bluebird - South Junction Ore Reserve
4 December 2024
7
Competent/Qualified Person Statements
Exploration Results and Mineral Resource Estimates
The information in this release that relates to Exploration results and Mineral Resource Estimates is compiled
by Westgold technical employees and contractors under the supervision of Mr. Jake Russell B.Sc. (Hons), who
is a member of the Australian Institute of Geoscientists and who has verified, reviewed and approved such
information. Mr Russell is a full-time employee of the Company and has sufficient experience which is relevant
to the styles of mineralisation and types of deposit under consideration and to the activities which he is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves (the “JORC Code”) and as a Qualified
Person as defined in the CIM Guidelines and National Instrument 43-101 – Standards of Disclosure for Mineral
Projects (“NI 43-101”). Mr. Russell is an employee of the Company and, accordingly, is not independent for
purposes of NI 43-101. Mr Russell consents to and approves the inclusion in this release of the matters based
on his information in the form and context in which it appears. Mr Russell is eligible to participate in short- and
long-term incentive plans of the company.
Ore Reserves
The information in this release that relates to Ore Reserve is based on information compiled by Mr. Leigh Devlin
B.Eng. FAusIMM, who has verified, reviewed and approved such information. Mr. Devlin has sufficient
experience which is relevant to the styles of mineralisation and types of deposit under consideration and to the
activities which they are undertaking to qualify as a Competent Person as defined in the JORC Code and as a
Qualified Person as defined in the CIM Guidelines and NI 43-101. Mr. Devlin is an employee of the Company and,
accordingly, is not independent for purposes of NI 43-101. Mr. Devlin consents to and approves the inclusion in
this release of the matters based on his information in the form and context in which it appears. Mr. Devlin is a
full-time senior executive of the Company and is eligible to and may participate in short-term and long-term
incentive plans of the Company as disclosed in its annual reports and disclosure documents.
General
Mineral Resources, Ore Reserve Estimates and Exploration Targets and Results are calculated in accordance
with the JORC Code. The other technical and scientific information in this release has been prepared in
accordance with the Canadian regulatory requirements set out in NI 43-101 and has been reviewed on behalf
of the company by Qualified Persons, as set forth above.
This release contains references to estimates of Mineral Resources and Ore Reserves. The estimation of
Mineral Resources is inherently uncertain and involves subjective judgments about many relevant factors.
Mineral Resources that are not Ore Reserves do not have demonstrated economic viability. The accuracy of
any such estimates is a function of the quantity and quality of available data, and of the assumptions made
and judgments used in engineering and geological interpretation, which may prove to be unreliable and
depend, to a certain extent, upon the analysis of drilling results and statistical inferences that may ultimately
prove to be inaccurate. Mineral Resource estimates may require re-estimation based on, among other things:
(i) fluctuations in the price of gold; (ii) results of drilling; (iii) results of metallurgical testing, process and other
studies; (iv) changes to proposed mine plans; (v) the evaluation of mine plans subsequent to the date of any
estimates; and (vi) the possible failure to receive required permits, approvals and licenses.
The key inputs and assumptions are provided in Appendix D to this release including Section 1 – Sampling
Techniques and Data, Section 2 – Reporting of Exploration Results, Section 3 – Estimation and Reporting of
Mineral Resources and Section 4 – Estimation and Reporting of Ore Reserves.
The NI 43-101 technical report supporting the Maiden Ore Reserve contained in this release will be filed on
SEDAR+ within the next 45 days of the date of this release. Reference should be made to the full text of the
technical report for the assumptions, qualifications and limitations relating thereto.
Westgold Doubles Bluebird - South Junction Ore Reserve
4 December 2024
8
Forward looking statements
These materials prepared by Westgold Resources Limited include forward looking statements. Often, but not
always, forward looking statements can generally be identified by the use of forward looking words such as
“may”, “will”, “expect”, “intend”, “believe”, “forecast”, “predict”, “plan”, “estimate”, “anticipate”,
“continue”, and “guidance”, or other similar words and may include, without limitation, statements regarding
plans, strategies and objectives of management, anticipated production or construction commencement
dates and expected costs or production outputs.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that
may cause the Company’s actual results, performance and achievements to differ materially from any future
results, performance or achievements. Relevant factors may include, but are not limited to, changes in
commodity prices, foreign exchange fluctuations and general economic conditions, increased costs and
demand for production inputs, the speculative nature of exploration and project development, including the
risks of obtaining necessary licenses and permits and diminishing quantities or grades of reserves, political
and social risks, changes to the regulatory framework within which the Company operates or may in the future
operate, environmental conditions including extreme weather conditions, recruitment and retention of
personnel, industrial relations issues and litigation.
Forward looking statements are based on the Company and its management’s good faith assumptions relating
to the financial, market, regulatory and other relevant environments that will exist and affect the Company’s
business and operations in the future. The Company does not give any assurance that the assumptions on
which forward looking statements are based will prove to be correct, or that the Company’s business or
operations will not be affected in any material manner by these or other factors not foreseen or foreseeable by
the Company or management or beyond the Company’s control.
Although the Company attempts and has attempted to identify factors that would cause actual actions, events
or results to differ materially from those disclosed in forward looking statements, there may be other factors
that could cause actual results, performance, achievements or events not to be as anticipated, estimated or
intended, and many events are beyond the reasonable control of the Company. In addition, the Company’s
actual results could differ materially from those anticipated in these forward looking statements as a result of
the factors outlined in the “Risk Factors” section of the Company’s continuous disclosure filings available on
SEDAR+ or the ASX, including, in the Company’s current annual report, half year report or most recent
management discussion and analysis.
Accordingly, readers are cautioned not to place undue reliance on forward looking statements. Forward
looking statements in these materials speak only at the date of issue. Subject to any continuing obligations
under applicable law or any relevant stock exchange listing rules, in providing this information the Company
does not undertake any obligation to publicly update or revise any of the forward-looking statements or to
advise of any change in events, conditions or circumstances.
Westgold Doubles Bluebird - South Junction Ore Reserve
4 December 2024
9
Appendix A - History of South Junction
Mineralisation was discovered at South Junction in mid-1989 by St Barbara Mining. South
Junction was subsequently mined as an open pit from June 1990 through to the early 2000’s.
Total gold production for the open pit phase of operation at South Junction was in excess of
400,000 ounces. However, since open pit mining concluded, activity at South Junction has
effectively been dormant.
To the immediate north of South Junction, the Bluebird deposit has been mined at various stages.
This mining was dominated by small scale underground mining operations and open pits until
the turn of the century after which St Barbara, Mercator Gold and Reed Resources mined 485,000
ounces between 2000 – 2013 via substantial open pit operations.
Figure 6 - Yaloginda gold camp is absent deep drilling outside of Bluebird – South Junction.
In late 2019, Westgold commenced underground operations at Bluebird which subsequently
produced over 137koz of gold. This brings the total recorded Bluebird production to 784koz and
the combined Bluebird – South Junction production to 1.18Moz. Combining this with the Mineral
Resource remaining, Bluebird – South Junction is considered a +2Moz system.
Westgold Doubles Bluebird - South Junction Ore Reserve
4 December 2024
10
Murchison Overview
Westgold’s Murchison Operations incorporates four underground mines, three processing
plants and the Great Fingall development project near Cue. Westgold’s Bluebird processing hub
is the largest of our three Murchison processing hubs and is located approximately 15km
southwest of Meekatharra (see Figure 5).
The Bluebird underground mine is the primary ore source feeding the 1.4-1.8Mtpa Bluebird
processing plant. Surface stockpiles and supplementary ore from Cue is trucked to Bluebird to
maintain processing throughputs, with these volumes planned to reduce as the Bluebird-South
Junction mine expands.
Figure 7 - Westgold’s Murchison Asset Map.
Westgold Doubles Bluebird - South Junction Ore Reserve
4 December 2024
11
Appendix B - Background to the Ore Reserve
The Bluebird portion of Ore Reserve will be exploited via centre access retreat longhole open
stoping. The South Junction portion of Ore Reserve will be exploited via a highly productive
primary / secondary transverse stoping method with fill. The combination of these methods will
enable the production rates of Bluebird – South Junction to increase to more than triple from the
current rate of +30kt per month (refer ASX – Westgold March 2024 Quarterly Report) to rates of
100kt per month from Q3 FY25.
Modifying factors have been applied to the Bluebird - South Junction reserve stope shapes that
best reflect the appropriate extraction approach in each area of the orebody. These have been
built from a first principles basis based on geotechnical recommendations alongside orebody
dimensions and geometry.
Table 4 - Modifying factors used for Bluebird - South Junction Ore Reserve.
Parameter
Value
Comments
Mine Operating COG
2.1g/t
Assumes development complete
Full Costed COG
2.3g/t
Incorporates initial and sustaining
capital
Stope Recovery
90%
Estimated based on size and dip
Stope Dilution
10%
Development COG
1.0gt
Calculated based on geotechnical
parameters
Non-mining costs, assuming material
hauled to surface
Cut-off grades (COG) are based on realised cost profiles determined from the current Bluebird –
South Junction mine and based on a gold price of $3,200AUD/oz.
Processing recoveries used within the mine plan are indicative of those achieved at the Bluebird
plant currently. As Bluebird is an operating mine, environmental, and other governmental
approvals are currently in place.
Westgold Doubles Bluebird - South Junction Ore Reserve
4 December 2024
12
Appendix C - Previously announced drill results included in this release3
Hole
Collar N
Collar E
Collar RL
Intercept (Downhole)
From (m)
Dip
Azi
24BLDD064
7,043,673
641,491
100
3.07m at 2.30g/t Au
15
-47
101
1m at 6.37g/t Au
41
31.37m at 5.55g/t Au
122
15.5m at 4.62g/t Au
158
4.6m at 3.79g/t Au
21
-53
113
22.8m at 1.25g/t Au
173
15.82m at 3.09g/t Au
210
18.9m at 3.65g/t Au
293
24BLDD066
3
7,043,673
641,491
100
24BLDD095
7,043,757
641,489
96
9.25m at 3.79g/t Au
122
-22
67
24SJDD021_W2
7043405
641939
467
5.79m at 2.39g/t Au
541.71
-65
294
4.70m at 4.58g/t Au
550.3
20.94m at 6.74g/t Au
681.86
INC 4.68m at 16.48g/t Au
687
Refer to Westgold’s Q2 FY24, Q3 FY24 and Q4 FY24 Quarterly Reports on ASX for full South Junction drill results
Westgold Doubles Bluebird - South Junction Ore Reserve
4 December 2024
13
Appendix D – JORC 2012 Table 1 – Gold Division
SECTION 1: SAMPLING TECHNIQUES AND DATA
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling techniques
JORC Code Explanation
Commentary
•
•
Diamond Drilling
A significant portion of the data used in resource calculations has been gathered from diamond
core. Multiple sizes have been used historically. This core is geologically logged and subsequently
halved for sampling. Grade control holes may be whole-cored to streamline the core handling
process if required.
•
•
•
•
•
Drilling techniques
•
•
Nature and quality of sampling (e.g. cut channels, random chips, or
specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc.). These
examples should not be taken as limiting the broad meaning of
sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any measurement
tools or systems used.
Aspects of the determination of mineralisation that are Material to
the Public Report.
In cases where ‘industry standard’ work has been done this would
be relatively simple (e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to produce a 30
g charge for fire assay’). In other cases more explanation may be
required, such as where there is coarse gold that has inherent
sampling problems. Unusual commodities or mineralisation types
(e.g. submarine nodules) may warrant disclosure of detailed
information.
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary
air blast, auger, Bangka, sonic, etc.) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by what method, etc.).
Method of recording and assessing core and chip sample recoveries
and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
Drill sample recovery
•
Face Sampling
At each of the major past and current underground producers, each development face / round is
horizontally chip sampled. The sampling intervals are domained by geological constraints (e.g. rock
type, veining and alteration / sulphidation etc.). The majority of exposures within the orebody are
sampled.
•
Sludge Drilling
Sludge drilling at is performed with an underground production drill rig. It is an open hole drilling
method using water as the flushing medium, with a 64mm (nominal) hole diameter. Sample
intervals are ostensibly the length of the drill steel. Holes are drilled at sufficient angles to allow
flushing of the hole with water following each interval to prevent contamination. Sludge drilling is
not used to inform resource models.
•
RC Drilling
Drill cuttings are extracted from the RC return via cyclone. The underflow from each interval is
transferred via bucket to a four-tiered riffle splitter, delivering approximately three kilograms of the
recovered material into calico bags for analysis. The residual material is retained on the ground near
the hole. Composite samples are obtained from the residue material for initial analysis, with the
split samples remaining with the individual residual piles until required for re-split analysis or
eventual disposal.
•
RAB / Aircore Drilling
Combined scoops from bucket dumps from cyclone for composite. Split samples taken from
individual bucket dumps via scoop. RAB holes are not included in the resource estimate.
•
Blast Hole Drilling
Cuttings sampled via splitter tray per individual drill rod. Blast holes not included in the resource
estimate.
All geology input is logged and validated by the relevant area geologists, incorporated into this is
assessment of sample recovery. No defined relationship exists between sample recovery and
grade. Nor has sample bias due to preferential loss or gain of fine or coarse material been noted.
Westgold Doubles Bluebird - South Junction Ore Reserve
4 December 2024
14
Criteria
Logging
JORC Code Explanation
Commentary
•
•
•
•
Sub-sampling techniques
and sample preparation
•
•
•
•
•
•
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc.) photography.
The total length and percentage of the relevant intersections logged
If core, whether cut or sawn and whether quarter, half or all core
taken.
If non-core, whether riffled, tube sampled, rotary split, etc. and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the
in-situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Quality of assay data and
laboratory tests
•
•
•
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments,
etc., the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision have
been established.
Westgold Doubles Bluebird - South Junction Ore Reserve
4 December 2024
•
•
•
Westgold surface drill-holes are all orientated and have been logged in detail for geology,
veining, alteration, mineralisation and orientated structure. Westgold underground drillholes are logged in detail for geology, veining, alteration, mineralisation and structure. Core
has been logged in enough detail to allow for the relevant mineral resource estimation
techniques to be employed.
Surface core is photographed both wet and dry and underground core is photographed wet.
All photos are stored on the Company’s servers, with the photographs from each hole
contained within separate folders.
Development faces are mapped geologically.
RC, RAB and Aircore chips are geologically logged.
Sludge drilling is logged for lithology, mineralisation and vein percentage.
Logging is both qualitative and quantitative in nature.
All holes are logged completely, all faces are mapped completely.
Blast holes -Sampled via splitter tray per individual drill rods.
RAB / AC chips - Combined scoops from bucket dumps from cyclone for composite. Split
samples taken from individual bucket dumps via scoop.
RC - Three tier riffle splitter (approximately 5kg sample). Samples generally dry.
Face Chips - Nominally chipped horizontally across the face from left to right, sub-set via
geological features as appropriate.
Diamond Drilling - Half-core niche samples, sub-set via geological features as appropriate.
Grade control holes may be whole-cored to streamline the core handling process if required.
Chips / core chips undergo total preparation.
Samples undergo fine pulverisation of the entire samp
Share your feedback
Discover