March 2024 Quarterly Report
Released
Released
Announcement PDF
March 2024 Quarterly Report
24 April 2024
ASX Release
March 2024 Quarterly Report
Westgold Resources Limited (ASX:
WGX/ OTCQX: WGXRF – “Westgold”)
is a dynamic, growth-oriented
Australian gold producer. As an
owner operator, we mine our
orebodies with our own people and
equipment, creating wealth for our
shareholders, employees and
communities in which we operate.
$9M cash build lifts treasury to $247M
Westgold Resources Limited (ASX: WGX, OTCQX: WGXRF Westgold or the Company) is pleased to report results for the
period ending 31 March 2024 (Q3 FY24).
Highlights
Westgold announces plan to merge with Karora
Resources to build a +400kozpa Western
Australian Gold Producer
Q3 FY24 gold production of 52,100oz Au @ AISC of
$2,492/oz
Fifth consecutive quarter of cash build- growing
closing cash and bullion position by $9M to $247M
Improved safety performance - Total Recordable
Injury Frequency Rate (TRIFR) of 7.30 per million
hours worked
Average gold price of $3,137/oz achieved for the
quarter
Interim Dividend of 1 cent per share paid on 12
April 2024
Drilling success at Bluebird – South Junction
delivers ~500koz Mineral Resource Growth
This announcement is
authorised for release to the
ASX by the Board.
All hybrid power stations fully operational
Impressive drill results across the portfolio:
Investor and media relations enquiries
■
5.33m at 24.87g/t Au from 0m in 23MUDD398 at
Paddy’s Flat
Investor Relations
Kasun Liyanaarachchi | IR Manager
investor.relations@westgold.com.au
+61 458 564 483
■
20.4m at 5.12g/t Au from 278.9m in 24BLDD017
at Bluebird
■
12.2m at 6.44g/t Au from 125m in 24GFDD001 at
Fingall Flats
■
11.46m at 5.58g/t Au from 74m in NF1125RD03 at
Nightfall
Media
Peter Knight | Communications Manager
peter.knight@westgold.com.au
+61 459 980 481
Westgold remains debt free and fully leveraged to
the gold price
Westgold Resources Limited
ASX: WGX / OTC: WGXRF
ABN 60 009 260 306
westgold.com.au
T: +61 8 9462 3400
E: perth.reception@westgold.com.au
Level 6, 200 St Georges Terrace
Perth WA 6000 / PO Box 7068
Cloisters Square WA 6850
Westgold Managing Director Wayne Bramwell commented:
“Rainfall events, operational issues and the decision to pause mining at Paddy’s Flat negatively impacted
Group gold production in Q3, FY24. Despite those challenges Westgold delivered its fifth consecutive quarter
of cash build and added $9M to our balance sheet whilst still investing in our mines and development
projects.
Westgold has shown it does not shy away from hard business decisions as our corporate focus remains firmly
on cash flow generation and profitability. This focus over the last two years has positioned Westgold such that
it can take the next step in its corporate growth journey with the announcement post quarter end of an
agreement to merge with TSX listed Karora Resources consistent with our strategy of becoming a top tier
Australian gold miner.
Karora and Westgold share similar corporate journeys and are culturally aligned. The proposed Karora merger
brings larger cash flow capability, enhanced scale and an enviable pipeline of development assets into a wellfunded, Australian managed portfolio company that is fully leveraged to the gold price.
The expanded team will be well resourced and with a plethora of exciting targets, has a foundation to build an
unhedged, internationally investible Australian gold mining powerhouse.”
Executive Summary – Quarter In Review
Westgold added $9M in cash and bullion during the quarter, closing the quarter with $247M (see Figure 1).
This marks the fifth consecutive quarter of cash build, demonstrating consistent positive financial
performance by Westgold.
+$9M
+$21M
238
+$25M
247
217
+$24M
+$88M
192
+$9M
159
Q2
FY23
168
Q3
FY23
Q4
FY23
Q1
FY24
Q2
FY24
Q3
FY24
Figure 1: Fifth consecutive quarter of Cash, Bullion and Liquids build ($M)
Westgold produced 52,100oz in Q3 FY24 (a 12% reduction on Q2 FY24) at an All-In Sustaining Cost (AISC) of
$2,492/oz. Costs per ounce increased from Q2 FY24 AISC of $2,245/oz due to lower production as a result of
rainfall events, the cessation of mining at Paddy’s Flat and crusher faults at Fortnum and Tuckabianna.
Weather impacted all mines and mills to varying degrees, limiting road access and causing haulage delays
across surface and underground operations.
March 2024 Quarterly Report
2
After considered assessment of options that could be fast tracked to recover lost Q3 production, the
Company took the conservative approach of revising its full year FY24 production guidance on 3 April 2024 to
220,000 – 230,000 ounces at an all-in sustaining cost of $2,100 – $2,300/oz1.
68,377
63,104
60,512
59,238
-12%
52,100
Gold produc�on (oz)
Q3 FY23
Q4 FY23
2,635
2,721
Q1 FY24
2,888
Q2 FY24
Q3 FY24
3,041
3,137
2,492
2,245
2,094
127
1,780
122
1,935
122
133
Achieved gold price ($/oz)
AISC ($/oz)
-2%
130
AISC ($M)
Q3 FY23
Q4 FY23
Q1 FY24
Q2 FY24
Q3 FY24
Figure 2: Westgold Production (oz), Achieved Gold Price and AISC ($/oz)
The Company sold 47,035oz of gold for the quarter at an achieved gold price of $3,137/oz, generating $148M
in revenue. With Westgold free of any fixed forward sales contracts, the company continues to be favourably
exposed to the elevated spot prices, partly offsetting the higher AISC/oz.
With the achieved gold price $645/oz over AISC, Westgold’s operations generated $34M of mine operating
cashflows.
Total AISC for Q3 FY24 of $130M decreased by 2% (Q2 FY24 AISC of $133M) largely due to the cessation of
mining at Paddy’s Flat and the cost benefits from the Clean Energy Transition (CET) Project starting to flow
through. These were offset by higher stockpile drawdown, unplanned mill maintenance associated with the
crusher failures (wet ore) at the Tuckabianna and Fortnum Processing Hubs and sustaining capital
associated with the existing operating underground mines.
Capital expenditure during Q3 FY24 of $34M was in-line with the prior quarter (Q2 FY24, $35M). This reflects
the continued investment and ramp up of the Great Fingall and Fender development projects in addition to
ongoing expansion activities at the Bluebird, Big Bell and Starlight underground mines.
Investment in exploration and resource development of $6M for the quarter is tracking in line with the FY24
exploration expenditure guidance (Q2 FY24 $4M). The net mine cash outflow for Q3 FY24 was $6M (refer
Table 1 under Group Performance Metrics).
1
Refer to ASX announcement titled “Q3, FY24 Production Update” – 3 April 2024
March 2024 Quarterly Report
3
Westgold to merge with Karora
On 8 April 2024, Westgold and Karora announced that they have agreed to combine in a merger pursuant to
which Westgold will acquire 100% of the issued and outstanding common shares of Karora by way of a
statutory plan of arrangement under the Canada Business Corporations Act (“Transaction”).
The Transaction represents a transformational step change in growth for both Westgold and Karora
shareholders, creating a globally investable, mid-tier gold producer operating exclusively in Western Australia
which is fully leveraged to the prevailing gold price. The combination represents a highly complementary
merger of cash generating mining and processing assets, people and balance sheet.
Westgold and Karora continue to progress towards transaction completion, which is indicatively expected to
occur in early July 2024. For more information on the Transaction, please refer to ASX release titled “A New
400kozpa Australian Gold Producer” – 8 April 2024.
Environmental, Social and Governance (ESG)
This quarter, Westgold has committed to and commenced the development and implementation of a single
ESG Framework to support its growth ambitions, systems development and continual improvement
strategies.
■
Clean Energy Transition (CET) Project
Post quarter end, all of Westgold’s processing plants and underground mines are now operating with
power supplied from our four (4) new hybrid power facilities at Tuckabianna, Big Bell, Fortnum and
Bluebird. The combined capacity of the gas fuelled power stations, solar farms and battery storage
systems is 82MW.
Westgold is now operating at the run rate required to achieve the targeted annualised savings of 38
million litres of diesel, 57,000 tonnes of CO2-equivalent emissions and a reduction in AISC of $60/oz (at
a diesel price of $1.64 per litre). With the closure of six diesel power stations, Westgold has already
reduced CO2-equivalent carbon emissions by over 16,000 tonnes and saved over 14 million litres of
diesel.
March 2024 Quarterly Report
4
■
Our People, Safety, Health, and the Environment
Westgold achieved several key ‘People’ milestones during the quarter. After upgrading our employee
benefits offerings in Q2, FY24, employee turnover decreased quarter on quarter in Q3, while Indigenous
employment and new-starters increased over the same period. Westgold is committed to attracting and
retaining top talent with a renewed focus on improving our recruitment and leadership training
processes.
Safety performance continued to improve, with a TRIFR for the quarter of 7.30 injuries per million hours
worked, representing a reduction of 5.80% quarter on quarter. High Potential Event frequency increased
marginally to 7.61, and Lost Time Injuries reduced 35.05% to 0.63 for the quarter. The Company’s
Significant Psychosocial Harm Events and Significant Environmental Incident Frequency Rates remained
at 0.00 with no events reported for the period.
During the quarter, Westgold completed development of its Mine Safety Management System and
supporting Integrated Management System, Project Management Plans and Principal Mine Hazard
Management Plans.
In addition, the business conducted and completed our inaugural Psychosocial Harm Risk Assessment
and Action Plan in accordance with the Westgold Health & Wellbeing strategy.
20
18.44
14.36
9
15
9.03
6
8.37
8.82
7.75
10
7.30
3
0
5
0.86
0.60
Q1 FY23
Q2 FY23
0.00
Q3 FY23
Recordable Injuries
0.64
0.98
0.97
0.63
Q4 FY23
Q1 FY24
Q2 FY24
Q3 FY24
12 Month LTIFR
12 Month rolling Injury Frequency Rate
(injuries/million hours worked)
Total Recordable Injury (TRI) count
12
0
12 Month TRIFR
Figure 3: Westgold continues to improve its TRIFR, which in Q3 FY24 dropped to 7.30/million hours worked
March 2024 Quarterly Report
5
Group Performance Metrics
Westgold’s quarterly physical and financial outputs for Q3 FY24 are summarised in Table 1 below.
The Group operates across the Murchison and Bryah regions of Western Australia with the Murchison
Operations incorporating three underground mines (Big Bell, Fender and Bluebird) and two processing hubs
(Tuckabianna and Bluebird) between Cue and Meekatharra. The Bryah Operation is 160km by road from
Meekatharra and incorporates the Starlight underground mine and the Fortnum processing hub.
Murchison
Bryah
Group
Group
Mar Qtr
Mar Qtr
Mar Qtr
YTD
FY24
FY24
FY24
FY24
Physical Summary
ROM - UG Ore Mined
UG Grade Mined
Ore Processed
Head Grade
Recovery
Gold Produced
Gold Sold
Achieved Gold Price
Units
t
g/t
t
g/t
%
oz
oz
A$/oz
433,910
2.6
679,878
2.0
88
39,140
34,175
3,137
140,315
2.6
185,842
2.3
95
12,960
12,860
3,137
574,225
2.6
865,720
2.1
89
52,100
47,035
3,137
1,804,320
2.7
2,618,876
2.3
89
174,443
169,116
3,011
Cost Summary
Mining
Processing
Admin
Stockpile Movements
Royalties
Cash Cost (produced oz)
Corporate Costs
Sustaining Capital
All-in Sustaining Costs
A$/oz
A$/oz
A$/oz
A$/oz
A$/oz
A$/oz
A$/oz
A$/oz
A$/oz
993
645
154
233
119
2,144
35
390
2,569
1,004
632
135
74
83
1,928
101
225
2,254
995
642
150
194
110
2,091
52
349
2,492
957
559
125
118
94
1,853
47
301
2,201
A$ M
A$ M
A$ M
A$ M
A$ M
A$ M
A$ M
123
(101)
22
(26)
(5)
(5)
(14)
41
(29)
11
(3)
(1)
(1)
6
163
(130)
34
(29)
(5)
(6)
(6)
525
(384)
141
(74)
(19)
(17)
31
Notional Cashflow Summary
Notional Revenue (produced oz)
All-in Sustaining Costs
Mine Operating Cashflow
Growth Capital
Plant and Equipment
Exploration Spend
Net Mine Cashflow
Table 1: Westgold Q3 FY24 Performance
March 2024 Quarterly Report
6
Operations Overview
Q3 FY24 Group Performance
Westgold processed 865,720t (Q2 FY24 – 871,721t) of ore in total at an average grade of 2.1g/t Au (Q2 FY24 –
2.4g/t Au), producing 52,100oz of gold (Q2 FY24 – 59,238oz). Gold production was lower than the prior quarter
predominantly due to weather issues and the cessation of mining at Paddy’s Flat.
Group AISC in Q3 FY24 decreased quarter on quarter to $130M (Q2 FY24 - $133M). The $3M decrease was
driven predominantly by the slowdown in mining at Paddy’s Flat, with the mine transitioning to an exploration
phase in March, along with the cost savings associated with the new power plants starting to be realised.
These benefits were offset by higher stockpile drawdown, unplanned mill maintenance associated with the
crusher failures at the Tuckabianna and Fortnum Processing Hubs and sustaining capital associated with the
existing operating underground mines.
For Q3 FY24 on a mine by mine basis:
■
Starlight had another positive quarter - producing 140kt of ore at 2.6g/t Au for 12koz. Nightfall, where
the outstanding development results were obtained in the previous quarter, commenced production late
this quarter and is expected to drive further improved results in Q4 FY24. In February, an additional
development crew was mobilised to site to accelerate access to this expanding area of production to
increase the number of mining areas in FY25.
■
Big Bell produced 253kt of ore mined at 2.0g/t Au for 17koz. Ore tonnes and grade were marginally
lower than the prior quarter with mining in Q3 focused on the lower grade south side of the cave. Mining
of the next level of the cave will commence in the middle of Q4, which should bring about a grade uplift.
The decline development for Big Bell Deeps (the long hole open stoping area) continues, with the paste
infrastructure works well advanced for the scheduled commencement of stoping in H1 FY25.
■
Bluebird produced 103kt of ore mined at 4.0g/t Au for 13koz. A transition plan to address ore dilution
seen in Q2 is underway with this plan resulting in lower tonnages this quarter, albeit, at improved grades.
With the recent South Junction drilling results and subsequent Mineral Resource upgrade, plans are in
place to accelerate access to the area. In parallel, Westgold is increasing the development focus on an
exploration drive into Bluebird North, an exciting shallow prospective zone below the Bluebird pit.
■
Paddy’s Flat was paused - producing 36kt of ore at 3.1g/t Au for 3.5koz. Continued underperformance resulted in an expedited transition to the exploration phase with the mine pausing earlier
than anticipated. Drilling to define a sustainable mine plan at Paddy’s Flat commenced during Q3 and is
well advanced.
■
Open pit and low-grade stocks – Westgold continued to monetise its inventory of low grade and open
pit stocks to manage mill blend and throughput requirements, along with trucking excess Big Bell ore
and stockpiles to the Bluebird Mill.
■
Fender delivered 42kt of ore at 2.6g/t Au for 3.5koz. The ramp up was slower than scheduled in Q3 due
to delays in establishing mine power supply. Rainfall had a large impact on this mine delaying decline
development during March and at quarter end all power and infrastructure is now in place. All ore from
Fender will be processed at the Bluebird mill.
March 2024 Quarterly Report
7
■
Great Fingall Development Project continues as per plan with the Great Fingall decline progressing
well, ventilation drive completed and the raisebore has commenced work on establishing the primary
ventilation system. Decline advance rates continued to exceed that of the feasibility.
In the shallower portions of the mine, preparation for early access to ore from the Fingall Flats continue,
with drilling well advanced.
Table 2: Q2 FY24 Processing Physicals
■
Murchison
Ore Milled
(‘000 t)
Head Grade
(g/t)
Recovery
(%)
Q3 Gold Production
(Oz)
Paddy’s Flat
43
2.98
92
3,835
Bluebird
107
3.85
95
12,633
Fender
38
2.51
91
2,738
Open Pit & Low Grade 2
169
2.86
72
3,796
Bluebird Hub
358
2.23
89
23,002
Big Bell
254
2.09
86
14,680
Open Pit & Low Grade
68
1.04
64
1,458
Tuckabianna Hub
321
1.82
86
16,138
Bryah
Ore Milled
(‘000 t)
Head Grade
(g/t)
Recovery
(%)
Q3 Gold Production
(Oz)
Starlight
137
2.64
95
11,370
Open Pit & Low Grade
49
1.48
68
1,590
Fortnum Hub
185
2.27
95
12,960
Group Total – 3 Hubs
865
2.09
89
52,100
Exploration and studies
Westgold continued to invest in drilling with up to twelve underground and surface drill rigs operating
across the business during the quarter. The focus remains to extend the mine planning horizons of the
four key operating mines, along with defining the opportunities in the shallow, upper areas of Great
Fingall.
Westgold has extensive organic growth opportunities. Optimisation studies continue on previously
paused assets, along with work on other near mine opportunities in the existing mines. The South EmuTriton underground near Meekatharra is being reviewed for restart, along with shallow mining
opportunities in the upper areas of Great Fingall that have the potential to be accessed without
impacting the decline advance to the virgin ore at depth.
2
Includes low grade ore mined at Big Bell and trucked to Bluebird
March 2024 Quarterly Report
8
■
Operating Costs
The March quarter saw the Group AISC decrease (Q3 FY24 $130M vs Q2 FY24 $133M), driven by:
o
Mining costs decreases - due to the cessation of mining at Paddy’s Flat and reduced mining at
Starlight predominantly from Nightfall stoping and heavy rainfall.
o
Processing costs decreases - as a result of the CET Project benefits starting to be realised offset
by unplanned mill maintenance at the Tuckabianna Processing Hub for the crusher failure, lasting 9
days immediately followed a planned crushing circuit shutdown to refurbish the fine ore bin and
Fortnum Processing Hub failure in the primary crusher during the rain events.
The reduction in costs were partially offset by:
o
Higher consumption (and hence monetisation) of open pit and low-grade stockpiles – (Q3 FY24
$10M vs Q2 FY24 $4M) mainly at the Bluebird processing hub (non-cash movement).
o
Higher sustaining capital at the Starlight underground mine - due to mobilising a second
development crew to accelerate opening up the Nightfall ore system.
90
85
80
75
70
65
60
55
50
45
40
35
3,000
2,619
2,500
2,185
2,114
2,000
1,998
2,309
2,183
2,097
1,861
500
2,209 2,230
41
42
43
Jan
23
Feb
23
Mar
23
48
41
42
Apr
23
May
23
38
Jun
23
42
40
40
40
Jul
23
Aug
23
Sep
23
Oct
23
AISC ($M) (oz)
2,342
1,947
1,427
1,500
1,000
1,790
2,490
Nov
23
45
Dec
23
50
42
Jan
24
Feb
24
38
0
Mar
24
AISC/oz ($/oz)
Figure 4: Westgold Monthly AISC ($’m) & ($/oz)
■
Capital Expenditure
Capital expenditure during Q3 FY24 of $34M in-line with the prior quarter (Q2 FY24, $35M) with the
continued investment of the Great Fingall and Fender development projects. The remainder of the
capital expenditure is predominately for the ongoing expansion of the Bluebird, Big Bell and Starlight
underground mines, the CET Project, processing facility upgrades and camp infrastructure.
Exploration and resource development spend was approximately $6M for the quarter (Q2 FY24 - $4M).
This is tracking in line with the FY24 exploration expenditure guidance as Westgold continues to invest in
expansion with up to twelve underground and surface drill rigs operating across the business during the
quarter and for the discovery of organic growth opportunities within its extensive tenement holdings.
March 2024 Quarterly Report
9
Bryah Operation
Westgold’s Bryah Operation is underpinned by the Starlight underground mine supplying ore to the Fortnum
processing hub. Fortnum throughput is also supplemented with previously mined regional open pit ore and
surface stocks (see Figure 5).
Figure 5: Westgold’s Bryah Operation
The Bryah Operations produced 12,960oz in Q3 FY24 (Q2 FY24 – 15,866oz) at an AISC of $2,254/oz (Q2 –
$1,804/oz).
Figure 6 below summarises the key outputs and costs by quarter at the Bryah Operation.
March 2024 Quarterly Report
10
2,500
2,414
2,271
2,254
2,256
30,000
2,000
25,000
1,804
1,500
1,000
11,904
20,000
15,866
13,212
12,960
11,025
15,000
10,000
500
0
35,000
5,000
Q3 FY23
Q4 FY23
Q1 FY24
Produc�on (oz)
Q2 FY24
Q3 FY24
0
AISC/oz ($/oz)
Figure 6: Bryah Gold Production and AISC
■
Fortnum Processing Hub
Throughput and grade at the Fortnum processing hub was below target due to a failure in the primary
crusher during the rain events. 185,842t of ore was processed in the quarter (Q2 FY24 – 199,570t) at a
grade of 2.3g/t Au (Q2 FY24 – 2.6g/t) and 95% metallurgical recovery, resulting in 12,960oz of gold being
produced (Q2 FY24 – 15,866oz). Whilst the crusher was unavailable, low-grade stocks were fed through
the emergency feeder which is significantly slower. The crusher was repaired and returned to service
later in the quarter.
■
Starlight Underground
The mine produced 140,315t (Q2 FY24 – 147,009t) of ore at a grade of 2.6g/t Au (Q2 FY24 – 3.1g/t) for
11.7koz mined (Q2 FY24 – 14.6koz).
Recent drilling in the region of Nightfall, has shown that additional stoping opportunities exist. Further
development on the next level has confirmed the continuation of these high grade lodes and this will
assist in increasing mine production going forward. Higher grade Nightfall ore is expected to increase in
the blend during Q4 as an additional development crew was mobilised in February to accelerate access
to Nightfall.
■
Near Mine Exploration and Development
Three underground diamond drill rigs continue to operate at Starlight. Drilling works remain focussed on
resource definition in the Nightfall zone both at depth and crucially along strike where the
mineralisation remains open and significant grades and widths of mineralisation are being
encountered.
Better results seen during the current quarter from this work include:
■
■
11.46m at 5.58g/t Au from 74m in NF1125RD03; and
26.35m at 4.41g/t Au from 201m in NF1125RD06.
March 2024 Quarterly Report
11
The growth of Nightfall along strike offers a meaningful opportunity to reduce vertical advance rates
and thereby lessen the capital intensity of the mine, further enhancing the strong commercial
performance currently being produced by Starlight.
Along with the focus on Nightfall, drilling continues at Starlight, defining lodes ahead of the mining front,
with results such as 6.55m at 20.91g/t Au from 118m in ST915GC50 suggesting upside to the near-term
mine plan.
Figure 7: Starlight schematic long-section showing significant intersections.
Work is also continuing in the Peak Hill area. The Westgold Five Ways Mineral Resource Estimate has
been completed and is now with Mine Planning for review. Resource development work is now
progressing at the Harmony project.
Refer to Appendix A for details of significant drilling results from Fortnum.
March 2024 Quarterly Report
12
Murchison Operations
The Murchison Operations comprise of three operating underground mines (Big Bell, Bluebird and Fender),
one mine in development (Great Fingall) and two existing processing hubs (the 1.6-1.8Mtpa Bluebird plant at
Meekatharra and the 1.4Mtpa Tuckabianna plant near Cue).
The combined Murchison Operations produced 39,140oz at an AISC of $2,569/oz. The lower production
compared to the prior quarter (see Figure 8) resulted from unplanned downtime from a crusher failure at
Tuckabianna, disruptions to ore haulage (road closures) and high reliance on low grade stockpile feed.
3,000
2,500
2,000
1,500
1,000
500
0
-500
-1,000
-1,500
-2,000
-2,500
-3,000
2,569
2,016
1,662
1,867
100,000
90,000
2,407
80,000
70,000
48,609
55,165
60,000
52,080
43,372
39,140
50,000
40,000
30,000
20,000
10,000
Q3 FY23
Q4 FY23
Q1 FY24
Produc�on (oz)
Q2 FY24
Q3 FY24
0
AISC/oz ($/oz)
Figure 8: Murchison Gold Production and AISC
Meekatharra
The Bluebird processing hub treats ore from the Paddy’s Flat, Bluebird and Big Bell underground mines, plus
various surface stockpiles in the region (refer Figure 9).
■
Bluebird Processing Hub
The Bluebird processing hub produced 23,002oz (Q2 FY24 – 23,548oz) by processing 357,955t of ore (Q2
FY24 – 350,998). Lower grade ore feed from the Paddy’s Flat along with increased volumes from lower
grade stockpiles contributed to lower mill feed grades in Q3 (2.2g/t Au vs Q2 FY24 2.4g/t). Rain and
subsequent road closures impacted the ability to deliver higher grade stocks at volumes sufficient to run
the mill at full rates. Recovery was steady at 89%.
March 2024 Quarterly Report
13
Figure 9: Murchison Operations
■
Bluebird Underground
The Bluebird mine produced 103,207t at 4.0g/t Au for the quarter.
Bluebird’s ore production decreased quarter on quarter (Q2 FY24 – 126,752t), partially offset by a 21%
increase to mined grade (Q2 FY24 – 3.3g/t). The high levels of stope dilution seen in the prior quarter
resulted in changes being implemented to the mine plan which have delivered higher grades as the mine
transitions to a longer term solution that ensures stability of voids and steady mining rates.
Heavy rains during the quarter also impacted the ability to access high grade development headings with
the declines taking significant time to dewater and reinstate access.
March 2024 Quarterly Report
14
■
Bluebird Near Mine Exploration and Development
Westgold’s significant investment in drilling at Bluebird – South Junction paid dividend during the quarter
with the announcement of an interim Mineral Resource Estimate for the combined system of 6.4Mt at
3.1g/t for 827koz (refer ASX - Bluebird-South Junction Increases to 6.4Mt at 3.1 g/t Au 16 April 2024). This
figure represents a half a million-ounce increase in the Mineral Resource of Bluebird – South
Junction, post nine months of mining depletion.
Supporting this interim Mineral Resource Estimate were results from the ongoing five drill rig program at
Bluebird – South Junction such as;
■
■
■
10.45m at 3.80g/t Au from 788m and 3.98m at 10.80g/t Au from 894.49m in 24SJDD001
28.9m at 3.59g/t Au from 244.64m in 24BLDD015 and;
20.4m at 5.12g/t Au from 278.9m in 24BLDD017.
In conjunction with the programme to better define the South Junction opportunities, works to expedite
the understanding of the Bluebird North mining area are underway with increased development focus on
an exploration decline.
Figure 10: Bluebird schematic long-section showing significant intersections.
■
Paddy’s Flat Underground
The Paddy’s Flat mine produced 35,796t at 3.1 g/t Au for the quarter.
As mentioned in the Q2 report, Westgold planned to transition Paddy’s Flat into an exploration phase
post pausing mining in Q3. The mine continued to underperform during this transition period and mining
was stopped ahead of schedule, with only exploration drilling activities occurring in March.
March 2024 Quarterly Report
15
■
Paddy’s Flat Near Mine Exploration and Development
As Paddy’s Flat has entered a period of operational pause, the on-site technical team is focused on
exploration works, that if successful, could identify a 3-4 year optimised mine plan which will allow a
confident re-start of mining operations. Underground drilling works are ongoing, with a focus this quarter
on defining repeats of high-grade thrust lodes both above and below currently defined mineralisation in
the Vivian’s area of the mine, and on extending mineralisation in the Mudlode area.
Results returned from these efforts in the Mudlode area include:
■
■
5.33m at 24.87g/t Au from 0m in 23MUDD398; and
1.32m at 365.24g/t Au from 90m in 23MUDD403.
Pleasingly drilling also intersected what is interpreted to be a previously unrecognised high-grade thrust
above the Avon lode:
■
2.35m at 278.9g/t Au from 73m in 24VIDD009.
Figure 11: Paddy’s Flat schematic long-section showing significant intersections.
In parallel, a global Mineral Resource Estimate for the entire Paddy’s Flat system in underway,
incorporating learnings gain during the past nine years of mining operations. Upon completion this
review will extend into the Paddy’s Flat North zone where Westgold is yet to undertake meaningful
geological or technical work.
Refer to Appendix B for details of significant drilling results from Meekatharra.
March 2024 Quarterly Report
16
Cue
Westgold’s Tuckabianna processing hub treats ore from the Big Bell underground mine at Cue, supplemented
with regional open pit ore and surface stocks.
■
Tuckabianna Processing Hub
The Tuckabianna processing hub produced 16,138oz of gold in Q3 FY24 (Q2 FY24 – 19,824oz).
The hub processed 321,923t of ore, similar to the prior quarter (Q2 FY24 – 321,153t) at a lower grade of
1.8 g/t Au (Q1 FY24 2.3g/t) with an improved metallurgical recovery of 86% (Q2 FY24 – 84%). Access to
higher grade ore was at times restricted by a secondary crusher failure and rain affected road closures.
Larger volumes of low-grade stockpiles were processed as a result, lowering head grade quarter on
quarter.
The crusher failure impacted throughput for 9 days and immediately followed a planned crushing circuit
shutdown to refurbish the fine ore bin. The failure took significant time to rectify with the mill restarted on
a lower throughput than back to full operations from mid-March.
■
Big Bell Underground
The Big Bell mine produced 253,058t at 2.0 g/t Au for the quarter.
Production rate and grades were both marginally lower in Q3 FY24 (Q2 FY24 – 274,566t at 2.5g/t Au). The
lower grades were in line with expectation whilst mining predominantly from the lower grade south side
of the cave. Westgold will commence mining the next level of the cave in the middle of Q4, which should
result in higher grades being mined from Bi