2025 Mineral Resource Estimate and Ore Reserves
Released
Released
Announcement PDF
ASX Announcement
3 September 2025
2025 MINERAL RESOURCE ESTIMATE AND ORE RESERVES
With current milling capacity of 5.7 Mtpa, Westgold has an estimated
Reserve life of approximately 10 years
Perth, Western Australia, 3 September 2025: Westgold Resources Limited (ASX | TSX: WGX,
Westgold or the Company) is pleased to provide its updated Mineral Resource Estimate and
Ore Reserve Statement calculated as at 30 June 2025.
Group Gold Mineral Resource
Estimate and Ore Reserves
At 30 June 2025
Total Mineral Resource Estimate
231 Mt at 2.18 g/t Au for 16.3 Moz of gold
Total Ore Reserves
56 Mt at 1.93 g/t Au for 3.5 Moz of gold
Highlights
24% increase in Mineral Resource – growing to 16.3 Moz post mining depletion (up from
13.2 Moz in FY24)
5% increase in Ore Reserves – lifting to 3.5 Moz post mining depletion.
Southern Goldfields Milestone - 2.3 Moz Stage 1 Fletcher Zone Maiden Mineral
Resource Estimate (at Beta Hunt)
Murchison Milestones - Bluebird – South Junction’s Mineral Resource grows to 1.3 Moz
(up 35% year-on-year post mining depletion). Starlight’s Mineral Resource grows to
866 koz (a 46% increase year-on-year post-depletion.)
Ore Reserves Increase at Major Murchison mines: Bluebird – South Junctions Ore
Reserve up 90% to 528 koz and Starlight up 94% to 250 koz post mining depletion.
Reserve life continues to grow - with a total milling capacity of 5.7 Mtpa, Westgold has
an estimated Reserve life of approximately 10 years
Nineteen drill rigs operating - on surface and underground across the 3,200km2 portfolio
$50M to be invested in exploration and resource development in FY26.
Westgold Resources Limited
ABN 60 009 260 306
ASX | TSX: WGX
T: +61 8 9462 3400
E: perth.reception@westgold.com.au
W: westgold.com.au
Level 6, 200 St Georges Terrace
Perth WA 6000
PO Box 7068, Cloisters Square WA 6850
Westgold Managing Director and CEO Wayne Bramwell commented:
“In FY25 Westgold invested $43M in resource development and exploration across our portfolio.
This investment delivered significant growth in Group Mineral Resources, most notably with the
maiden Fletcher Mineral Resource of 2.3 Moz 1, and a material uplift in Group Ore Reserves.
Importantly, our Mineral Resource and Ore Reserve growth has been created whilst concurrently
investing in critical mine infrastructure across our Murchison and Southern Goldfields mines.
This investment has now established a sustainable platform for long term cashflow generation
over a 10-year Group Ore Reserve life.
Westgold will continue to drill and invest in organic growth through exploration, resource
definition and Mineral Resource conversion across our portfolio. We unlocked value for our
shareholders and stakeholders in FY25 and are confident in our team’s ability to create
additional value from two of Western Australia’s most productive goldfields.”
2025 Mineral Resource Estimate
As of 30 June 2025, the total gold Mineral Resource Estimate for the Westgold business was
231Mt at 2.18 g/t Au for 16.3 Moz of gold.
This represents 24% growth in the Company’s gold Mineral Resource base year on year
underpinned by a focused campaign of exploration and resource definition drilling over FY25,
where Westgold invested $43M on top of the $25M invested in FY24.
2.39
2.10
2.11
2.17
2.14
2.22
2.29
2.24
16,257
13,160
9,857
FY17
9,345
FY18
9,118
FY19
Resource Grade (g/t)
8,799
FY20
7,947
FY21
Southern Goldfields Resource (Koz)
7,940
FY22
2.18
8,250
FY23
6,588
4,650
8,511
9,669
FY24
FY25
Murchison Resource (Koz)
Figure 1 – Westgold annual Mineral Resource progression.
The entire 3.1 Moz increase in Westgold’s reportable Mineral Resource Estimate has been driven
by resource development activities in both Westgold’s current mines and across its broader
asset package.
This significant growth highlights the latent potential of Westgold’s Western Australian land
holdings.
1
Refer to ASX release titled “Fletcher Zone Maiden Mineral Resource of 2.3Moz” – 23 June 2025
2025 Mineral Resource Estimate and Ore Reserves
3 September 2025
2
The exploration and resource definition effort of FY25 has contributed to a:
■
990 koz (24%) increase in Mineral Resource at Westgold’s operating mines in the
Murchison post depletion;
■
2 Moz (72%) increase in Mineral Resource at Westgold’s operating mines in the
Southern Goldfields post depletion; and
■
the balance coming from non-operating assets resulting in a 3.1 Moz (24%) increase in
Mineral Resource across the Westgold’s portfolio.
The Murchison Operations incorporate the Bluebird, Tuckabianna and Fortnum processing hubs
and associated mines, while the Southern Goldfields Operations consists of the Higginsville
processing plant and the Beta Hunt and Two Boys mines.
Tables 1, 2 and 3 below depict the FY25 Mineral Resource Estimates for the Murchison and
Southern Goldfields Operations.
2025 Mineral Resource Estimate and Ore Reserves
3 September 2025
3
Table 1 – Gold Mineral Resource Estimates at 30 June 2025 for Westgold Operating Mines.
Murchison Gold Operations
Mineral Resource Statement - Rounded for Reporting
30/06/2025
Measured
Indicated
Measured and Indicated
Inferred
Total
Operating Mine
Tonnes
('000s)
Grade
Ounces
Au ('000s)
Tonnes
('000s)
Grade
Ounces
Au ('000s)
Tonnes
('000s)
Grade
Ounces
Au ('000s)
Tonnes
('000s)
Grade
Ounces Au
('000s)
Tonnes
('000s)
Grade
Ounces Au
('000s)
Big Bell UG
5,010
2.51
405
8,216
3.10
819
Big Bell Cave
6,553
1.09
229
0
0
0
13,226
2.88
1,224
7,414
2.90
691
6,553
1.09
229
0
0
0
20,640
2.89
1,915
6,553
1.09
229
Fender UG
111
2.91
10
168
2.62
14
280
2.74
25
157
2.54
13
437
2.67
37
Great Fingall UG
0
0.00
0
2,202
4.25
301
2,202
4.25
301
955
2.96
91
3,157
3.86
392
Golden Crown UG
0
0.00
0
540
5.25
91
540
5.25
91
2,279
3.05
224
2,819
3.47
315
Bluebird Group UG
334
3.94
42
7,251
2.99
697
7,585
3.03
739
6,644
2.59
553
14,229
2.83
1,293
Starlight UG
3,898
3.04
381
2,702
2.65
230
6,600
2.88
611
2,625
3.02
255
9,225
2.92
866
Total
15,906
2.09
1,067
21,079
3.18
2,152
36,986
2.71
3,220
20,075
2.83
1,827
57,060
2.75
5,047
Southern Goldfields Gold Operations
Mineral Resource Statement - Rounded for Reporting
30/06/2025
Measured
Tonnes
('000s)
Two Boys
Lake Cowan
Beta Hunt
Total
Operating Mine
Indicated
Grade
Ounces Au
('000s)
Tonnes
('000s)
94
5.94
18
180
1.90
11
10,435
2.37
10,709
2.39
Measured and Indicated
Grade
Ounces Au
('000s)
Tonnes
('000s)
256
3.15
26
129
1.29
5
795
13,140
2.23
824
13,525
2.24
2025 Mineral Resource Estimate and Ore Reserves
3 September 2025
Inferred
Grade
Ounces
Au ('000s)
Tonnes
('000s)
349
3.90
44
309
1.65
16
944
23,575
2.29
975
24,234
2.31
Total
Grade
Ounces Au
('000s)
Tonnes
('000s)
Grade
Ounces Au
('000s)
163
5.75
30
512
4.49
74
19
1.60
1
329
1.60
17
1,739
39,975
2.27
2,914
63,550
2.28
4,653
1,800
40,158
2.28
2,944
64,391
2.29
4,744
4
Table 2 – Gold Mineral Resource Estimates at 30 June 2025 for Westgold Non-Operating Projects.
Murchison Gold Operations
Mineral Resource Statement - Rounded for Reporting
30/06/2025
Measured
Indicated
Tonnes
('000s)
Grade
Ounces
Au
('000s)
Big Bell District
38
2.82
Cuddingwarra
85
1.66
Day Dawn District
58
Tuckabianna
Tuckabianna Stockpiles
Meekatharra North
Measured and Indicated
Tonnes
('000s)
Grade
Ounces
Au
('000s)
3
771
2.61
5
1,600
1.63
1.73
3
1,054
267
3.54
30
83
2.76
7
0
0.00
0
Nannine
68
2.55
Paddy's Flat
376
3.67
Reedy's
430
3.77
Yaloginda District
53
Bluebird Stockpiles
132
Fortnum District
Inferred
Total
Tonnes
('000s)
Grade
Ounces
Au ('000s)
Tonnes
('000s)
Grade
Ounces
Au
('000s)
65
809
2.62
68
1,843
2.94
174
2,652
2.84
242
84
1,685
1.63
88
597
1.50
29
2,282
1.59
117
1.99
68
1,112
1.98
71
1,036
1.82
60
2,148
1.90
131
3,448
2.78
308
3,715
2.84
339
2,899
2.63
245
6,614
2.75
584
3,648
0.71
83
3,731
0.75
90
0
0.00
0
3,731
0.75
90
97
1.98
6
97
1.98
6
75
2.11
5
172
2.04
11
6
859
2.06
57
927
2.09
62
340
2.26
25
1,267
2.14
87
44
10,641
1.65
564
11,017
1.72
608
2,574
1.93
160
13,591
1.76
768
52
3,225
2.58
267
3,656
2.72
319
9,191
2.54
750
12,846
2.59
1,069
2.62
4
4,237
1.48
202
4,290
1.50
206
5,808
1.38
257
10,098
1.43
463
3.13
13
0
0.00
0
132
3.13
13
0
0.00
0
132
3.13
13
1,707
2.56
141
4,062
1.89
246
5,769
2.09
387
1,172
1.44
54
6,942
1.98
441
Horseshoe
0
0.00
0
1,266
2.09
85
1,266
2.09
85
183
1.43
8
1,449
2.01
93
Peak Hill
0
0.00
0
7,547
1.55
376
7,547
1.55
376
1,838
1.78
105
9,385
1.60
481
FGO Stockpiles
559
1.01
18
481
0.69
11
1,039
0.86
29
16
0.54
0
1,056
0.86
29
Total
3,857
2.64
328
42,937
1.75
2,421
46,794
1.83
2,749
27,572
2.11
1,873
74,365
1.93
4,622
Project
2025 Mineral Resource Estimate and Ore Reserves
3 September 2025
Tonnes
('000s)
Grade
Ounces
Au ('000s)
5
Southern Goldfields Gold Operations
Mineral Resource Statement - Rounded for Reporting
30/06/2025
Measured
Indicated
Measured and Indicated
Inferred
Total
Tonnes
('000s)
Grade
Ounces
Au ('000s)
Tonnes
('000s)
Grade
Ounces
Au ('000s)
Tonnes
('000s)
Grade
Ounces
Au ('000s)
Tonnes
('000s)
Grade
Ounces
Au ('000s)
Tonnes
('000s)
Grade
Ounces
Au ('000s)
931
2.94
88
2,442
2.74
215
3,373
2.80
303
1,519
2.91
142
4,892
2.83
445
HGO Greater
414
3.16
42
2,871
2.78
257
3,286
2.83
299
2,128
2.29
157
5,414
2.62
456
Mt Henry
11,042
1.19
424
10,172
1.16
378
21,214
1.18
802
2,565
1.28
106
23,779
1.19
907
HGO Stockpiles
1,162
0.77
29
276
0.74
7
1,439
0.77
36
0
0.00
0
1,439
0.77
36
BHO Stockpiles
9
1.88
1
0
0.00
0
9
1.88
1
0
0.00
0
9
1.88
1
13,559
1.34
583
15,761
1.69
856
29,320
1.53
1,440
6,212
2.03
405
35,532
1.61
1,844
Project
HGO Central
Total
Table 3 – Nickel Mineral Resource Estimates at 30 June 2025 for Beta Hunt.
Beta Hunt Nickel Operations
Mineral Resource Statement - Rounded for Reporting
30/06/2025
Measured
Indicated
Measured and Indicated
Inferred
Total
Tonnes
('000s)
Ni (%)
NiT
('000s)
Tonnes
('000s)
Ni (%)
NiT
('000s)
Tonnes
('000s)
Ni (%)
NiT
('000s)
Tonnes
('000s)
Ni (%)
NiT
('000s)
Tonnes
('000s)
Ni (%)
NiT
('000s)
Beta Hunt
0
0.0
0
749
2.8
21
749
2.8
21
499
2.7
13
1,248
2.8
35
Total
0
0.0%
0
749
2.8%
21
749
2.8%
21
499
2.7%
13
1,248
2.8%
35
Project
See Figure 2, Figure 3 and Figure 4 for location details. Additional detailed information relating to generation of the Mineral Resource Estimates is
attached in Appendix B & C Table 1 – JORC 2012 Reporting Criteria.
2025 Mineral Resource Estimate and Ore Reserves
3 September 2025
6
Figure 2 - Murchison Project Areas (Bluebird & Tuckabianna Processing Hubs).
2025 Mineral Resource Estimate and Ore Reserves
3 September 2025
7
Figure 3 - Murchison Project Areas (Fortnum Processing Hub)
2025 Mineral Resource Estimate and Ore Reserves
3 September 2025
8
Figure 4 – Southern Goldfields Project Area (Higginsville Processing Hub).
Material year-on-year changes to the Westgold gold Mineral Resource Estimate include:
■
Declaration of a maiden Stage 1 Fletcher Mineral Resource Estimation
o
■
Expansion of the Bluebird – South Junction Mineral Resource at Meekatharra
o
■
+31 Mt at 2.3 g/t Au for 2.3 Moz Au.
+332 koz year-on-year.
Expansion of the Starlight Mineral Resource at Fortnum
o
+274 koz year-on-year.
2025 Mineral Resource Estimate and Ore Reserves
3 September 2025
9
■
Mining depletions in Westgold’s larger mines including:
o
Starlight - 62 koz;
o
Bluebird - South Junction - 41 koz;
o
Big Bell - 76 koz; and
o
Beta Hunt - 114 koz.
The year-on-year gold Mineral Resource Estimate inventory change is shown in Figure 5.
+24%
3,454
16,257
Mineral Resource (koz)
2,090
1,364
13,160
(345)
FY24 Mineral
Resource
Depletion
Resource additions
(13)
Stockpile
Changes
Murchison
Res. Dev
activity &
model updates
FY25 Mineral
Resource
Southern Goldfields
Figure 5 – FY25 Mineral Resource substantially increased through resource development
activities.
Geology
Murchison
The Meekatharra Gold operation is in the Archean Murchison Province, a granite-greenstone
terrane in the northwest of the Yilgarn Craton. Greenstone belts trending north-northeast are
separated by granite-gneiss domes, with smaller granite plutons also present within or on the
margins of the belts.
The Paddy’s Flat area is located on the western limb of a regional fold, the Polelle Syncline, within
a sequence of mafic to ultramafic volcanics with minor interflow sediments and banded ironformation. The sequence has also been intruded by felsic porphyry dykes prior to mineralisation.
2025 Mineral Resource Estimate and Ore Reserves
3 September 2025
10
Mineralisation is located along four sub-parallel trends at Paddy’s Flat and can be comprised of
sulphide replacement BIF hosted gold, quartz vein hosted shear-related gold and quartzcarbonate-sulphide stockwork vein and alteration related gold.
The Yaloginda area which hosts Bluebird – South Junction, is a gold-bearing Archean greenstone
belt situated ~15km south of Meekatharra. The deposits in the area are hosted in a strained and
metamorphosed volcanic sequence that consists primarily of ultramafic and high-magnesium
basalt with minor komatiite, peridotite, gabbro, tholeiitic basalt and interflow sediments.
The sequence was intruded by a variety of felsic porphyry and intermediate sills and dykes.
The Reedy’s mining district is located approximately 50 km to the south-east to Meekatharra and
to the south of Lake Annean. The Reedy gold deposits occur within a north-south trending
greenstone belt, two to five kilometres wide, composed of volcano-sedimentary sequences and
separated multiphase syn- and post-tectonic granitoid complexes.
The Cue Gold Operations are in the Archean Murchison Province, a granite-greenstone terrane
in the northwest of the Yilgarn Craton. Greenstone belts trending north-northeast are separated
by granite-gneiss domes, with smaller granite plutons also present within or on the margins of
the belts.
Mineralisation at Big Bell is hosted in the shear zone (Mine Sequence) and is associated with the
post-peak metamorphic retrograde assemblages. Stibnite, native antimony and trace
arsenopyrite are disseminated through the K-feldspar-rich lode schist. These are intergrown with
pyrite and pyrrhotite and chalcopyrite. Mineralisation outside the typical Big Bell host rocks
(KPSH), for example 1,600N and Shocker, also display a very strong W-As-Sb geochemical halo.
Numerous gold deposits occur within the Cuddingwarra Project area, the majority of which are
hosted within the central mafic-ultramafic ± felsic porphyry sequence. Within this broad
framework, mineralisation is shown to be spatially controlled by competency contrasts across,
and flexures along, layer-parallel D2 shear zones, and is maximised when transected by
corridors of northeast striking D3 faults and fractures.
The Great Fingall Dolerite hosts the majority gold mineralisation within the portion of the
greenstone belt proximal to Cue (the Day Dawn Project Area). Unit AGF3 is the most brittle of all
the five units and this characteristic is responsible for its role as the most favourable lithological
host to gold mineralisation in the Greenstone Belt.
The Fortnum deposits are Paleoproterozoic shear-hosted gold deposits within the Fortnum
Wedge, a localised thrust duplex of Narracoota Formation within the overlying Ravelstone
Formation. Both stratigraphic formations comprise part of the Bryah Basin in the Capricorn
Orogen, Western Australia.
The Horseshoe Cassidy deposits are hosted within the Ravelstone Formation (siltstone and
argillite) and Narracoota Formation (highly altered, moderate to strongly deformed mafic to
ultramafic rocks). The main zone of mineralisation is developed within a horizon of highly altered
magnesian basalt.
2025 Mineral Resource Estimate and Ore Reserves
3 September 2025
11
Gold mineralisation is associated with strong vein stock works that are confined to the altered
mafic. Alteration consists of two types: stockwork proximal silica-carbonate-fuchsitehaematite-pyrite and distal silica-haematite-carbonate+/- chlorite.
The Peak Hill district represents remnants of a Proterozoic fold belt comprising highly deformed
trough and shelf sediments and mafic / ultramafic volcanics, which are generally moderately
metamorphosed (except for the Peak Hill Metamorphic Suite).
Southern Goldfields
The Beta Hunt Gold Operations are situated within the central portion of the Norseman-Wiluna
greenstone belt in a sequence of mafic / ultramafic and felsic rocks on the southwest flank of the
Kambalda Dome. Gold mineralisation occurs mainly in sub-vertical shear zones in the Lunnon
Basalt and is characterised by shear and extensional quartz veining within a halo of biotite / pyrite
alteration.
Within these shear zones, coarse gold sometimes occurs where the shear zones intersect ironrich sulphidic metasediments in the Lunnon Basalt or nickel sulphides at the base of the
Kambalda Komatiite (ultramafics). The mineralised shears are represented by the A-Zone,
Western Flanks, Fletcher, Larkin and Mason zones.
The Higginsville Gold Operation is in the Eastern Goldfields Superterrane of the Archean Yilgarn
Craton. The bulk of the Higginsville tenement package is located almost entirely within the wellmineralised Kalgoorlie Terrane, between the gold mining centres of Norseman and St. Ives. HGO
can be sub-divided into seven major geological domains: Trident Line of Lode, Chalice, Lake
Cowan, Southern Paleo-channels, Mount Henry, Polar Bear Group and Spargo’s Project area.
The majority of mineralisation along the Trident Line of Lode are hosted within the Poseidon
gabbro and high-MgO dyke complexes in the south. The Poseidon Gabbro is a thick, weaklydifferentiated gabbroic sill, which strikes north-south and dips 60° to the east, is over 500 m thick
and 2.5 km long. The mineralisation is hosted within or marginal to quartz veining and is
structurally and lithologically controlled.
The Chalice deposit is located within a north-south trending, 2 km to 3 km wide greenstone
terrane, flanked on the west by calc-alkaline granitic rocks of the Boorabin Batholith and to the
east by the Pioneer Dome Batholith. The dominant unit that hosts gold mineralisation is a finegrained, weak to strongly-foliated amphibole-plagioclase amphibolite, with a typically
lepidoblastic (mineralogically aligned and banded) texture. It is west-dipping and generally
steeply oriented (approximately 60° to 75°).
The Lake Cowan project area is situated near the centre of a regional anticline between the
Zuleika and Lefroy shears, with the local geology of the area made more complex by the intrusion
of the massive Proterozoic Binneringie dyke. The majority of mineralisation at the Lake Cowan
Mining Centre is hosted within an enclave of Archaean material surrounded by the Binneringie
dyke.
2025 Mineral Resource Estimate and Ore Reserves
3 September 2025
12
Mineralised zones within the Southern Paleo Channels network comprise both placer gold,
normally near the base of the channel-fill sequences, and chemically precipitated secondary
gold within the channel-fill materials and underlying saprolite. These gold concentrations
commonly overlie, or are adjacent to, primary mineralised zones within Archaean bedrock.
The Mount Henry Project covers 347km2 of the prolific South Norseman‐Wiluna Greenstone belt
of the Eastern Goldfields in Western Australia. Although the greenstone rocks from the
Norseman area can be broadly correlated with those of the Kalgoorlie – Kambalda region, they
form a distinct terrain which is bounded on all sides by major regional shears.
The Norseman Terrane has prominent Banded Iron Formations (BIF) which distinguish it from the
Kalgoorlie– Kambalda Terrane. The Mount Henry gold deposit is hosted by a silicate facies BIF
unit within the Noganyer Formation. Gold mineralisation is predominantly hosted within the BIF
unit but is also associated with minor meta‐basalt and dolerite units that were mostly emplaced
prior to mineralisation. The footwall to the BIF is characterised by a sedimentary schistose unit
and the hanging wall by the overlying dolerites of the Woolyeener Formation. The Mount Henry
gold deposit is classified as an Archean, orogenic shear hosted deposit. The main lode is an
elongated, shear‐hosted body, 1.9 km long by 6 – 10 metres wide and dips 65‐75 degrees towards
the west.
The Polar Bear project is situated within the Archaean Norseman-Wiluna Belt which locally
includes basalts, komatiites, metasediments, and felsic volcaniclastics. The primary gold
mineralisation is related to hydrothermal activity during multiple deformation events. Indications
are that gold mineralisation is focused on or near to the stratigraphic boundary between the
Killaloe and Buldania Formation.
The Spargo’s Project occurs within Coolgardie Domain of the Kalgoorlie Terrane. The area is
bounded by the Zuleika Shear to the east and the Kunanalling Shear to the west. The geological
setting comprises tightly-folded, north-south striking ultramafic and mafic volcanic rocks at the
northern closure Widgiemooltha Dome.
The project lies on the general trend of the Kunanalling / Karramindie Shear corridor, a regional
shear zone that hosts significant mineralisation to the north at Ghost Crab (Mount Marion),
Wattle Dam to the south, the Penfolds group and Kunanalling. The regional prospective Zuleika
Shear lies to the east of the project. The tenements are prospective for vein and shear-hosted
gold deposits as demonstrated by Spargo’s Reward and numerous other gold workings and
occurrences.
Gold mineralisation at Spargo’s Reward is hosted by a coarse-grained pyrite-arsenopyrite lode in
quartz-sericite schists, between strongly biotitic altered greywacke to the east and quartzsericite-fuchsite-pyrite altered felsic tuff to the west. Gold mineralisation is associated with very
little quartz veining which is atypical for many deposits in region. The Spargo’s Reward setting
has been described variously as a low-quartz sulphidic mesothermal gold system or as a Hemlo
style syn-sedimentary occurrence.
2025 Mineral Resource Estimate and Ore Reserves
3 September 2025
13
Background to the Mineral Resource Estimate
Geological interpretation of individual deposits is carried out using a systematic approach to
ensure that the resultant Mineral Resource Estimates are both sufficiently constrained, and
representative of the expected sub-surface conditions. In all aspects of Mineral Resource
Estimation, the factual and interpreted geology is used to guide the development of the
interpretation. Geological matrixes were established to assist with interpretation and
construction of the estimation domains.
A significant portion of the data used in Mineral Resource Estimations has been gathered from
diamond core. Multiple sizes have been used. This core is geologically logged and subsequently
halved for sampling. Grade control holes may be whole-cored to streamline the core handling
process if required. Face sampling data is also utilised, where each development face / round is
chip sampled. The sampling intervals are domained by geological constraints (e.g. rock type,
veining and alteration / sulphidation etc.).
All geology input is logged and validated by the relevant area geologists, incorporated into this is
assessment of sample recovery. No defined relationship exists between sample recovery and
grade. Nor has sample bias due to preferential loss or gain of fine or coarse material been noted
at any deposit.
Faces are nominally chipped horizontally across the face from left to right, or vertically from top
to bottom, sub-set via geological features as appropriate. Diamond drilling is half-core niche
sampled (or whole-cored if appropriate), sub-set via geological features as appropriate.
Samples undergo fine pulverisation of the entire sample by an LM5 type mill to achieve a 75µ
product prior to splitting. QA/QC is currently ensured during the sub-sampling stages process
via the use of the systems of an independent NATA / ISO accredited laboratory contractor. The
sample size is considered appropriate for the grain size of the material being sampled. The unsampled half of diamond core is retained for check sampling if required.
Sampling is analysed for gold by fire assay where a 40g – 50g sample undergoes fire assay lead
collection followed by flame atomic adsorption spectrometry. Quality control is ensured via the
use of standards, blanks and duplicates. The laboratory includes a minimum of 1 project
standard with every 22 samples analysed. No significant QA/QC issues have arisen in recent
drilling results.
Photon Assay was introduced in 2023 for Beta Hunt gold grade control samples. PhotonAssay™
technology (Chrysos Corporation Limited) is a rapid, non-destructive analysis of gold and other
elements in mineral samples. It is based on the principle of gamma activation, which uses high
energy x-rays to excite changes to the nuclear structure of selected elements. The decay is then
measured to give a gold analysis. Each sample is run through two cycles with a radiation time of
15s. This methodology is insensitive to material type and thus does not require fluxing chemicals
as in the fire assay methodology. This technique was discontinued in 2024.
Nickel analyses have been completed by 4 acid digest and final analysis using ICP-OES.
2025 Mineral Resource Estimate and Ore Reserves
3 September 2025
14
After validating the drillhole data to be used in the estimation, interpretation of the orebody is
undertaken to create the intervals which form the basis of the three-dimensional orebody
wireframe. Wireframing is then carried out using a combination of automated modelling
algorithms and manual triangulation to create an accurate three-dimensional representation of
the sub-surface mineralised body.
Drillhole intersections within the mineralised body are then used to flag the appropriate sections
of the drillhole database tables for compositing purposes. Drillholes are subsequently
composited to allow for grade estimation. In all aspects of resource estimation, the factual and
interpreted geology was used to guide the development of the interpretation.
Once the sample data has been composited, a statistical analysis is undertaken to assist with
determining estimation search parameters, top-cuts etc. Analysis of individual domains is
undertaken to assist with determining appropriate search parameters. Which are then
incorporated with observed geological and geometrical features to determine the most
appropriate search parameters.
An empty block model is then created for the area of interest. This model contains attributes set
at background values for the various elements of interest as well as density, and various
estimation parameters that are subsequently used to assist in resource categorisation. The
block sizes used in the model will vary depending on orebody geometry, minimum mining units,
estimation parameters and levels of informing data available.
Grade estimation is then undertaken. Ordinary Kriging estimation method is considered as
standard, although Categorical Indicator Kriging is used in some instances. Estimation results
are validated against primary input data, previous estimates and mining output.
The Mineral Resource is then depleted for mining voids and subsequently classified in line with
JORC guidelines utilising a combination of various estimation derived parameters and geological
/ mining knowledge.
Data spacing is variable dependent upon the individual lode under consideration.
This approach considers all relevant factors and reflects the Competent Person’s view of the
deposit.
The cut off grades used for the reporting of the Mineral Resources Estimates is selected based
upon the style of mineralisation, depth from surface of the mineralisation and the most probable
extraction technique and associated costs.
Likely mining approaches have been considered at the domaining, estimation and classification
steps. However, no mining dilution or ore loss has been modelled in the resource model or
applied to the reported Mineral Resource Estimate. Nor has metallurgical recovery been applied
to the reported Mineral Resource Estimate.
These factors are applied during the Ore Reserve generation process.
2025 Mineral Resource Estimate and Ore Reserves
3 September 2025
15
Figure 6 – Big Bell Mineral Resource Schematic FY25.
2025 Mineral Resource Estimate and Ore Reserves
3 September 2025
16
Figure 7 – Fender Mineral Resource Schematic FY25.
2025 Mineral Resource Estimate and Ore Reserves
3 September 2025
17
Figure 8 – Great Fingall Mineral Resource Schematic FY25.
2025 Mineral Resource Estimate and Ore Reserves
3 September 2025
18
Figure 9 – Bluebird – South Junction Mineral Resource Schematic FY25.
Figure 10 – Starlight Mineral Resource Schematic FY25.
2025 Mineral Resource Estimate and Ore Reserves
3 September 2025
19
Figure 11 – Beta Hunt Mineral Resource Schematic FY25.
2025 Mineral Resource Estimate and Ore Reserves
3 September 2025
20
Figure 12 – Fletcher Zone Mineral Resource Schematic FY25.
Westgold nickel Mineral Resources have remained static year-on-year.
2025 Mineral Resource Estimate and Ore Reserves
3 September 2025
21
2025 Ore Reserves
Figure 13 depicts Westgold’s cumulative production and Ore Reserves since 2017. As of 30 June
2025, the total Ore Reserve is 56Mt at 1.93 g/t Au for 3.5 Moz of gold.
This represents 5% growth in Westgold’s gold Ore Reserves sinc
Share your feedback
Discover