June Quarter FY23 Investor Update
Released
Released
Announcement PDF
WESTGOLD RESOURCES LIMITED
(ASX : WGX)
JUNE QUARTER FY23
WAYNE BRAMWELL
| MANAGING DIRECTOR
TOMMY HENG
| CFO
PHILLIP WILDING
| COO
MATTHEW PILBEAM
| GM EH&S
SIMON RIGBY
| GM EXPLORATION & GROWTH
26 JULY 2023
WWW.WESTGOLD.COM.AU
Disclaimer
COMPLIANCE STATEMENT
The information in this report that relates to Exploration Results is compiled by Westgold technical employees and contractors under the supervision of Mr. Simon Rigby B.Sc. (Hons), who is a member of the Australian Institute of Geoscientists. Mr Rigby is a full-time employee
of the company and has sufficient experience which is relevant to the styles of mineralisation and types of deposit under consideration and to the activities which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Rigby consents to the inclusion in this report of the matters based on his information in the form and context in which it appears. Mr Rigby is eligible to participate in short- and long-term incentive
plans of the company.
The information in this report that relates to Mineral Resource Estimates is compiled by Westgold technical employees and contractors under the supervision of Mr. Jake Russell B.Sc. (Hons), who is a member of the Australian Institute of Geoscientists. Mr Russell is a full time
employee of the Company, and has sufficient experience which is relevant to the styles of mineralisation and types of deposit under consideration and to the activities which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Russell consents to the inclusion in this report of the matters based on his information in the form and context in which it appears. Mr Russell is eligible to participate in short and long term
incentive plans of the company.
The information in this report that relates to Ore Reserve Estimates is based on information compiled by Mr. Leigh Devlin, B.Eng MAusIMM. Mr. Devlin has sufficient experience which is relevant to the styles of mineralisation and types of deposit under consideration and to
the activities which they are undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr. Devlin consents to the inclusion in this report of the matters based
on his information in the form and context in which it appears. Mr. Devlin is a full time senior executive of the Company and is eligible to, and may participate in short-term and long-term incentive plans of the Company as disclosed in its annual reports and disclosure
documents.
MINERAL RESOURCES AND ORE RESERVE ESTIMATES
Information in this presentation relating to Mineral Resource and Ore Reserve estimates is extracted from the ASX releases “Resources and Reserve Statement – Amended” dated 6 October 2022 and “Great Fingall Resource grows to half a million ounces” dated 31 May 2023.
Westgold confirms that it is not aware of any new information or data that materially affects the information included in these announcements and that all material assumptions and technical parameters underpinning the Mineral Resource and Ore Reserve estimates
continue to apply and have not materially changed. Westgold confirms that the form and context in which the competent persons’ findings are presented in this document have not been materially modified from the original market announcements
FORWARD-LOOKING STATEMENTS
These materials prepared by Westgold Resources Limited (or “the Company”) include forward-looking statements. Often, but not always, forward looking statements can generally be identified by the use of forward looking words such as “may”, “will”, “expect”, “intend”,
“plan”, “estimate”, “anticipate”, “continue”, and “guidance”, or other similar words and may include, without limitation, statements regarding plans, strategies and objectives of management, anticipated production or construction commencement dates and expected costs
or production outputs.
Forward-looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the Company’s actual results, performance and achievements to differ materially from any future results, performance or achievements. Relevant factors
may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and project development, including the risks of
obtaining necessary licenses and permits and diminishing quantities or grades of reserves, political and social risks, changes to the regulatory framework within which the Company operates or may in the future operate, environmental conditions including extreme weather
conditions, recruitment and retention of personnel, industrial relations issues and litigation.
Forward looking statements are based on the Company and its management’s good faith assumptions relating to the financial, market, regulatory and other relevant environments that will exist and affect the Company’s business and operations in the future. The Company
does not give any assurance that the assumptions on which forward looking statements are based will prove to be correct, or that the Company’s business or operations will not be affected in any material manner by these or other factors not foreseen or foreseeable by the
Company or management or beyond the Company’s control.
Although the Company attempts and has attempted to identify factors that would cause actual actions, events or results to differ materially from those disclosed in forward looking statements, there may be other factors that could cause actual results, performance,
achievements or events not to be as anticipated, estimated or intended, and many events are beyond the reasonable control of the Company. Accordingly, readers are cautioned not to place undue reliance on forward-looking statements. Forward-looking statements in these
materials speak only at the date of issue. Subject to any continuing obligations under applicable law or any relevant stock exchange listing rules, in providing this information the Company does not undertake any obligation to publicly update or revise any of the forwardlooking statements or to advise of any change in events, conditions or circumstances.
2
Achieved FY23 production and cost guidance
OPERATION
FY23 Group
Guidance
FY23
Q1
Q23
Q3
Q4
Production (oz)
240,000 -260,000 257,116
66,048
62,180
60,512
68,377
AISC ($/oz)
A$1,900-2,100
A$1,999
A$2,106
A$2,032
A$2,094
A$1,780
Growth Capital
($M)1
A$60
A$72
A$21
A$26
A$15
A$10
Exploration ($M)2
A$20
A$19
A$7
A$3
A$4
1. Growth Capital includes underground, camp and other growth-related project, property, plant and equipment costs
2. Exploration includes expenditure associated with all Murchison and Bryah tenure and includes FY23 Great Fingall and Caustons drilling
3. Q2 FY23 AISC and Growth Capital adjusted post audited Half-Year Financial Report for the period ended 31 December 2022
A$5
“Westgold’s outstanding Q4, FY23 results
demonstrate what our business can deliver when
our teams execute to plan.
Our momentum continues and this was the second
consecutive quarter where we built cash,
evidencing our cost out and business improvement
programmes are beginning to be effective.
We delivered the full year guidance as stated and
start FY24 from a position of financial strength.
With full exposure to the gold price from August
and our organic growth opportunities advancing
rapidly, we have growing confidence in our team’s
ability to expand the scale and profitability of the
business in the year ahead.”
Wayne Bramwell | Managing Director
3
Q4 FY23 Overview – Turnaround producing results
▪
Continued EH&S performance improvement – 7% reduction in TRIFR compared to Q3 and 63% reduction in FY23
▪
68,377oz of gold produced at All-In Sustaining Cost (AISC) of $1,780/oz - 13% increase in gold production and 15%
improvement in ASIC vs Q3
▪
Full year FY23 guidance met – with Westgold delivering top end of production guidance (257,116oz Au) at midpoint of AISC cost guidance ($1,999/oz Au)
▪
Bluebird and Big Bell mines outperformed, both achieving quarterly production records and generating material
net cash inflow
▪
Closing cash and liquid assets of $192M at quarter end – up $24M on previous quarter
▪
Positive mine operating cash flow of $64M – up $32M on previous quarter
▪
Nine (9) resource development and exploration drill rigs operating – with best intercepts to date including:
▪
5.19m at 30.91g/t Au from 231m (22BLDD259 – Bluebird)
▪
6.81m at 11.95g/t Au from 55m (23CNDD103 – Paddy’s Flat)
▪
5.50m @ 16.68g/t Au from 925m (GFD019_23W1 - Lower Fingall Reef)
▪
49% increase to Mineral Resource Estimate for Great Fingall to 588koz
▪
Takeover offer for Musgrave Minerals – declined to increase offer and all acceptances are now null and void
▪
Hedge position reduced to 10,000oz at quarter end – with fixed forward program complete in July
▪
Westgold remains debt free
4
Westgold TRIFR reduced by 63% in FY23
Westgold has reduced TRIFR by 63% in FY23
15
▪ Q4 – 8.37 from Q3 – 9.03
▪ Lost Time Injury Frequency Rate (LTIFR) remained
steady:
▪ Q4 – 0.64 from Q3 – 0.62
▪ High Potential Incident Frequency Rate (HiPoFR)
reduced slightly (down 4%)
▪ Zero Significant Environmental Incidents
Total Recordable Injury (TRI) count
▪ 7% decrease in Total Recordable Injury Frequency
Rate (TRIFR):
25
22.91
12
20
18.44
14.36
9
15
-7%
9.03
6
8.37
10
5
10
9
3
▪ Zero Significant Psychosocial Harm events
1.41
6
6
6
0.86
0.60
0.62
0.64
Q1 - FY23
Q2 - FY23
Q3 - FY23
Q4 - FY23
TRI
LTIFR
TRIFR
0
12 Month rolling Injury Frequency Rate
(injuries/million hours worked)
EH&S Performance Highlights for the Quarter:
-63%
0
Q4 - FY22
5
Hybrid power online – our new Tuckabianna facility
▪ The Tuckabianna hybrid facility replaces the diesel fired
power station and includes:
▪ 6 MW solar farm fitted with 11,088 photovoltaic panels
▪ battery energy storage system with 2.4 MW installed
capacity
▪ 9.5 MW gas-fuelled power station
▪ ~10ML of annual diesel fuel reduction
▪ ~15kt of CO2 equivalent emission reduction
▪ Tuckabianna is a the first of four hybrid power plants to be
installed, which together are expected to deliver:
▪ 38 million litre reduction per annum in diesel fuel usage
▪ 34% power generating capacity supplied by renewables
▪ 56% reduction in emissions
▪ ~A$60/oz AISC savings1
6
1.
At a diesel price assumption of $1.64/L.
WESTGOLD – 100% Western Australian
1,400 strong
workforce
1,300km2
tenure
4
underground
mines
3
processing
plants
Owner /
operator with
extensive
UG fleet
MURCHISON OPERATIONS
BRYAH OPERATIONS
7
Q4 in review - Production up, costs reduced and margin growing
+13%
68,377
66,048
13% improvement in gold production in Q4
62,180
Group production (oz)
▪ underpinned by throughput and grade
60,512
lifts at Big Bell and Bluebird mines
Q1 FY23
Q2 FY23
Q3 FY23
Q4 FY23
2,635
2,721
AISC for Q4 of $122M reduced by 4%
compared to Q3
▪
2,460
Achieved gold price ($/oz)
Higher gold production reduced AISC/oz
by 15% to $1,780/oz compared to Q3
▪
2,411
AISC Margin increased 74% to $941/oz
1,780
2,106
2,094
2,032
139
compared to Q3
AISC ($/oz)
-4%
127
126
122
AISC ($M)
Q1 FY23
1.
Q2 FY23 AISC adjusted post audited Half-Year Financial Report for the period ended 31 December 2022
Q2 FY23
1
Q3 FY23
Q4 FY23
8
Q4 Key metrics – Net mine cash flow up
▪ AISC of $122M reduced by 4%
▪ lower FY22 stockpile drawdown (monetisation) of
$0.1M with a build-up in the Murchison offset by a
drawdown in the Bryah (Q3: $4.8M)
▪ Capital expenditure of $10M this quarter (Q3: $15M)
▪ invested in growth and development predominately
for the expansion of Bluebird and Big Bell
▪ Exploration investment up with 9 rigs operating - $5M
(Q3: $4M)
▪ bringing the full year spend in line with FY23
exploration expenditure guidance
MURCHISON
JUN QTR
FY23
BRYAH
JUN QTR
FY23
GROUP
JUN QTR
FY23
GROUP
FY23
Physical Summary
ROM - UG Ore Mined
UG Grade Mined
Ore Processed
Head Grade
Recovery
Gold Produced
Gold Sold
Achieved Gold Price
Units
t
g/t
t
g/t
%
oz
oz
A$/oz
527,445
3.2
723,607
2.7
89%
55,165
53,623
2,721
163,137
2.5
194,569
2.2
95%
13,212
12,954
2,721
690,582
3.0
918,179
2.6
90%
68,377
66,577
2,721
2,943,418
2.8
3,625,035
2.5
90%
257,116
256,009
2,556
Cost Summary
Mining
Processing
Admin
Stockpile Movements
Royalties
Cash Cost (produced oz)
Corporate Costs
Sustaining Capital
All-in Sustaining Costs
A$/oz
A$/oz
A$/oz
A$/oz
A$/oz
A$/oz
A$/oz
A$/oz
A$/oz
980
423
96
(26)
103
1,576
24
63
1,662
926
545
110
118
72
1,771
68
432
2,271
970
446
99
2
97
1,614
32
134
1,780
1,058
487
107
54
90
1,795
32
172
1,999
Notional Cashflow Summary
Notional Revenue (produced oz)
All-in Sustaining Costs
Mine Operating Cashflow
Growth Capital
Plant & Equipment
Exploration Spend
Net Mine Cashflow
A$ M
A$ M
A$ M
A$ M
A$ M
A$ M
A$ M
150
(92)
58
(8)
(2)
(5)
21
36
(30)
6
(0)
(0)
(0)
6
186
(122)
64
(8)
(2)
(5)
49
657
(514)
143
(48)
(24)
(19)
52
9
Q4 Key Metrics – Profitability enhanced
Westgold Monthly AISC ($’m) & ($/oz)
Simplicity + Efficiency = Profitability
▪
Operating discipline improving
▪
Cost management improving
▪
Big Bell and Bluebird expanding
▪
Starlight and Paddy’s Flat being
right sized
Benefits seen in June Quarter
▪
Efficiencies and cost out
programmes delivering benefits in
Q4
▪
Higher gold production reduced
AISC/oz by 15% to $1,780/oz
Reset
plan
activated
10
MURCHISON - Operational Summary
Murchison Operation
HG
tonnes
grade
HG Ounces
mined
Big Bell
290,075
2.8
25,984
Tuckabianna Processing Hub
337,266
2.5
Paddy’s Flat
98,774
2.9
9,331
Bluebird
138,597
4.3
19,225
Bluebird Processing Hub
386,341
2.8
Recovery
Ounces
produced
▪
Processed ore tonnage increased by 8% - to 723.6kt compared to
the previous quarter (Q3: 671.9kt).
▪
86%
91%
23,336
Q3 production was more heavily impacted by weather
events that interrupted high-grade ore haulage from the
mines.
▪
Head grade was up at 2.7g/t Au (Q3: 2.6g/t Au) driven by higher
grades being achieved from all mines, even with higher stockpile
volumes being processed.
▪
Key mines outperformed
31,829
▪
▪
Big Bell – producing 290kt at 2.8g/t Au for 26koz mined
▪
Bluebird – producing 139kt at 4.3g/t Au for 19koz mined
Bluebird UG expansion efforts have achieved monthly mining
records in the quarter.
▪
▪
Continuing to
programme.
conduct
extensive
resource
drilling
Big Bell Deeps expansion study expected to be complete in Q1
FY24, with external reviews and test work pointing to an
operating plan that materially extends the mine life, grade and
production profile.
11
MURCHISON – Drilling extending planning horizons
Drilling to extend mine life - better results from Q4 include:
▪
Paddy’s Flat
▪
▪
Consols
▪
6.81m at 11.95g/t Au from 55m in 23CNDD103
▪
10.34m at 9.67g/t Au from the collar in 23CNDD113
▪
Mudlode
▪
20.00m at 4.14g/t Au from 50m in 23MUDD175
▪
14.59m at 3.71g/t Au from 47m in 23MUDD222
Bluebird
▪
▪
5.19m at 30.91g/t Au from 231m in 22BLDD259
▪
19.59m at 3.94g/t Au from 140m in 23BLDD025
▪
9m at 13.6g/t Au from 638m in 23BLDD089
Big Bell
▪
39m at 2.75g/t Au from 433m in 22BBDD0119C
▪
9m at 4.39g/t Au from 598m in 22BBDD0119C
▪
32.61m at 3.86g/t Au from 648m in
22BBDD0123A
12
Fender – restart expected in October 2023
▪ Fender was paused in August 2022
▪ whilst Westgold focused on asset consolidation
▪ Business now stabilised and profitable
▪ economic environment supports restart
▪ Ore to be transported to Meekatharra Processing Hub
▪ Westgold has optionality over where ore is processed
▪ Approximate mining rate of ~330ktpa @ 2.7g/t
▪ For ~17koz in FY24
13
BRYAH - Operational summary
▪
‘Right sizing’ the Starlight mine
▪
▪
Mined grade increased 14% compared to Q3
▪
▪
▪
grade
Starlight Mine
163,137
2.5
12,942
Fortnum Processing Hub
194,569
2.2
Recovery
Ounces
produced
95%
13,212
impacted by minor maintenance requirements
Continued accelerated grade control and resource definition
drilling
▪
▪
new management team resetting operating practises to focus
on grade extraction, not tonnage
Bryah Operation
HG
Ounces
mined
Process plant throughput was 1% lower than Q3
▪
▪
Produced 163kt at 2.5g/t Au for 12.9koz mined
HG
tonnes
core backlog removed
Results returned from drilling activities at Nightfall support the view
the orebody can be a higher grade feed source:
▪
16.48m at 16.50g/t Au from 38m in NF1160GC06
▪
9.62m at 35.04g/t Au from 165m in NF1205GC078
Better results returned from drilling activities at Trevs:
▪
25.6m at 7.79g/t Au from the collar in TR1173GC02
14
Extending mine lives – 7 rigs on extensional + 2 on exploration
2
2
2
1
15
Q4 Exploration & Growth – Multiple targets
2,563m of Diamond Drilling (DD) at Great Fingall Deeps
▪
Outstanding results returned during the period include:
5.00m @ 5.66g/t Au from 869.00m in hole GFD011_23W1 (Upper Fingall Reef)
4.20m @ 5.46g/t Au from 912.80m in hole GFD011_23W1 (Lower Fingall Reef)
1.30m @ 46.72g/t Au from 849.70m in hole GFD019_23W1 (Upper Fingall Reef)
5.50m @ 16.68g/t Au from 925.00m in hole GFD019_23W1 (Lower Fingall Reef)
10.06m @ 3.02g/t Au from 948.94m in hole GFD020_23W1 (Upper Fingall Reef)
10.50m @ 2.58g/t Au from 997.00m in hole GFD020_23W1 (Lower Fingall Reef)
▪
49% increase to Mineral Resource Estimate for Great Fingall to 4.3Mt at
4.3g/t Au for 588koz
▪
FID on Great Fingall study expected in Q1 FY24
Exploration drilling commenced on other priority targets in the quarter
▪
RC programs completed across 4 earlier stage targets including Fingall
North and Lady Forrest at Day Dawn, and Pegasus North, Lady Kathleen
and Rand West at Reedy’s.
▪
Commenced AC programs investigating early encouragement from the
Emerald Bore regional target north of Meekatharra.
16
Q4 FY23 – closing cash, bullion and liquids up A$24M to A$192M
Q4 Closing Cash, Bullion and Liquid Assets grows to $192M ($M)
+$24M
▪
Westgold remains debt free
▪
Q4 gold sales of 66,577oz - revenue of A$181M
▪
(113)
▪
181
(14)
(11)
(5)
192
(5)
0
(1)
168
Closing Cash, Bullion
and Liquid Assets
Closing Investments
Closing Bullion
Closing Cash
Lease Payments
Working Capital
Working
Capital
Inventories - stockpiles
Sustaining Capital
Operating Cash Costs
Revenue
Opening Cash
Opening Investments
Opening Bullion
Exploration
Capital
Expenditure
Operating
Opening Cash, Bullion
and Liquid Assets
8
150
PP&E
8
Growth Capital
10
(6)
176
8
Achieved gold price of A$2,721/oz
Operating cash costs including sustaining capital
maintained – Q4 A$127M (Q3: A$126M)
▪
reflects changes to the operating plan
▪
reduction in the price of diesel and key
consumables
▪
Capital expenditure stabilised – includes the Clean
Energy Transition (CET) Project (A$3M)
▪
Exploration spend continues in line with Westgold’s
strategy to invest in its extensive tenement holdings
▪
Growth funds were not drawn down in Q4
17
Fully leveraged to the gold price from August
Westgold to clear its hedge book by July
Hedge book reduced during Q4 to 10,000oz
148
▪ at an average A$2,459/oz
135
Forward contracts remaining (koz)
122
30,000oz of Zero Cost Collars in FY24
109
▪ Contingent deliveries of 2,500oz per month
from July 2023 to June 2024, subject to the
put and call being struck
96
83
70
60
▪
Protects the downside of gold price
volatility with the put option only being
triggered if the gold price falls to
A$2,700/oz.
▪
The upside on this small volume of
production is correspondingly capped
and again, only triggered if the gold price
hits A$3,340/oz
50
40
30
20
10
Jun
22
Jul
22
Aug
22
Sep
22
Oct
22
Nov
22
Dec
22
Jan
23
Feb
23
Mar
23
Apr
23
May
23
Jun
23
Jul
23
18
Westgold declines to improve takeover offer for Musgrave
2 June 2023
3 July 2023
4 July 2023
24 July 2023
Westgold announces
all scrip takeover offer
for Musgrave
Ramelius announces
competing offer
Westgold announces
intent not to improve
offer
Westgold offer closed
1 Westgold ordinary share
for every 5.37 Musgrave
shares held.
$0.04 in cash and 1
Ramelius share for every
4.21 Musgrave share.
Westgold maintains
disciplined approach to
M&A.
Implied an undiluted
equity value for Musgrave
of $177.3 million or $0.30
per share.
Implied an undiluted
equity value for Musgrave
of $201 million or $0.34
per share.
All acceptances made
under the Westgold offer
were made null and void
on 24 July 2023.
19
Westgold’s FY24 strategic priorities
Continue to safely
and efficiently
optimise our assets
Invest in resource
development and exploration
drilling
Continue free cash
flow generation
Sensibly invest in technology
that drives cost reduction
Increase mine life of
our existing mines
Assess inorganic growth
opportunities aligned to our
core capabilities
20
Want to know more ?
Investor Relations
kasun.liyanaarachchi@westgold.com.au
Media
peter.knight@westgold.com.au
www.westgold.com.au
ASX : WGX 21
Share your feedback
Discover