Q4, FY23 production of 68,377oz Au
at AISC of $1,780/oz
Q4, FY23 HIGHLIGHTS
13% increase in gold production - and 15% reduction in ASIC
compared to Q3
Doubled mine operating cash flow to $64M - from $32M in Q3
MEDIA
Peter Knight | Communications Advisor
Peter.Knight@westgold.com.au
CONTACT US
Westgold Resources Limited (ASX: WGX)
ACN 009 260 306
Level 6, 200 St Georges Terrace, Perth WA 6000
+61 8 9462 3400
perth.reception@westgold.com.au
www.westgold.com.au
All currency is AUD unless stated otherwise
Bluebird and Big Bell mines outperformed, with both
achieving quarterly production records and generating
material net cash inflow
o
Starlight and Paddy’s Flat optimisation well progressed
7% reduction in total recordable injury frequency rates (TRIFR)
to 8.37 - compared to Q3
Full year FY23 guidance met – with Westgold delivering top end
of production guidance (257,116oz Au) at mid-point of AISC
cost guidance ($1,999/oz Au)
Closing cash and liquid assets to $192M - up $24M compared
to Q3
Aggressive resource drilling programme continues with 9 rigs
operating with better results including:
o
5.19m at 30.91g/t Au from 231m (22BLDD259 – Bluebird)
o
6.81m at 11.95g/t Au from 55m (23CNDD103 – Paddy’s
Flat)
o
5.50m @ 16.68g/t Au from 925.00m (GFD019_23W1 Lower Fingall Reef)
49% increase in revised Mineral Resource Estimate for Great
Fingall
Hedge position reduced to 10,000 oz - with the Group’s fixed
forward programme complete in July
Off market takeover offer for Musgrave Minerals – declined to
increase offer and all acceptances are now null and void
Kasun Liyanaarachchi | IR Manager
Kasun.Liyanaarachchi@westgold.com.au
o
Westgold Managing Director, Wayne Bramwell commented:
“Westgold’s outstanding Q4, FY23 results demonstrate what
our business can deliver when our teams execute to plan.
Our momentum continues and this was the second
consecutive quarter where we built cash, evidencing our cost
out and business improvement programmes are beginning to
be effective.
We delivered the full year guidance as stated and start FY24
from a position of financial strength. With full exposure to the
gold price from August and our organic growth opportunities
advancing rapidly, we have growing confidence in our team’s
ability to expand the scale and profitability of the business in
the year ahead.”
ASX: WGX
EXECUTIVE SUMMARY - QUARTER IN REVIEW
Westgold Resources Limited (ASX: WGX, Westgold, the Group or the Company) is pleased to report results for the
period ending 30 June 2023 (Q4, FY23).
Group production output was strong with Westgold producing 68,377oz at a very competitive AISC of $1,780/oz in
Q4, FY23 representing a 13% increase in gold production and 15% reduction in ASIC compared to Q3, FY23. For the
full FY23 financial year, Westgold produced 257,116oz at an AISC of $1,999/oz thus delivering the top end of its
FY23 production and mid-point of its cost guidance.
Two consecutive quarters of cash build and a growing cash, bullion and liquid asset position is beginning to validate
the significant changes made early in FY23 and sets Westgold up to continue to deliver safe and profitable gold
production for its stakeholders and shareholders into FY24.
+13%
68,377
66,048
62,180
Q3 FY23
Q4 FY23
2,635
2,721
Q1 FY23
Q2 FY23
2,411
2,460
2,106
2,032
2,094
126
127
139
Gold produc�on (oz)
60,512
1,780
Achieved gold price ($/oz)
AISC ($/oz)
-4%
122
AISC ($M)
Q1 FY23
Q2 FY23*
Q3 FY23
Q4 FY23
* Q2 FY23 AISC adjusted post audited Half-Year Financial Report for the period ended 31 December 2022
Figure 1 – Westgold Production (oz), Achieved Gold Price & AISC ($/oz)
Gold sales for the quarter were 66,577oz at an achieved gold price of $2,721/oz generating revenues of $181M.
Westgold has improved its operating margin by 74% compared to the prior quarter, with the achieved gold price of
$941/oz over AISC equating to $64M of mine operating cashflow.
AISC for Q4 of $122M was lower compared to Q3 of $127M due to lower monetisation of surface stockpiles in Q4
with a build-up in the Murchison offset by a drawdown in the Bryah (Q4 $0.1M vs Q3 $4.8M). Capital expenditure
during Q4 was $10M, which was invested in growth and development capital predominately for the expansion at
Bluebird and Big Bell underground mines.
Investment in exploration and resource development of $5M for the quarter brings the full year spend in line with
FY23 exploration expenditure guidance.
The net mine cashflow for Q4 was $49M (refer Table 1 under Group Performance Metrics).
JUNE 2023
QUARTERLY ACTIVITIES REPORT
2
ASX: WGX
Environmental, Social and Governance (ESG)
CET Project - Tuckabianna Hybrid Power facility in operation
Westgold’s first hybrid power station was commissioned in July at the Tuckabianna site, near Cue.
The Tuckabianna Facility uses a combination of solar, battery storage and liquefied natural gas (LNG) to
deliver a reduction of approximately 15kt of CO2 equivalent emissions, 10 million litre reduction in annual
diesel usage and a meaningful reduction in the cost of power. The facility includes a 6 MW solar farm
fitted with 11,088 photovoltaic panels, a battery energy storage system with 2.4 MW installed capacity,
and a 9.5 MW gas-fuelled power station.
Tuckabianna is the first of four Hybrid power stations Westgold intend on bringing online, with all four
facilities expected to be in operation by Q3 FY24. The Fortnum and Big Bell Hybrid facilities are well
progressed in their commissioning and expected to commence power generation in Q2 FY24.
The four new hybrid power facilities, which replace five diesel-fired power stations will reduce carbon
emissions by approximately 56 per cent on the existing diesel facilities, with a 38 million litre reduction
per annum in diesel fuel usage.
The project, once fully commissioned, will deliver a significant reduction in the cost of power of
approximately $60/oz 1.
Figure 2 - 6MW solar farm at Tuckabianna
1
At a diesel price assumption of $1.64/L
JUNE 2023
QUARTERLY ACTIVITIES REPORT
3
ASX: WGX
Environment, Health and Safety (EH&S)
Westgold completed the FY23 reporting period having achieved significant improvement across all EH&S
metrics for the financial year.
The Total Recordable Injury Frequency Rate (TRIFR) decreased 7.31% for the quarter from 9.03 to 8.37,
and the Lost Time Injury Frequency Rate (LTIFR) remained steady at 0.64 following two reclassified lost
time injuries from Q3. The Company’s High Potential Incident Frequency Rate (HiPo) reduced over the
period from 7.02 to 6.76 and Westgold recorded zero Significant Psychosocial Harm or Significant
Environmental Events in the same timeframe.
Key EH&S achievements for the quarter included the completion of Westgold’s inaugural ESG Materiality
Assessment and the completion of the Group wide roll out of the Leading @ Westgold internal Leadership
programme.
Westgold's significant improvement in EH&S performance can be attributed to the successful
implementation of its FY23 EH&S Strategy, encompassing a wide range of key leadership, systems, and
process improvements across the group.
Key safety performance indicators are summarised in Figure 3 below.
Figure 3 – Quarterly Health & Safety LAG Indicator Performance
COVID-19 Management
There were minimal cases recorded within Westgold’s operations for Q4 FY23. The Company continues
to monitor case numbers reported within Western Australia and maintains its residual controls for the
management of COVID-19.
JUNE 2023
QUARTERLY ACTIVITIES REPORT
4
ASX: WGX
GROUP PERFORMANCE METRICS
Westgold’s quarterly physical and financial outcomes for Q4, FY23 are summarised in Table 1 below.
The Group operates across the Murchison and Bryah regions of Western Australia with our Murchison Operations
incorporating three underground mines (Big Bell, Bluebird and Paddy’s Flat) and two processing hubs (Tuckabianna
and Bluebird) between Cue and Meekatharra. The Bryah Operation is 160km by road from Meekatharra and
incorporates the Starlight underground mine and the Fortnum processing hub.
Table 1 – Westgold June QTR FY23 and FY23 Performance
Physical Summary
MURCHISON
JUN QTR
FY23
BRYAH
JUN QTR
FY23
GROUP
JUN QTR
FY23
GROUP
FY23
Units
ROM - UG Ore Mined
t
527,445
163,137
690,582
2,943,418
UG Grade Mined
g/t
3.2
2.5
3.0
2.8
Ore Processed
t
723,607
194,569
918,176
3,625,035
Head Grade
g/t
2.7
2.2
2.6
2.5
Recovery
%
89%
95%
90%
90%
Gold Produced
oz
55,165
13,212
68,377
257,116
Gold Sold
oz
53,623
12,954
66,577
256,009
A$/oz
2,721
2,721
2,721
2,556
Mining
A$/oz
980
926
970
1,058
Processing
A$/oz
423
545
446
487
Achieved Gold Price
Cost Summary
Admin
A$/oz
96
110
99
107
Stockpile Movements
A$/oz
(26)
118
2
54
Royalties
A$/oz
103
72
97
90
Cash Cost (produced oz)
A$/oz
1,576
1,771
1,614
1,795
Corporate Costs
A$/oz
24
68
32
32
Sustaining Capital
A$/oz
63
432
134
172
All-in Sustaining Costs
A$/oz
1,662
2,271
1,780
1,999
Notional Revenue (produced oz)
A$ M
150
36
186
657
All-in Sustaining Costs
A$ M
(92)
(30)
(122)
(514)
Mine Operating Cashflow
A$ M
58
6
64
143
Growth Capital
A$ M
(8)
(0)
(8)
(48)
Plant & Equipment
A$ M
(2)
(0)
(2)
(24)
Exploration Spend
A$ M
(5)
(0)
(5)
(19)
Net Mine Cashflow
A$ M
43
6
49
52
Notional Cashflow Summary
JUNE 2023
QUARTERLY ACTIVITIES REPORT
5
ASX: WGX
OPERATIONS OVERVIEW
Group Performance
Strong production results from Big Bell and Bluebird underground mines underpinned a 6% improvement in the
Group’s total ore processed of 918,176t (Q3 - 869,355t) at an improved grade of 2.6g/t Au (Q3 - 2.4g/t Au), for
production of 68,377oz of gold (Q3 - 60,512oz).
Ore haulage and gold production was impacted early in the quarter by a significant rainfall event which occurred
at the end of March across the Murchison and Bryah regions. This event closed many regional roads and
interrupted the transportation of high-grade ore from Westgold’s mines to processing hubs, increasing the
reliance on surface stocks of low-grade material for mill feed in the first weeks of April. Despite these issues, all
three processing hubs continued to operate during this difficult period.
Group AISC in Q4 reduced quarter on quarter (QoQ) to $122m (Q3 - $127m), with the AISC/oz in Q4 decreasing
QoQ by 15% to $1,780/oz (Q3 - $2,094/oz) driven by higher mined grades and increased mill throughput.
On a mine by mine production basis in Q4, FY23:
Big Bell continued to outperform, with increased tonnes mined at higher grade compared to the prior
quarter, producing 290kt of ore mined at 2.8g/t Au for 26koz of gold. Grade improved as larger volumes
of ore from the higher-grade north side of the cave was accessed. The mined grades from Big Bell are
expected to track back closer to its reserve grades in the coming quarters. Business improvement
initiatives continue to deliver with increased equipment efficiency and enhanced planning contributing
to the mine’s outperformance.
Bluebird continued to steadily expand in Q4 FY23, achieving record monthly mining rates at higher grades.
The mine delivered 139kt of ore mined at 4.3 g/t Au for 19koz of gold. The boundaries of the Bluebird
and South Junction system have not yet been defined and as such Westgold continues to conduct
extensive resource drilling programme to expand the mine’s footprint and understand the South Junction
opportunities.
Paddy’s Flat is transitioning to a smaller scale, yet higher grade operation with this transition complete in
Q1 FY24 (as the mining of the main Prohibition ore system winds down). This transition process has been
successful, resulting in Paddy’s Flat delivering an improved economic outcome of 99kt of ore at 2.9g/t Au
for 9.3koz of gold. Improvements to Paddy’s Flat performance are expected to continue in the coming
quarter with more volume planned from the Hendrix and Consol’s high grade work areas.
Starlight continued to work through planning legacies with the new management team now embedded
has begun delivering improved operating performance, with Starlight mining 163kt of ore at 2.5g/t Au
for 12.9Koz, a 32% increase mined ounces over Q3, FY23.
Open pit and low-grade stocks – Westgold continued to monetise its inventory of low grade and open pit
stocks built during FY22 to manage mill blend and throughput requirements.
JUNE 2023
QUARTERLY ACTIVITIES REPORT
6
ASX: WGX
Table 2 – Q4, FY23 Processing Physicals
MURCHISON
Ore Milled
(‘000)
Head Grade
(g/t)
Recovery
(%)
Q4 Gold Production
(Oz)
Paddy’s Flat
134
2.64
85
9,716
Bluebird
157
4.04
95
19,446
Open Pit & Low Grade
94
1.11
81
2,667
BLUEBIRD HUB
386
2.8
91
31,829
Big Bell
286
2.75
86
21,798
Open Pit & Low Grade
51
1.07
85
1,538
TUCKABIANNA HUB
337
2.5
86
23,336
BRYAH
Ore Milled
(‘000)
Head Grade
(g/t)
Recovery
(%)
Q4 Gold Production
(Oz)
Starlight
171
2.44
97
12,851
Open Pit & Low Grade
24
0.64
96
361
FORTNUM HUB
195
2.2
95
13,212
GROUP TOTAL – 3 HUBS
918
2.6
90
68,377
Aggressive resource drilling continues to extend mine planning horizons of the four key operating assets with
nine underground and surface rigs operating. In parallel, optimisation studies are being conducted across the
three paused assets (South Emu-Triton, Comet and Fender mines) to determine when they should be
restarted.
The Fender mine will be the first of these assets to restart in Q1, FY24 with first ore expected in early Q2, FY24.
The Great Fingall mining study is now complete and on the back of significant resource update, a final
investment decision is expected during Q1, FY24.
The Big Bell Deeps expansion study is close to completion. The new operating plan materially extends the mine
life, grade and production profile of the orebody and a financial investment decision is expected in Q2, FY24.
Expenditure
o
Operating Costs
The June quarter saw the AISC reduced for the company (Q4 $122M vs Q3 $127M), due to:
•
lower consumption (and hence monetisation) of surface stockpiles (Q4 $0.1M vs Q3 $4.8M) built
during FY22, thus driving the AISC lower (non-cash movement);
•
reduction of diesel fuel price;
•
stabilisation and renegotiation in the price of many key consumables; and
•
optimisation and efficiency improvements in all the operating mines.
JUNE 2023
QUARTERLY ACTIVITIES REPORT
7
ASX: WGX
The changes to the operating plan and the pausing of smaller or marginal mines have seen the continued
cost benefits flowing through in Q4 (refer Figure 4).
Figure 4 – Westgold Monthly AISC ($’m) & ($/oz)
o
Capital Expenditure
Capital expenditure during Q4 was $10M (Q3 - $15M), which was invested in growth and development
capital predominately for the ongoing expansion of the Bluebird and Big Bell underground mines.
Exploration and resource development spend increased as planned to approximately $5M (Q3 - $4M).
This is due to scheduling as Westgold continues to invest in expansion and discovery within its extensive
tenement holdings.
Over FY23, the growth capital expenditure of $72M exceeded FY23 guidance of $60M as previously
communicated due to the acceleration of expansion activities (a second decline) at the Bluebird
underground mine and the early restart of the Big Bell decline to access the proposed long hole open
stoping (LHOS) area at Big Bell Deeps.
Exploration expenditure for FY23 of $19M in line with FY23 guidance of $20M.
JUNE 2023
QUARTERLY ACTIVITIES REPORT
8
ASX: WGX
MURCHISON OPERATIONS
The Murchison Operations comprise three underground mines (Big Bell, Bluebird and Paddy’s Flat) and two
processing hubs (the 1.6-1.8Mtpa Bluebird plant at Meekatharra and the 1.4Mtpa Tuckabianna plant near Cue).
The combined Murchison Operations produced 55,165oz of total Group production at an AISC of $1,662/oz. Grade
and metallurgical recovery continued to improve across the Murchison with another record quarter from both
Bluebird and Big Bell undergrounds.
Figure 5 – Murchison Gold Production and AISC
Meekatharra
The Bluebird processing hub processes ore from the Paddy’s Flat and Bluebird underground mines (refer Figure 6)
and various surface stockpiles in the region.
Bluebird Processing Hub
The Bluebird Processing Hub produced 31,829oz (Q3 – 26,964oz) by processing 386,341t of ore (Q3 –
349,989t), a record ounce output for the operation. Higher mill feed grades of 2.8g/t Au (Q3 2.7g/t)
predominantly as a result of higher grade from the Bluebird underground and increased metallurgical recovery
of 91% contributed to the record production.
Mill utilisation continues to improve with steady feed from the Meekatharra underground mines
supplemented with open pit stockpiles.
JUNE 2023
QUARTERLY ACTIVITIES REPORT
9
ASX: WGX
Figure 6 – Murchison Operations
Bluebird Underground
The Bluebird mine produced a record 138,597t at 4.3g/t Au for the quarter.
Bluebird delivered another a sensational quarter, with a 35% quarter on quarter improvement to mined tonnes
(Q3 – 102,692t) and a 16% improvement to mined grade (Q3 – 3.7g/t). The works on the second decline
commenced here in Q3, providing more work areas and earlier access to the southern mining fronts. During
the quarter the ventilation system was also expanded to ensure the operation is well placed to continue with
the mining rates established in the current quarter going forward.
Bluebird Near Mine Exploration and Development
The exceptional production results at Bluebird have been accompanied by a string of excellent drill results
which have further expanded the resource base and translated directly to extensions to the mine plan.
Results such as 5.19m at 30.91g/t Au from 231m in 22BLDD259, 19.59m at 3.94g/t Au from 140m in
23BLDD025 and 9m at 13.6g/t Au from 638m in 23BLDD089 highlight the extraordinary quality of the Bluebird
orebody, with Westgold operating three drill rigs for the majority of the quarter to both extend the Bluebird
zone and undertake initial quantification of the proximal South Junction lodes.
JUNE 2023
QUARTERLY ACTIVITIES REPORT
10
ASX: WGX
Westgold intends to maintain the momentum of the Bluebird expansion, with a number of underground drill
platforms being developed to assist with extensional drilling.
Figure 7 - Bluebird cross section with recent drill results
Paddy’s Flat Underground
The Paddy’s Flat mine produced 98,774t at 2.9 g/t Au for the quarter.
Paddy’s Flat as previously mentioned, is being optimised at lower output with the mine delivering reduced
tonnage in Q4 as planned (Q3 - 170,183t). Q4 mined grade increased with lower volumes coming from the
Prohibition mining area.
Prohibition bulk stopes remain challenging with lowering overall grade and although plans have been
established to ensure a more optimal outcome, accelerating the shift to extract the more metallurgically
benign and higher grade Fenian’s - Consols ore, including the very high-grade SE Spur are the key focus moving
forward.
Paddy’s Flat Near Mine Exploration and Development
Eight years after commencement of mining at Paddy’s Flat, first production from the high-grade virgin
extension of the Fenian’s - Consols system has been achieved. This is a significant milestone in the process of
right-sizing Paddy’s Flat to ensure its future as a smaller-scale, high grade mine now bulk Prohibition ore lodes
are coming to an end.
Drilling efforts to support this new phase of mining at Consols have continued to provide encouragement, with
results such as 6.81m at 11.95g/t Au from 55m in 23CNDD103 and 10.34m at 9.67g/t Au from the collar in
23CNDD113 supporting Westgold’s expectations around production grade from Consols.
Additional works testing extensions to the Mudlode orebody have increased confidence, with results such as
20.00m at 4.14g/t Au from 50m in 23MUDD175 and 14.59m at 3.71g/t Au from 47m in 23MUDD222 being
amongst the better intervals returned this quarter.
Refer to Appendix B for details of significant drilling results from Meekatharra.
JUNE 2023
QUARTERLY ACTIVITIES REPORT
11
ASX: WGX
Cue
Westgold’s Tuckabianna Processing Hub processes ore from one underground mine at Cue (Big Bell) and
supplemented with regional open pit ore and surface stocks.
Tuckabianna Processing Hub
The Tuckabianna Processing Hub produced 23,336oz of gold in Q4 (Q3 – 21,664oz).
The hub performed consistently processing 337,266t (Q3 – 321,928t) of ore at 2.5 g/t Au (Q3 2.4g/t) with an
86% metallurgical recovery. Weather related constraints impacted ore haulage at the start of the quarter,
resulting in increased volumes of lower grade stockpiles in the mill feed.
Big Bell Underground
The Big Bell mine produced a record 290,075t at 2.8 g/t Au for the quarter.
The production record was delivered due to the mine producing increased ore volumes at higher grades. The
cave is now at the 685 level, opening more production fronts and allowed access to some very high grades
mid-way through the quarter. Mined grades are expected to return closer to reserve grades over the ensuing
quarters as high-grade zones are depleted.
Near Mine Exploration and Development
Cue has seen a rapid increase in resource development activities this quarter supporting the growth pathway
for the operations.
o
Great Fingall
Great Fingall has seen significant progress this quarter. The feasibility study works are complete and on
track to be delivered to the Board for consideration prior to the end of Q1 FY24. Key geotechnical and
ventilation studies have been completed which represent major project milestones.
Additionally, two drill rigs have been mobilised to site to assist with defining potential remnant mining
opportunities adjacent to the historical Great Fingall mine workings. While the Feasibility study prime
focus remains on gaining early access to virgin ore, there may be opportunities to achieve early mine
cashflow.
o
Big Bell
At Big Bell, the Expansion Feasibility Study works have continued, with the study remaining on track for
delivery prior to the end of the Q1 FY24. Key achievements have been the completion of the paste testwork programme, advancement of the paste plant design and progression of backfill study.
Westgold is engaging with suppliers to ensure key contracts are in place for long lead time items and
critical services.
In parallel to the Expansion Feasibility Study works, the ongoing drilling programme at Big Bell has been
accelerated with a second drill rig mobilised in June to assist with further definition around the 50.37m
at 5.05g/t Au from 746.6m (true width 15m) in–22BBDD0120A reported last quarter (refer ASX – Bell
Expansion Drilling Update 29 March 2023).
Better results received this quarter include 39m at 2.75g/t Au from 433m and 9m at 4.39g/t Au from
598m both in 22BBDD0119C and 32.61m at 3.86g/t Au from 648m in 22BBDD0123A (refer to Figure
8).
JUNE 2023
QUARTERLY ACTIVITIES REPORT
12
ASX: WGX
Figure 8 - Recent drill results at Big Bell
JUNE 2023
QUARTERLY ACTIVITIES REPORT
13
ASX: WGX
BRYAH OPERATION
Westgold’s Bryah Operation is underpinned by one underground mine (Starlight) with the Fortnum processing hub
supplemented with regional open pit ore and surface stocks (Figure 9).
Figure 9 – Westgold’s Bryah Operation
The Bryah Operation’s performance improved in Q4 compared to Q3, with 13,212oz produced (Q3 – 11,904oz) at an
AISC of $2,271/oz (Q3 – $2,414/oz). The current quarter was only marginally impacted by the severe rain event and
sill pillar failure which drove the lower production in Q3 FY23.
After a detailed operational review and underground management restructure, Westgold is confident the AISC at
Bryah is back under control.
JUNE 2023
QUARTERLY ACTIVITIES REPORT
14
ASX: WGX
Figure 10 below summarises the key outputs and costs by quarter at the Bryah Operation over the past 12 months.
Figure 10 – Bryah Gold Production and AISC
Fortnum Processing Hub
Throughput at the Fortnum processing hub was below target, resulting in 194,569t of ore being processed
(Q3 – 197,438t) at a grade of 2.2g/t Au (Q3 – 1.9g/t) and 95% metallurgical recovery. Throughput was
negatively impacted by a temporary reduction to mill availability predominantly due to issues with new mill
liners and transitioning to the new tailings facility. These issues have since been rectified.
Lower throughput was more than offset by a 16% improvement in feed grade, resulting in 13,212 oz produced
in Q4 (Q3 – 11,904oz).
Starlight Underground
Starlight’s recently appointed management team has continued to execute the new mine plan and implement
additional business improvement opportunities, translating to enhanced mine performance in Q4 FY23.
Production increased to 163,137t (Q3 – 135,889t) at a grade of 2.5g/t Au (Q3 – 2.2g/t) for 12.9koz mined (Q3
– 9.8koz).
Aggressive grade control and resource definition drilling continued during the quarter and now there is
negligible core backlog, with information allowing better future decisions to be made.
Vast stockpiles remain at Fortnum and a ‘right sized’ Starlight delivering lower tonnage to the Fortnum mill at
a higher grade will provide a superior economic outcome.
JUNE 2023
QUARTERLY ACTIVITIES REPORT
15
ASX: WGX
Near Mine Exploration and Development
After an intensive six months of technical work and focus on operational discipline, the turnaround process at
Starlight is well underway.
An immense amount of effort has gone into acquiring and integrating sufficient geological data to provide
certainty around the next three years of the mine plan at Starlight, which in turn allows for more robust
schedules to be developed. With this achieved, a significant portion of drilling time during the current quarter
has been spent focusing on the high-grade Nightfall zone adjacent to the main Starlight workings. 16.48m at
16.50g/t Au from 38m in NF1160GC06 and 9.62m at 35.04g/t Au from 165m in NF1205GC078 are amongst
the more impressive results returned at Nightfall this quarter.
These augur well for the ongoing ability of Nightfall to act as a higher grade feed source to complement
baseload Starlight production.
Figure 11 – Starlight cross section showing Nightfall target area
Additionally, the site team has taken the opportunity to gain a better understanding of the structurally complex
Trev’s mineralisation. A significant portion of the Trev’s orebody has been capitally developed, and although
production out of this zone has been relatively minor in recent quarters, results such as 25.6m at 7.79g/t Au
from the collar in TR1173GC02 highlight the capacity of this zone to provide high grade mill feed.
Additional works will be required to fully define the opportunity at Trev’s over the coming months.
Subsequent to quarter’s end, work also commenced on assessment of the Peak Hill suite of projects, with the
initial focus in this area being the major historic Fiveways mine.
Refer to Appendix A for details of significant drilling results from Bryah.
JUNE 2023
QUARTERLY ACTIVITIES REPORT
16
ASX: WGX
EXPLORATION AND GROWTH
Exploration
Exploration activities across the Company’s highly prospective ~1,300km2 tenement portfolio continued during Q4.
Key activities included:
2,563m of Diamond Drilling (DD) at Great Fingall Deeps;
4,154m of Reverse Circulation Drilling (RC) at the Fingall North, Pegasus North, Lady Kathleen and Rand
West targets; and
8,877m of Aircore (AC) drilling at the Emerald Bore target.
Target locations are shown on Figure 12.
No exploration activities were completed within the Bryah Project tenure during the reporting period.
Figure 12 – Priority Exploration Targets Within the Murchison Project Tenure
JUNE 2023
QUARTERLY ACTIVITIES REPORT
17
ASX: WGX
Fingall Deeps – Day Dawn
The Fingall Deeps diamond drilling programme continued during April but was suspended during May to allow
a geological model update and a revision of the Mineral Resource Estimate. Drilling subsequently
recommenced in late June as part of the Fingall Deeps Stage 2 programme.
Outstanding results continued to be returned during the period including:
o
o
o
o
o
o
5.00m @ 5.66g/t Au from 869.00m in hole GFD011_23W1 (Upper Fingall Reef)
4.20m @ 5.46g/t Au from 912.80m in hole GFD011_23W1 (Lower Fingall Reef)
1.30m @ 46.72g/t Au from 849.70m in hole GFD019_23W1 (Upper Fingall Reef)
5.50m @ 16.68g/t Au from 925.00m in hole GFD019_23W1 (Lower Fingall Reef)
10.06m @ 3.02g/t Au from 948.94m in hole GFD020_23W1 (Upper Fingall Reef)
10.50m @ 2.58g/t Au from 997.00m in hole GFD020_23W1 (Lower Fingall Reef)
Refer Appendix C for details.
Figure 13 – Lower Fingall Reef In Hole GFD019_23W1 Returned 5.50m @ 16.68g/t Au (Assays Annotated)
o
Revised Geological Model and Mineral Resource Estimate
Geological logging and interpretation of the early holes suggested the then current geological model,
which had the Fingall Reef flattening at depth with a series of footwall reefs, required revision. This
historic model was largely informed by 1980s era drilling that had limited structural data (i.e. recording
of the strike and dip of intersected reefs) and hole 19GCDD028, drilled by Westgold in 2019, suggested
the Fingall Reef was flattening with depth (Figure 14a).
The revised geological model for Great Fingall (Figure 14b) positively predicts that the Fingall Reef
bifurcates (i.e. splits into two parallel reefs). This interpretation is based on the first round of Fingall
Deeps holes including 22GFDD006 and 22GFDD007 (refer ASX Release of 27
Share your feedback
Discover